blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3639599

EP3639599 - SYSTEMS AND METHODS FOR AN ENHANCED SCHEDULING REQUEST FOR 5G NR [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  10.12.2021
Database last updated on 30.09.2024
FormerExamination is in progress
Status updated on  05.08.2021
FormerRequest for examination was made
Status updated on  20.03.2020
FormerThe international publication has been made
Status updated on  22.12.2018
Formerunknown
Status updated on  16.07.2018
Most recent event   Tooltip10.12.2021Withdrawal of applicationpublished on 12.01.2022  [2022/02]
Applicant(s)For all designated states
Sharp Kabushiki Kaisha
1 Takumi-cho
Sakai-ku
Sakai City, Osaka 590-8522 / JP
For all designated states
FG INNOVATION COMPANY LIMITED
Flat 2623, 26/F Tuen Mun Central Square
22 Hoi Wing Road, Tuen Mun
New Territories, Hong Kong SAR / HK
[N/P]
Former [2020/17]For all designated states
Sharp Kabushiki Kaisha
1 Takumi-cho
Sakai-ku
Sakai City, Osaka 590-8522 / JP
For all designated states
FG INNOVATION COMPANY LIMITED
Flat 2623, 26/F Tuen Mun Central Square
22 Hoi Wing Road, Tuen Mun
New Territories, HK / CN
Inventor(s)01 / SHAHEEN, Kamel, M.
c/o Sharp Laboratories of America, Inc.
17200 SE Mill Plain Boulevard
Suite 200
Vancouver, WA 98683 / US
02 / AIBA, Tatsushi
c/o Sharp Kabushiki Kaisha
1, Takumi-cho
Sakai-ku
Sakai City, Osaka 590-8522 / JP
 [2020/17]
Representative(s)Müller-Boré & Partner Patentanwälte PartG mbB
Friedenheimer Brücke 21
80639 München / DE
[2020/17]
Application number, filing date18737113.313.06.2018
[2020/17]
WO2018US37404
Priority number, dateUS201762520515P15.06.2017         Original published format: US 201762520515 P
[2020/17]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018232034
Date:20.12.2018
Language:EN
[2018/51]
Type: A1 Application with search report 
No.:EP3639599
Date:22.04.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 20.12.2018 takes the place of the publication of the European patent application.
[2020/17]
Search report(s)International search report - published on:EP20.12.2018
ClassificationIPC:H04W72/12
[2020/17]
CPC:
H04W72/23 (EP); H04W72/21 (EP); H04W72/569 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/17]
TitleGerman:SYSTEME UND VERFAHREN FÜR VERBESSERTE PLANUNGSANFRAGE FÜR 5G NR[2020/17]
English:SYSTEMS AND METHODS FOR AN ENHANCED SCHEDULING REQUEST FOR 5G NR[2020/17]
French:SYSTÈMES ET PROCÉDÉS POUR UNE DEMANDE DE PLANIFICATION AMÉLIORÉE POUR NR 5G[2020/17]
Entry into regional phase19.12.2019National basic fee paid 
19.12.2019Designation fee(s) paid 
19.12.2019Examination fee paid 
Examination procedure19.12.2019Examination requested  [2020/17]
19.12.2019Date on which the examining division has become responsible
05.06.2020Amendment by applicant (claims and/or description)
04.08.2021Despatch of a communication from the examining division (Time limit: M04)
07.12.2021Application withdrawn by applicant  [2022/02]
Fees paidRenewal fee
24.06.2020Renewal fee patent year 03
22.06.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]EP2675081  (HUAWEI TECH CO LTD [CN]) [X] 1-4 * paragraphs [0014] - [0022] - [0 57] - [0062] * * figures 2, 3 *;
 [X]  - HUAWEI ET AL, "SR triggering and cancellation", vol. RAN WG2, no. Hangzhou, China; 20170515 - 20170519, (20170514), 3GPP DRAFT; R2-1705198 SR TRIGGERING AND CANCELLATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170514), XP051275674 [X] 1-4 * chapters 2.1 and 3 *
 [A]  - SAMSUNG ELECTRONICS R&D INSTITUTE UK, "General considerations on numerology-specific Scheduling Request design options in NR", vol. RAN WG2, no. Hangzhou, China; 20170515 - 20170519, (20170514), 3GPP DRAFT; R2-1704572 GENERAL CONSIDERATIONS ON NUMEROLOGY-SPECIFIC SCHEDULING REQUEST DESIGN OPTIONS IN NR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIO, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170514), XP051275127 [A] 1-4 * chapter 3 *
 [A]  - INTERDIGITAL COMMUNICATIONS, "Logical Channel Prioritization for NR", vol. RAN WG2, no. Spokane, USA; 20170403 - 20170407, (20170403), 3GPP DRAFT; R2-1702871 (R15 NR WI AI10315 MAC LCP MULTIPLEXING), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170403), XP051244851 [A] 1-4 * chapter 2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.