EP3649802 - TRANSFER OF MEASUREMENT CONFIGURATION INFORMATION IN WIRELESS COMMUNICATION NETWORKS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.07.2023 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 12.08.2022 | ||
Former | Grant of patent is intended Status updated on 20.06.2022 | ||
Former | Examination is in progress Status updated on 05.02.2021 | ||
Former | Request for examination was made Status updated on 10.04.2020 | ||
Former | The international publication has been made Status updated on 12.01.2019 | ||
Former | unknown Status updated on 20.08.2018 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2022/37] |
Former [2020/20] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
EKLÖF, Cecilia Skogsliden 21 187 41 Täby / SE | 02 /
HEIKKILÄ, Gunnar Gäddviksvägen 31 954 31 Gammelstad / SE | 03 /
KWONG, Waikwok Jungfrudansen 29 3 tr 171 51 Solna / SE | 04 /
SHI, Nianshan Mistelvägen 8 176 74 Järfälla / SE | [2020/20] | Representative(s) | Zacco Sweden AB P.O. Box 5581 Löjtnantsgatan 21 114 85 Stockholm / SE | [2022/37] |
Former [2020/20] | Laqua, Bernd Christian Kurt Wuesthoff & Wuesthoff Patentanwälte PartG mbB Schweigerstraße 2 81541 München / DE | Application number, filing date | 18752262.8 | 09.07.2018 | [2020/20] | WO2018IB55051 | Priority number, date | US201762529801P | 07.07.2017 Original published format: US 201762529801 P | [2020/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019008560 | Date: | 10.01.2019 | Language: | EN | [2019/02] | Type: | A1 Application with search report | No.: | EP3649802 | Date: | 13.05.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 10.01.2019 takes the place of the publication of the European patent application. | [2020/20] | Type: | B1 Patent specification | No.: | EP3649802 | Date: | 14.09.2022 | Language: | EN | [2022/37] | Search report(s) | International search report - published on: | EP | 10.01.2019 | Classification | IPC: | H04W24/10, H04W24/08 | [2020/20] | CPC: |
H04W24/10 (EP,US);
H04W24/08 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ÜBERTRAGUNG VON MESSKONFIGURATIONSDATEN IN DRAHTLOSEN KOMMUNIKATIONSNETZEN | [2020/20] | English: | TRANSFER OF MEASUREMENT CONFIGURATION INFORMATION IN WIRELESS COMMUNICATION NETWORKS | [2020/20] | French: | TRANSFERT D'INFORMATIONS DE CONFIGURATION DE MESURE DANS DES RÉSEAUX DE COMMUNICATION SANS FIL | [2020/20] | Entry into regional phase | 23.01.2020 | National basic fee paid | 23.01.2020 | Designation fee(s) paid | 23.01.2020 | Examination fee paid | Examination procedure | 07.05.2019 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 23.01.2020 | Examination requested [2020/20] | 23.01.2020 | Date on which the examining division has become responsible | 19.08.2020 | Amendment by applicant (claims and/or description) | 04.02.2021 | Despatch of a communication from the examining division (Time limit: M04) | 30.03.2021 | Reply to a communication from the examining division | 21.06.2022 | Communication of intention to grant the patent | 09.08.2022 | Fee for grant paid | 09.08.2022 | Fee for publishing/printing paid | 09.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 15.06.2023 | No opposition filed within time limit [2023/34] | Fees paid | Renewal fee | 27.07.2020 | Renewal fee patent year 03 | 27.07.2021 | Renewal fee patent year 04 | 27.07.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 14.09.2022 | AT | 14.09.2022 | CZ | 14.09.2022 | DK | 14.09.2022 | EE | 14.09.2022 | ES | 14.09.2022 | FI | 14.09.2022 | HR | 14.09.2022 | IT | 14.09.2022 | LT | 14.09.2022 | LV | 14.09.2022 | MC | 14.09.2022 | NL | 14.09.2022 | PL | 14.09.2022 | RO | 14.09.2022 | RS | 14.09.2022 | SE | 14.09.2022 | SI | 14.09.2022 | SK | 14.09.2022 | SM | 14.09.2022 | NO | 14.12.2022 | GR | 15.12.2022 | IS | 14.01.2023 | PT | 16.01.2023 | [2024/26] |
Former [2024/14] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/37] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/34] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/30] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/29] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/26] | AT | 14.09.2022 | |
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/23] | AT | 14.09.2022 | |
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
PT | 16.01.2023 | ||
Former [2023/22] | AT | 14.09.2022 | |
CZ | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
PT | 16.01.2023 | ||
Former [2023/20] | FI | 14.09.2022 | |
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
Former [2023/10] | FI | 14.09.2022 | |
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
Former [2023/09] | FI | 14.09.2022 | |
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | ||
Former [2023/08] | FI | 14.09.2022 | |
LT | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | Cited in | International search | [Y]EP2692167 (NEC CORP [JP]) [Y] 1-30 * paragraph [0017] - paragraph [0018] * * figures 3,4 *; | [Y] - HUAWEI, "Introduction of 8.4.1.53 Measurement Control and Report: Application Layer Data Measurement", vol. RAN WG5, no. Hangzhou, China ;20170515 - 20170519, (20170514), 3GPP DRAFT; R5-172467 R14QMC INTRODUCTION OF 8.4.1.53 MEASUREMENT CONTROL AND REPORT APPLICATION LAYER DATA MEASUREMENT, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUT, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN5/Docs/, (20170514), XP051278316 [Y] 1-30 * Paragraph "8.4.1.53 Measurement Control and Report: Application layer measurement configuration for 3GP-DASH streaming service" * | [A] - ERICSSON LM, "Correction for QoE Measurement Collection", vol. SA WG4, no. Busan, Republic of Korea; 20170424 - 20170428, (20170606), 3GPP DRAFT; 26247_CR0098R1_(REL-14)_S4-170454, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/SA/Docs/, (20170606), XP051283432 [A] 1-30 * Figure L-1: example signalling diagram * | Examination | EP2692167 |