EP3669211 - RESERVOIR MATERIALITY BOUNDS FROM SEISMIC INVERSION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.02.2023 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 18.03.2022 | ||
Former | Grant of patent is intended Status updated on 02.12.2021 | ||
Former | Request for examination was made Status updated on 05.11.2021 | ||
Former | Grant of patent is intended Status updated on 04.07.2021 | ||
Former | Request for examination was made Status updated on 22.05.2020 | ||
Former | The international publication has been made Status updated on 22.02.2019 | ||
Former | unknown Status updated on 14.08.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states ExxonMobil Technology and Engineering Company 22777 Springwoods Village Parkway Spring, TX 77389 / US | [2023/05] |
Former [2021/01] | For all designated states ExxonMobil Upstream Research Company 22777 Springwoods Village Parkway Spring, TX 77389 / US | ||
Former [2020/26] | For all designated states ExxonMobil Upstream Research Company (EMHC-N1-4A.608) 22777 Springwoods Village Parkway Spring, TX 77389 / US | Inventor(s) | 01 /
WHEELOCK, Brent 9 Prospect Street 203 Morristown, NJ 07960 / US | 02 /
SCHMEDES, Jan 6914 Ferris Street Bellaire, TX 77401 / US | 03 /
SAIN, Ratnanabha 129 Watercress Circle Houston, TX 77064 / US | [2020/26] | Representative(s) | ExxonMobil Chemical Europe LLC IP Law Europe Hermeslaan 2 1831 Machelen / BE | [N/P] |
Former [2020/26] | ExxonMobil Chemical Europe Inc. IP Law Europe Hermeslaan 2 1831 Machelen / BE | Application number, filing date | 18749695.5 | 16.07.2018 | [2020/26] | WO2018US42286 | Priority number, date | US201762545748P | 15.08.2017 Original published format: US 201762545748 P | [2020/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019036135 | Date: | 21.02.2019 | Language: | EN | [2019/08] | Type: | A1 Application with search report | No.: | EP3669211 | Date: | 24.06.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.02.2019 takes the place of the publication of the European patent application. | [2020/26] | Type: | B1 Patent specification | No.: | EP3669211 | Date: | 20.04.2022 | Language: | EN | [2022/16] | Search report(s) | International search report - published on: | EP | 21.02.2019 | Classification | IPC: | G01V1/30, G01V99/00 | [2020/26] | CPC: |
G01V1/306 (EP,US);
G01V20/00 (EP,US);
G01V2210/6244 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | RESERVOIRMATERIALITÄTSGRENZEN AUS SEISMISCHER INVERSION | [2020/26] | English: | RESERVOIR MATERIALITY BOUNDS FROM SEISMIC INVERSION | [2020/26] | French: | LIMITES DE MATÉRIALITÉ DE RÉSERVOIR À PARTIR D'UNE INVERSION SISMIQUE | [2020/26] | Entry into regional phase | 12.02.2020 | National basic fee paid | 12.02.2020 | Designation fee(s) paid | 12.02.2020 | Examination fee paid | Examination procedure | 13.06.2019 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 12.02.2020 | Examination requested [2020/26] | 12.02.2020 | Date on which the examining division has become responsible | 30.11.2020 | Amendment by applicant (claims and/or description) | 05.07.2021 | Communication of intention to grant the patent | 04.11.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 03.12.2021 | Communication of intention to grant the patent | 11.03.2022 | Fee for grant paid | 11.03.2022 | Fee for publishing/printing paid | 11.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 23.01.2023 | No opposition filed within time limit [2023/13] | Fees paid | Renewal fee | 10.07.2020 | Renewal fee patent year 03 | 12.07.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.07.2018 | AL | 20.04.2022 | AT | 20.04.2022 | CY | 20.04.2022 | CZ | 20.04.2022 | DK | 20.04.2022 | EE | 20.04.2022 | ES | 20.04.2022 | FI | 20.04.2022 | HR | 20.04.2022 | IT | 20.04.2022 | LT | 20.04.2022 | LV | 20.04.2022 | MC | 20.04.2022 | MK | 20.04.2022 | NL | 20.04.2022 | PL | 20.04.2022 | RO | 20.04.2022 | RS | 20.04.2022 | SE | 20.04.2022 | SI | 20.04.2022 | SK | 20.04.2022 | SM | 20.04.2022 | TR | 20.04.2022 | IE | 16.07.2022 | LU | 16.07.2022 | BG | 20.07.2022 | GR | 21.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | IS | 20.08.2022 | PT | 22.08.2022 | [2024/29] |
Former [2024/24] | HU | 16.07.2018 | |
AL | 20.04.2022 | ||
AT | 20.04.2022 | ||
CY | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
IT | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
MK | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
IE | 16.07.2022 | ||
LU | 16.07.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2024/23] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CY | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
IT | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
MK | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
IE | 16.07.2022 | ||
LU | 16.07.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2024/20] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CY | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
