blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3631877

EP3631877 - ENERGY STORAGE MODULE AND METHOD FOR THE ASSEMBLY THEREOF [Right-click to bookmark this link]
Former [2020/15]ELECTROCHEMICAL CELL UNIT, ENERGY STORAGE MODULE AND METHOD FOR THE ASSEMBLY THEREOF
[2023/19]
StatusNo opposition filed within time limit
Status updated on  15.08.2024
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  08.09.2023
FormerGrant of patent is intended
Status updated on  24.04.2023
FormerRequest for examination was made
Status updated on  06.03.2020
FormerThe international publication has been made
Status updated on  08.12.2018
Formerunknown
Status updated on  09.07.2018
Most recent event   Tooltip15.08.2024No opposition filed within time limitpublished on 18.09.2024  [2024/38]
Applicant(s)For all designated states
Clarios Advanced Solutions GmbH
Am Leineufer 51
30419 Hannover / DE
[2020/15]
Inventor(s)01 / BIRKHOLZ, Joerg
Hopfenberg 12
31157 Sarstedt / DE
02 / JANSEN, Marco
Düpmoor 37
29229 Celle / DE
03 / EISERMANN, Henning
Grafhornstr. 30
31311 Uetze / DE
04 / JOSWIG, Ralf
Ahornring 22
29690 Buchholz / DE
05 / SCHWARZIEN, Benjamin
Pagenburgweg 7
30989 Gehrden / DE
06 / WIEGMANN, Martin
Bockhoper Straße 25
27246 Borstel / DE
 [2023/41]
Former [2020/15]01 / BIRKHOLZ, Joerg
Hopfenberg 12
31157 Sarstedt / DE
02 / JANSEN, Marco
Düpmoor 37
29229 Celle / DE
03 / EISERMANN, Henning
Grafhornstr. 30
31311 Uetze / DE
04 / JOSWIG, Ralf
Ahornring 22
29690 Buchholz / DE
05 / SCHWARZIEN, Benjamin
Pagenburgweg 7
30989 Gehrden / DE
06 / WIEGMANN, Martin
Bockhoper Stra e 25
27246 Borstel / DE
Representative(s)Meissner Bolte Partnerschaft mbB
Patentanwälte Rechtsanwälte
Postfach 10 26 05
86016 Augsburg / DE
[2023/41]
Former [2020/15]Trinks, Ole
Meissner Bolte Patentanwälte
Rechtsanwälte Partnerschaft mbB
Postfach 10 26 05
86016 Augsburg / DE
Application number, filing date18734079.901.06.2018
[2020/15]
WO2018EP64509
Priority number, dateUS201762513597P01.06.2017         Original published format: US 201762513597 P
[2020/15]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report
No.:WO2018220197
Date:06.12.2018
Language:DE
[2018/49]
Type: A2 Application without search report 
No.:EP3631877
Date:08.04.2020
Language:DE
The application published by WIPO in one of the EPO official languages on 06.12.2018 takes the place of the publication of the European patent application.
[2020/15]
Type: B1 Patent specification 
No.:EP3631877
Date:11.10.2023
Language:DE
[2023/41]
Search report(s)International search report - published on:EP11.04.2019
ClassificationIPC:H01M50/211, H01M50/227, H01M50/271, H01M50/284, H01M50/291, H01M50/507, H01M50/516, H01M50/522, H01M50/262
[2023/19]
CPC:
H01M50/522 (EP,US); H01M50/553 (US); H01M10/486 (US);
H01M50/211 (EP,US); H01M50/227 (EP,US); H01M50/249 (US);
H01M50/262 (EP,US); H01M50/271 (EP,US); H01M50/284 (EP,US);
H01M50/291 (EP,US); H01M50/507 (EP,US); H01M50/516 (EP,US);
H01M50/566 (US); H01M2220/20 (US); Y02E60/10 (EP) (-)
Former IPC [2020/15]H01M2/10, H01M2/20
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/15]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:ENERGIESPEICHERMODUL UND VERFAHREN ZUM ZUSAMMENBAU DAVON[2023/19]
English:ENERGY STORAGE MODULE AND METHOD FOR THE ASSEMBLY THEREOF[2023/19]
French:MODULE D'ACCUMULATION D'ÉNERGIE ET PROCÉDÉ POUR L'ASSEMBLAGE DE CEUX-CI[2023/19]
Former [2020/15]ELEKTROCHEMISCHE ZELLBAUGRUPPE, ENERGIESPEICHERMODUL UND VERFAHREN ZUM ZUSAMMENBAU DAVON
