EP3629844 - UPHOLSTERY SYSTEMS AND METHODS FOR FORMING A CURVED SURFACE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.02.2023 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 25.02.2022 | ||
Former | Grant of patent is intended Status updated on 18.10.2021 | ||
Former | Request for examination was made Status updated on 06.03.2020 | ||
Former | The international publication has been made Status updated on 01.12.2018 | ||
Former | unknown Status updated on 11.06.2018 | Most recent event Tooltip | 10.05.2024 | Lapse of the patent in a contracting state New state(s): HU | published on 12.06.2024 [2024/24] | Applicant(s) | For all designated states Steelcase Inc. 901 44th Street SE PO Box 1967 Grand Rapids, MI 49501 / US | [2020/15] | Inventor(s) | 01 /
SMITH, Bruce 915 Orchard Ave. S.E. East Grand Rapids, MI 49506 / US | 02 /
MCGOVERN, Ryan Noel 1560 Hawthorne Hills Ada, MI 49301 / US | 03 /
HIEN, Rolf Pascal Borstrasse 3a 01145 Radebeul / DE | 04 /
SPOELHOF, Mark 962 Collindale Ave. N.W. Grand Rapids, MI 49504 / US | 05 /
OPATIK, Gregory Joseph 3445 East Paris Ave. S.E. Grand Rapids, MI 49512 / US | 06 /
ROGGENTINE, Kade Alan 6968 Byron Lakes Drive S.W., Apt. 2A Byron Center, MI 49315 / US | [2020/19] |
Former [2020/15] | 01 /
SMITH, Bruce 915 Orchard Ave. S.E. East Grand Rapids, MI 49506 / US | ||
02 /
MCGOVERN, Ryan Noel 4088 Costa Ave. N.E. Grand Rapids, MI 49525 / US | |||
03 /
HIEN, Rolf Pascal Borstrasse 3a 01145 Radebeul / DE | |||
04 /
SPOELHOF, Mark 962 Collindale Ave. N.W. Grand Rapids, MI 49504 / US | |||
05 /
OPATIK, Gregory Joseph 3445 East Paris Ave. S.E. Grand Rapids, MI 49512 / US | |||
06 /
ROGGENTINE, Kade Alan 6968 Byron Lakes Drive S.W., Apt. 2A Byron Center, MI 49315 / US | Representative(s) | Potter Clarkson Chapel Quarter Mount Street Nottingham NG1 6HQ / GB | [N/P] |
Former [2020/15] | Potter Clarkson The Belgrave Centre Talbot Street Nottingham NG1 5GG / GB | Application number, filing date | 18727993.0 | 15.05.2018 | [2020/15] | WO2018US32735 | Priority number, date | US201762511764P | 26.05.2017 Original published format: US 201762511764 P | [2020/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018217496 | Date: | 29.11.2018 | Language: | EN | [2018/48] | Type: | A1 Application with search report | No.: | EP3629844 | Date: | 08.04.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 29.11.2018 takes the place of the publication of the European patent application. | [2020/15] | Type: | B1 Patent specification | No.: | EP3629844 | Date: | 30.03.2022 | Language: | EN | [2022/13] | Search report(s) | International search report - published on: | EP | 29.11.2018 | Classification | IPC: | A47C31/02, B60N2/58, B68G7/12 | [2020/15] | CPC: |
B68G7/12 (EP);
B68G7/052 (US);
A47C31/02 (US);
A47C31/023 (EP);
B68G7/10 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | POLSTERSYSTEME UND VERFAHREN ZUR AUSBILDUNG EINER GEKRÜMMTEN OBERFLÄCHE | [2020/15] | English: | UPHOLSTERY SYSTEMS AND METHODS FOR FORMING A CURVED SURFACE | [2020/15] | French: | SYSTÈMES DE CAPITONNAGE ET PROCÉDÉS DE FORMATION D'UNE SURFACE INCURVÉE | [2020/15] | Entry into regional phase | 25.11.2019 | National basic fee paid | 25.11.2019 | Designation fee(s) paid | 25.11.2019 | Examination fee paid | Examination procedure | 25.11.2019 | Examination requested [2020/15] | 25.11.2019 | Date on which the examining division has become responsible | 31.03.2020 | Amendment by applicant (claims and/or description) | 19.10.2021 | Communication of intention to grant the patent | 17.02.2022 | Fee for grant paid | 17.02.2022 | Fee for publishing/printing paid | 17.02.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 03.01.2023 | No opposition filed within time limit [2023/10] | Fees paid | Renewal fee | 30.03.2020 | Renewal fee patent year 03 | 11.05.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.05.2018 | AL | 30.03.2022 | AT | 30.03.2022 | CY | 30.03.2022 | CZ | 30.03.2022 | DK | 30.03.2022 | EE | 30.03.2022 | ES | 30.03.2022 | FI | 30.03.2022 | HR | 30.03.2022 | IT | 30.03.2022 | LT | 30.03.2022 | LV | 30.03.2022 | MC | 30.03.2022 | MK | 30.03.2022 | NL | 30.03.2022 | PL | 30.03.2022 | RO | 30.03.2022 | RS | 30.03.2022 | SE | 30.03.2022 | SI | 30.03.2022 | SK | 30.03.2022 | SM | 30.03.2022 | IE | 15.05.2022 | LU | 15.05.2022 | BE | 31.05.2022 | CH | 31.05.2022 | LI | 31.05.2022 | BG | 30.06.2022 | NO | 30.06.2022 | GR | 01.07.2022 | IS | 30.07.2022 | PT | 01.08.2022 | [2024/24] |
Former [2024/23] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
MK | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 15.05.2022 | ||
LU | 15.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2024/20] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 15.05.2022 | ||
LU | 15.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/35] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 15.05.2022 | ||
LU | 15.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/25] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 15.05.2022 | ||
LU | 15.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/20] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 15.05.2022 | ||
LU | 15.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/09] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
LU | 15.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/08] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
LU | 15.05.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/07] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/06] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/01] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/51] | AT | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/50] | AT | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/49] | AT | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/48] | AT | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/47] | AT | 30.03.2022 | |
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/44] | FI | 30.03.2022 | |
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/39] | FI | 30.03.2022 | |
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/36] | HR | 30.03.2022 | |
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/35] | HR | 30.03.2022 | |
LT | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
Former [2022/33] | LT | 30.03.2022 | |
NO | 30.06.2022 | Cited in | International search | [A]EP0784953 (CALIGO [FR]) [A] 1-21 * figures 9,10 *; | [A]WO0150920 (WALTER KNOLL GMBH & CO KG [DE], et al) [A] 1-21 * figure - *; | [A]JP2011121426 (TOYOTA BOSHOKU CORP) [A] 1-21* figure - *; | [A]DE202011100886U (PILSL MARIO [AT]) [A] 1-21 * figure - *; | [A]US2012284974 (YAMAMOTO KOUTA [JP], et al) [A] 1-21 * figure - *; | [A]DE102012023773 (GM GLOBAL TECH OPERATIONS INC [US]) [A] 1-21 * figure - * | Examination | US7575283 |