EP3678838 - METHOD AND DEVICE FOR ADJUSTING A PREFORM CONVEYOR [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 17.12.2021 Database last updated on 26.07.2024 | |
Former | Grant of patent is intended Status updated on 21.09.2021 | ||
Former | Request for examination was made Status updated on 12.06.2020 | ||
Former | The international publication has been made Status updated on 16.03.2019 | ||
Former | unknown Status updated on 17.08.2018 | Most recent event Tooltip | 20.06.2024 | New entry: Payment of appeal fee following opposition | 20.06.2024 | Change: Appeal number | 20.06.2024 | Deletion: Appeal number | Applicant(s) | For all designated states Sidel Participations Avenue de la Patrouille de France 76930 Octeville-sur-Mer / FR | [2020/29] | Inventor(s) | 01 /
SALOMON, Gautier c/o SIDEL PARTICIPATIONS Avenue de la Patrouille de France 76930 Octeville-sur-Mer / FR | [2022/03] |
Former [2020/29] | 01 /
SALOMON, Gautier c/o SIDEL PARTICIPATIONS Avenue de la Patrouille de France 76930 Octeville sur Mer / FR | Representative(s) | Sidel Group c/o Sidel Participations Avenue de la Patrouille de France 76930 Octeville-sur-mer / FR | [2020/29] | Application number, filing date | 18750224.0 | 10.08.2018 | [2020/29] | WO2018EP71785 | Priority number, date | FR20170058205 | 06.09.2017 Original published format: FR 1758205 | [2020/29] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2019048182 | Date: | 14.03.2019 | Language: | FR | [2019/11] | Type: | A1 Application with search report | No.: | EP3678838 | Date: | 15.07.2020 | Language: | FR | The application published by WIPO in one of the EPO official languages on 14.03.2019 takes the place of the publication of the European patent application. | [2020/29] | Type: | B1 Patent specification | No.: | EP3678838 | Date: | 19.01.2022 | Language: | FR | [2022/03] | Search report(s) | International search report - published on: | EP | 14.03.2019 | Classification | IPC: | B29C49/42, B29C49/06, B65G47/22, B65G51/03, B65G21/20 | [2020/29] | CPC: |
B29C49/4205 (EP,US);
B65G21/2072 (EP,US);
B29C49/06 (EP);
B65G43/00 (US);
B65G51/035 (EP,US);
B29C2049/023 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/29] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUM EINSTELLEN EINES VORFORMFÖRDERERS | [2020/29] | English: | METHOD AND DEVICE FOR ADJUSTING A PREFORM CONVEYOR | [2020/29] | French: | PROCEDE ET DISPOSITIF DE REGLAGE D'UN CONVOYEUR DE PREFORMES | [2020/29] | Entry into regional phase | 18.02.2020 | National basic fee paid | 18.02.2020 | Designation fee(s) paid | 18.02.2020 | Examination fee paid | Examination procedure | 18.02.2020 | Examination requested [2020/29] | 18.02.2020 | Date on which the examining division has become responsible | 17.11.2020 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 19.01.2021 | Amendment by applicant (claims and/or description) | 22.09.2021 | Communication of intention to grant the patent | 13.12.2021 | Fee for grant paid | 13.12.2021 | Fee for publishing/printing paid | 13.12.2021 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
18.10.2022
19.10.2022
ADMISSIBLE Krones AG Böhmerwaldstraße 5 93073 Neutraubling / DE Opponent's representative Bittner, Bernhard Hannke Bittner & Partner Patent- und Rechtsanwälte mbB Prüfeninger Strasse 1 93049 Regensburg / DE | [2022/47] | deleted | Deletion: Legal effect of rejection of opposition [ N /P ] | 03.11.2022 | Invitation to proprietor to file observations on the notice of opposition | 03.03.2023 | Reply of patent proprietor to notice(s) of opposition | 31.01.2024 | Date of oral proceedings | 24.04.2024 | Despatch of minutes of oral proceedings | 24.04.2024 | Date of despatch of rejection of opposition | Appeal following opposition | 17.06.2024 | Appeal received No. T0843/24 | 17.06.2024 | Payment of appeal fee | Request for further processing for: | 19.01.2021 | Request for further processing filed | 19.01.2021 | Full payment received (date of receipt of payment) Request granted | 28.01.2021 | Decision despatched | Fees paid | Renewal fee | 19.08.2020 | Renewal fee patent year 03 | 18.08.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.08.2018 | AL | 19.01.2022 | AT | 19.01.2022 | CY | 19.01.2022 | CZ | 19.01.2022 | DK | 19.01.2022 | EE | 19.01.2022 | ES | 19.01.2022 | FI | 19.01.2022 | HR | 19.01.2022 | LT | 19.01.2022 | LV | 19.01.2022 | MC | 19.01.2022 | MK | 19.01.2022 | NL | 19.01.2022 | PL | 19.01.2022 | RO | 19.01.2022 | RS | 19.01.2022 | SE | 19.01.2022 | SI | 19.01.2022 | SK | 19.01.2022 | SM | 19.01.2022 | BG | 19.04.2022 | NO | 19.04.2022 | GR | 20.04.2022 | IS | 19.05.2022 | PT | 19.05.2022 | GB | 10.08.2022 | IE | 10.08.2022 | LU | 10.08.2022 | BE | 31.08.2022 | CH | 31.08.2022 | LI | 31.08.2022 | [2024/27] |
Former [2024/24] | HU | 10.08.2018 | |
AL | 19.01.2022 | ||
AT | 19.01.2022 | ||
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
GB | 10.08.2022 | ||
IE | 10.08.2022 | ||
LU | 10.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2024/20] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
GB | 10.08.2022 | ||
IE | 10.08.2022 | ||
LU | 10.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/47] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
GB | 10.08.2022 | ||
IE | 10.08.2022 | ||
LU | 10.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/42] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
IE | 10.08.2022 | ||
LU | 10.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/33] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
IE | 10.08.2022 | ||
LU | 10.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/21] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
LU | 10.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/16] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MC | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/10] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/01] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/49] | AT | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/48] | AT | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/47] | AT | 19.01.2022 | |
DK | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/46] | AT | 19.01.2022 | |
DK | 19.01.2022 | ||
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/42] | AT | 19.01.2022 | |
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/39] | AT | 19.01.2022 | |
ES | 19.01.2022 | ||
FI | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/36] | AT | 19.01.2022 | |
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/35] | ES | 19.01.2022 | |
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
NL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/34] | ES | 19.01.2022 | |
LT | 19.01.2022 | ||
NL | 19.01.2022 | ||
NO | 19.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/33] | LT | 19.01.2022 | |
NL | 19.01.2022 | ||
NO | 19.04.2022 | ||
Former [2022/31] | NL | 19.01.2022 | Cited in | International search | [A]WO9936337 (SIPA SPA [IT], et al) [A] 1-6 * page 8, line 14 - page 9, line 4; claim 2 *; | [A]FR2806395 (NETRA SYSTEMS [FR]) [A] 1-6 * page 4, line 13 - page 5, line 13; figures 3,4; claim 1 *; | [A]EP1331182 (REXNORD MARBETT SPA [IT]) [A] 1-6* paragraphs [0063] - [0065]; claims 1-16 *; | [A]FR2882736 (SIDEL SAS [FR]) [A] 1-6 * page 10, line 25 - page 12, line 7; figure 4; claim 1 * | Opposition | WO9936337 | FR2806395 | EP1277677 | EP1331182 | EP1628894 | FR2882736 | DE102006060110 | DE102009016593 | EP2295226 | EP3093259 | DE102009015519 |