IT | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
IE | 16.07.2022 | ||
LU | 16.07.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2024/11] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
IT | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
IE | 16.07.2022 | ||
LU | 16.07.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/33] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
IE | 16.07.2022 | ||
LU | 16.07.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/25] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
LU | 16.07.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/21] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
LU | 16.07.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/17] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/11] | AT | 20.04.2022 | |
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/09] | AT | 20.04.2022 | |
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/07] | AT | 20.04.2022 | |
DK | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2022/51] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2022/50] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
PT | 22.08.2022 | ||
Former [2022/49] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
GR | 21.07.2022 | ||
PT | 22.08.2022 | ||
Former [2022/47] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
LT | 20.04.2022 | ||
NL | 20.04.2022 | ||
SE | 20.04.2022 | ||
PT | 22.08.2022 | ||
Former [2022/44] | NL | 20.04.2022 | Cited in | International search | [A]WO2007008382 (EXXONMOBIL UPSTREAM RES CO [US], et al) [A] 1-15* the whole document *; | [Y]US8095345 (HOVERSTEN GARY MICHAEL [US]) [Y] 1,6,13 * col. 1, l. 13-15 ; col. 7, l. 35-38 ; col. 8, l. 53-56;; figure 1; claim 1 *; | [XYI]EP3121622 (BERGEN TEKNOLOGIOVERFØRING AS [NO]) [X] 1-3,5,7,9 * paragraphs [0035] , [0 13] , [0 37] , [0 38] , [0 43] , [0 44] , [0 21] , [0 45] , [00 9]; figures 1, 3; claim 1 * [Y] 10-12 [I] 5,8,14,15; | [Y] - EIDSVIK J ET AL, "Stochastic reservoir characterization using prestack seismic data", GEOPHYSICS, SOCIETY OF EXPLORATION GEOPHYSICISTS, US, (20040701), vol. 69, no. 4, doi:10.1190/1.1778241, ISSN 0016-8033, pages 978 - 993, XP002313759 [Y] 1,6,13 * page 981 - page 982 * DOI: http://dx.doi.org/10.1190/1.1778241 | [Y] - Brian Russell, "Stochastic vs Deterministic Pre-stack Inversion Methods", (20161201), URL: https://www.cgg.com/data/1/rec_docs/3414_3412_Stochastic_vs_Deterministic_Inversion_Russell.pdf, (20181018), XP055517018 [Y] 10-12 * slide 30 * | [A] - REBECCA SALTZER ET AL, "Exploiting the non-uniqueness of seismic inversion to obtain alternate scenarios of economic interest", SEG TECHNICAL PROGRAM EXPANDED ABSTRACTS 2006, (20060101), doi:10.1190/1.2369842, pages 1670 - 1673, XP055516489 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1190/1.2369842 | by applicant | - NEWMAN; ALUMBAUGH, Geophys. J. Intl., (20000000), vol. 140, pages 410 - 424 | - D. AVDEEV, Surveys in Geophysics, Springer, (20050000), vol. 26, pages 767 - 799 | - HU et al., Geophysical Prospecting, EAGE, (20110000), vol. 59, pages 477 - 491 | - EGBERT, Geophys. J. Intl., (20120000), vol. 189, pages 251 - 267 | - XU, S.; WHITE, R. E., "A new velocity model for clay-sand mixtures", Geophysical Prospecting, (19950000), vol. 43, pages 91 - 118, XP008039128 | - BULAND, ARILD; HENNING OMRE, "Bayesian linearized AVO inversion", Geophysics, (20030000), vol. 68, no. 1, pages 185 - 198, XP002558887 | - CONSTABLE, STEVEN C.; ROBERT L. PARKER; CATHERINE G. CONSTABLE, "Occam's inversion: A practical algorithm for generating smooth models from electromagnetic sounding data", Geophysics, (19870000), vol. 52, no. 3, doi:doi:10.1190/1.1442303, pages 289 - 300, XP055310564 DOI: http://dx.doi.org/10.1190/1.1442303 | - EIDSVIK, JO et al., "Stochastic reservoir characterization using prestack seismic data", Geophysics, (20040000), vol. 69, no. 4, doi:doi:10.1190/1.1778241, pages 978 - 993, XP002313759 DOI: http://dx.doi.org/10.1190/1.1778241 | - GOUVEIA, WENCES P.; JOHN A. SCALES, "Bayesian seismic waveform inversion: Parameter estimation and uncertainty analysis", Journal of Geophysical Research: Solid Earth, (19980000), vol. 103.B2, pages 2759 - 2779 | - RIMSTAD, KJARTAN; HENNING OMRE, "Impact of rock-physics depth trends and Markov random fields on hierarchical Bayesian lithology/fluid prediction", Geophysics, (20100000), vol. 75, no. 4, doi:doi:10.1190/1.3463475, pages R93 - R108, XP001557683 DOI: http://dx.doi.org/10.1190/1.3463475 | - SALTZER, REBECCA; CHRIS FINN, "Exploiting the non-uniqueness of seismic inversion to obtain alternate scenarios of economic interest", SEG Technical Program Expanded Abstracts, (20060000), pages 1670 - 1673 | - STARK, PHILIP B.; ROBERT L. PARKER, "Bounded-variable least-squares: an algorithm and applications", Computational Statistics, (19950000), vol. 10, pages 129 - 129 |