EP3638493 - PULTRUSION METHOD AND EQUIPMENT FOR PREPARING A FIBER-REINFORCED COMPOSITE [Right-click to bookmark this link] | Status | Examination is in progress Status updated on 02.09.2022 Database last updated on 18.10.2024 | |
Former | Request for examination was made Status updated on 20.03.2020 | ||
Former | The international publication has been made Status updated on 22.12.2018 | ||
Former | unknown Status updated on 23.06.2018 | Most recent event Tooltip | 17.10.2024 | New entry: Application deemed to be withdrawn: despatch of communication + time limit | Applicant(s) | For all designated states Covestro Deutschland AG Kaiser-Wilhelm-Allee 60 51373 Leverkusen / DE | [2024/04] |
Former [2020/38] | For all designated states Covestro Intellectual Property GmbH & Co. KG Kaiser-Wilhelm-Allee 60 51373 Leverkusen / DE | ||
Former [2020/17] | For all designated states Covestro Deutschland AG Kaiser-Wilhelm-Allee 60 51373 Leverkusen / DE | Inventor(s) | 01 /
GU, Yongming Room 202, Building 27 2250 Dongjing Road Pudong New District Shanghai 201208 / CN | 02 /
LI, Zhijiang Room 204, Building 4 No. 516 Zhouxiu Road Pudong District Shanghai 201318 / CN | 03 /
CHEN, James Room 107. No. 106, Lane 9. Shenqxinxihuan Road Hua Qiao, Kunshan. Suzhou City Jiangsu Province 215332 / CN | 04 /
ZHANG, Chenxi Room 2501, No. 6 1599 Ding Xiang Road Pudong District Shanghai 200135 / CN | 05 /
SUN, Guobin Room 401, Building 26 99 Liushan Road Pudong New District Shanghai 200135 / CN | 06 /
ZHANG, Hui Room 202 No. 281 Jiankang Road Zhujing Town Jinshan District Shanghai 201599 / CN | [2020/17] | Representative(s) | Levpat c/o Covestro AG Gebäude 4825 51365 Leverkusen / DE | [2020/17] | Application number, filing date | 18730349.0 | 11.06.2018 | [2020/17] | WO2018EP65296 | Priority number, date | CN201710467995 | 12.06.2017 Original published format: CN201710467995 | [2020/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018228972 | Date: | 20.12.2018 | Language: | EN | [2018/51] | Type: | A1 Application with search report | No.: | EP3638493 | Date: | 22.04.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.12.2018 takes the place of the publication of the European patent application. | [2020/17] | Search report(s) | International search report - published on: | EP | 20.12.2018 | Classification | IPC: | B29C70/52 | [2020/17] | CPC: |
B29C70/52 (EP,US);
B29C70/523 (CN,US);
B29C70/521 (EP,US);
B29C70/527 (US);
B29C70/54 (CN);
B29C70/865 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/17] | Title | German: | PULTRUSIONSVERFAHREN UND -GERÄT ZUR HERSTELLUNG EINES FASERVERSTÄRKTEN VERBUNDSTOFFS | [2020/17] | English: | PULTRUSION METHOD AND EQUIPMENT FOR PREPARING A FIBER-REINFORCED COMPOSITE | [2020/17] | French: | PROCÉDÉ ET ÉQUIPEMENT DE PULTRUSION POUR LA PRÉPARATION D'UN COMPOSITE RENFORCÉ PAR DES FIBRES | [2020/17] | Entry into regional phase | 13.01.2020 | National basic fee paid | 13.01.2020 | Designation fee(s) paid | 13.01.2020 | Examination fee paid | Examination procedure | 13.01.2020 | Examination requested [2020/17] | 13.01.2020 | Date on which the examining division has become responsible | 07.07.2020 | Amendment by applicant (claims and/or description) | 05.09.2022 | Despatch of a communication from the examining division (Time limit: M04) | 05.10.2022 | Reply to a communication from the examining division | 29.05.2024 | Despatch of a communication from the examining division (Time limit: M04) | 16.10.2024 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | Fees paid | Renewal fee | 15.06.2020 | Renewal fee patent year 03 | 14.06.2021 | Renewal fee patent year 04 | 26.05.2022 | Renewal fee patent year 05 | 29.05.2023 | Renewal fee patent year 06 | 30.05.2024 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [XI]GB2262470 (SHAW JOHN LTD [GB]) [X] 1,2,7-11,14 * figure -; claims 1,12,17 * [I] 3-6,12,13; | [XI]JP2004074427 (NITTO BOSEKI CO LTD, et al) [X] 1-3,5,7-11,13,14 * abstract; figure - *[I] 4,6,12; | [XI]AT514343 (ASAMER BASALTIC FIBERS GMBH [AT]) [X] 1-3,5,7-11,13,14 * page 28, paragraph last; figure -; claims 1,13 * [I] 4,6,12 | by applicant | CA2641050 | US2009023870 |