Former [2020/15]ELECTROCHEMICAL CELL UNIT, ENERGY STORAGE MODULE AND METHOD FOR THE ASSEMBLY THEREOF
Former [2020/15]ENSEMBLE DE CELLULES ÉLECTROCHIMIQUES, MODULE D'ACCUMULATION D'ÉNERGIE ET PROCÉDÉ POUR L'ASSEMBLAGE DE CEUX-CI
Entry into regional phase27.12.2019National basic fee paid 
27.12.2019Designation fee(s) paid 
27.12.2019Examination fee paid 
Examination procedure27.12.2019Examination requested  [2020/15]
27.12.2019Date on which the examining division has become responsible
23.07.2020Amendment by applicant (claims and/or description)
25.04.2023Communication of intention to grant the patent
04.09.2023Fee for grant paid
04.09.2023Fee for publishing/printing paid
04.09.2023Receipt of the translation of the claim(s)
Opposition(s)12.07.2024No opposition filed within time limit [2024/38]
Fees paidRenewal fee
29.06.2020Renewal fee patent year 03
28.06.2021Renewal fee patent year 04
27.06.2022Renewal fee patent year 05
27.06.2023Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ11.10.2023
DK11.10.2023
EE11.10.2023
ES11.10.2023
HR11.10.2023
IT11.10.2023
LT11.10.2023
LV11.10.2023
NL11.10.2023
PL11.10.2023
RO11.10.2023
RS11.10.2023
SE11.10.2023
SK11.10.2023
SM11.10.2023
BG11.01.2024
NO11.01.2024
GR12.01.2024
IS11.02.2024
PT12.02.2024
[2024/36]
Former [2024/35]CZ11.10.2023
DK11.10.2023
EE11.10.2023
ES11.10.2023
HR11.10.2023
LT11.10.2023
LV11.10.2023
NL11.10.2023
PL11.10.2023
RO11.10.2023
RS11.10.2023
SE11.10.2023
SM11.10.2023
BG11.01.2024
NO11.01.2024
GR12.01.2024
IS11.02.2024
PT12.02.2024
Former [2024/34]DK11.10.2023
EE11.10.2023
ES11.10.2023
HR11.10.2023
LT11.10.2023
LV11.10.2023
NL11.10.2023
PL11.10.2023
RS11.10.2023
SE11.10.2023
SM11.10.2023
BG11.01.2024
NO11.01.2024
GR12.01.2024
IS11.02.2024
PT12.02.2024
Former [2024/33]DK11.10.2023
ES11.10.2023
HR11.10.2023
LT11.10.2023
LV11.10.2023
NL11.10.2023
PL11.10.2023
RS11.10.2023
SE11.10.2023
SM11.10.2023
BG11.01.2024
NO11.01.2024
GR12.01.2024
IS11.02.2024
PT12.02.2024
Former [2024/26]ES11.10.2023
HR11.10.2023
LT11.10.2023
LV11.10.2023
NL11.10.2023
PL11.10.2023
RS11.10.2023
SE11.10.2023
BG11.01.2024
NO11.01.2024
GR12.01.2024
IS11.02.2024
PT12.02.2024
Former [2024/25]ES11.10.2023
HR11.10.2023
LT11.10.2023
NL11.10.2023
PL11.10.2023
RS11.10.2023
SE11.10.2023
BG11.01.2024
NO11.01.2024
GR12.01.2024
IS11.02.2024
PT12.02.2024
Former [2024/24]ES11.10.2023
HR11.10.2023
LT11.10.2023
NL11.10.2023
RS11.10.2023
SE11.10.2023
BG11.01.2024
NO11.01.2024
GR12.01.2024
IS11.02.2024
PT12.02.2024
Former [2024/21]LT11.10.2023
NL11.10.2023
BG11.01.2024
GR12.01.2024
IS11.02.2024
Former [2024/20]NL11.10.2023
GR12.01.2024
IS11.02.2024
Former [2024/17]NL11.10.2023
Cited inInternational search[XI]WO2009057894  (SK ENERGY CO LTD [KR], et al) [X] 1,3,4,7 * page 32, line 20 - page 36, line 13; figures 3,8,9,17,20 * [I] 5,6;
 [Y]KR20110093163  (LG CHEMICAL LTD [KR]) [Y] 20-28* paragraphs [0052] , [0053]; figures 7-9 *;
 [XY]WO2015016974  (JOHNSON CONTROLS TECH CO [US]) [X] 19 * paragraphs [0138] , [0160]; figure 7 * [Y] 9-18,20-28;
 [Y]WO2015035023  (JOHNSON CONTROLS TECH CO [US]) [Y] 9-18 * paragraphs [0107] - [0112]; figure 16 *;
 [Y]CN204747845U  (HEFEI GUOXUAN HIGH TECH POWER ENERGY CO LTD) [Y] 20-28 * the whole document *;
 [Y]US9225035  (WERRE JUSTIN [US], et al) [Y] 9-18 * figures 1,14 *;
 [XAYI]EP3002804  (LG CHEMICAL LTD [KR]) [X] 1-4,8,19 * paragraphs [0026] , [0027] , [0029] , [0030] , [0033]; figures 2,3,4,6,7,13 * [A] 7 [Y] 9-14 [I] 5,6
ExaminationWO2010031857
 WO2018065580
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.