EP3682302 - METHOD FOR STARTING UP A CONTROLLER SYSTEM AND CONTROLLER SYSTEM [Right-click to bookmark this link] | |||
Former [2020/30] | METHOD FOR STARTING UP A CONTROLLER SYSTEM, AND CONTROLLER SYSTEM | ||
[2021/34] | Status | No opposition filed within time limit Status updated on 25.11.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 17.12.2021 | ||
Former | Grant of patent is intended Status updated on 03.08.2021 | ||
Former | Examination is in progress Status updated on 05.03.2021 | ||
Former | Request for examination was made Status updated on 19.06.2020 | ||
Former | The international publication has been made Status updated on 02.03.2019 | ||
Former | unknown Status updated on 17.08.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Lenze Automation GmbH Hans-Lenze-Strasse 1 31855 Aerzen / DE | [2020/30] | Inventor(s) | 01 /
HESSE, Peter Köhlerweg 6 31789 Hameln / DE | 02 /
DÜSTERBERG, Dirk Jahnstrasse 9 31860 Emmerthal / DE | 03 /
GENTZEN, Thomas Im Mohngarten 2 38162 Cremlingen / DE | [2020/30] | Representative(s) | Patentanwälte Ruff, Wilhelm, Beier, Dauster & Partner mbB Kronenstraße 30 70174 Stuttgart / DE | [2020/30] | Application number, filing date | 18750167.1 | 02.08.2018 | [2020/30] | WO2018EP71000 | Priority number, date | DE201710214892 | 25.08.2017 Original published format: DE102017214892 | [2020/30] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2019038046 | Date: | 28.02.2019 | Language: | DE | [2019/09] | Type: | A1 Application with search report | No.: | EP3682302 | Date: | 22.07.2020 | Language: | DE | The application published by WIPO in one of the EPO official languages on 28.02.2019 takes the place of the publication of the European patent application. | [2020/30] | Type: | B1 Patent specification | No.: | EP3682302 | Date: | 19.01.2022 | Language: | DE | [2022/03] | Search report(s) | International search report - published on: | EP | 28.02.2019 | Classification | IPC: | G05B19/042 | [2020/30] | CPC: |
G05B19/0426 (EP,US);
G05B2219/23427 (EP,US);
G05B2219/23429 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/30] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR INBETRIEBNAHME EINES STEUERGERÄTESYSTEMS UND STEUERGERÄTESYSTEM | [2020/30] | English: | METHOD FOR STARTING UP A CONTROLLER SYSTEM AND CONTROLLER SYSTEM | [2021/34] | French: | PROCÉDÉ DE MISE EN SERVICE D'UN SYSTÈME DE COMMANDE ET SYSTÈME DE COMMANDE | [2021/34] |
Former [2020/30] | METHOD FOR STARTING UP A CONTROLLER SYSTEM, AND CONTROLLER SYSTEM | ||
Former [2020/30] | PROCÉDÉ DE MISE EN SERVICE D'UN SYSTÈME D'APPAREIL DE COMMANDE ET SYSTÈME D'APPAREIL DE COMMANDE | Entry into regional phase | 16.03.2020 | National basic fee paid | 16.03.2020 | Designation fee(s) paid | 16.03.2020 | Examination fee paid | Examination procedure | 16.03.2020 | Examination requested [2020/30] | 16.03.2020 | Date on which the examining division has become responsible | 17.12.2020 | Amendment by applicant (claims and/or description) | 09.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 09.07.2021 | Reply to a communication from the examining division | 04.08.2021 | Communication of intention to grant the patent | 13.12.2021 | Fee for grant paid | 13.12.2021 | Fee for publishing/printing paid | 13.12.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 20.10.2022 | No opposition filed within time limit [2022/52] | Fees paid | Renewal fee | 27.08.2020 | Renewal fee patent year 03 | 24.08.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.08.2018 | AL | 19.01.2022 | CY | 19.01.2022 | CZ | 19.01.2022 | DK | 19.01.2022 | EE | 19.01.2022 | ES | 19.01.2022 | FI | 19.01.2022 | HR | 19.01.2022 | IT | 19.01.2022 | LT | 19.01.2022 | LV | 19.01.2022 | MC | 19.01.2022 | MK | 19.01.2022 | MT | 19.01.2022 | NL | 19.01.2022 | PL | 19.01.2022 | RO | 19.01.2022 | RS | 19.01.2022 | SE | 19.01.2022 | SI | 19.01.2022 | SK | 19.01.2022 | SM | 19.01.2022 | BG | 19.04.2022 | NO | 19.04.2022 | GR | 20.04.2022 | IS | 19.05.2022 | PT | 19.05.2022 | GB | 02.08.2022 | IE | 02.08.2022 | LU | 02.08.2022 | BE | 31.08.2022 | CH | 31.08.2022 | FR | 31.08.2022 | LI | 31.08.2022 | [2024/44] |
Former [2024/24] | HU | 02.08.2018 | |
AL | 19.01.2022 | ||
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
MK | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
GB | 02.08.2022 | ||
IE | 02.08.2022 | ||
LU | 02.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2024/23] | AL | 19.01.2022 | |
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
MK | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
GB | 02.08.2022 | ||
IE | 02.08.2022 | ||
LU | 02.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2024/20] | AL | 19.01.2022 | |
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
GB | 02.08.2022 | ||
IE | 02.08.2022 | ||
LU | 02.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/47] | AL | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
GB | 02.08.2022 | ||
IE | 02.08.2022 | ||
LU | 02.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/42] | AL | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
IE | 02.08.2022 | ||
LU | 02.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/35] | AL | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
IE | 02.08.2022 | ||
LU | 02.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/33] | AL | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
IE | 02.08.2022 | ||
LU | 02.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/21] | AL | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
LU | 02.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/16] | AL | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/10] | AL | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/01] | AL | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/49] | CZ | 19.01.2022 | |
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/48] | CZ | 19.01.2022 | |
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/47] | DK | 19.01.2022 | |
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/46] | DK | 19.01.2022 | |
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/42] | ES | 19.01.2022 | |
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/39] | ES | 19.01.2022 | |
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/36] | ES | 19.01.2022 | |
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/35] | ES | 19.01.2022 | |
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
NL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/34] | ES | 19.01.2022 | |
LT | 19.01.2022 | ||
NL | 19.01.2022 | ||
NO | 19.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/33] | LT | 19.01.2022 | |
NL | 19.01.2022 | ||
NO | 19.04.2022 | ||
Former [2022/31] | NL | 19.01.2022 | Cited in | International search | [XI]DE102011102770 (VOLKSWAGEN AG [DE]) [X] 1-3,6,8 * paragraph [0006] - paragraph [0017]; figure 1 *[I] 1-9; | [XI]EP2741451 (SICK AG [DE]) [X] 1-3,6,8 * the whole document * [I] 1-9; | [XI]DE202015102520U (ABB TECHNOLOGY OY [FI]) [X] 1-3,6,8 * paragraph [0002] - paragraph [0020] * [I] 1-9 | Examination | DE102007062395 |