EP3652283 - LUBRICATING OIL COMPOSITIONS CONTAINING ZIRCONIUM AND METHOD FOR PREVENTING OR REDUCING LOW SPEED PRE-IGNITION IN DIRECT INJECTED SPARK-IGNITED ENGINES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.05.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 27.05.2022 | ||
Former | Grant of patent is intended Status updated on 10.01.2022 | ||
Former | Examination is in progress Status updated on 11.12.2020 | ||
Former | Request for examination was made Status updated on 17.04.2020 | ||
Former | The international publication has been made Status updated on 18.01.2019 | ||
Former | unknown Status updated on 20.08.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Chevron Oronite Company LLC 6001 Bollinger Canyon Road San Ramon, CA 94583 / US | For all designated states Chevron Oronite Technology B.V. Petroleumweg 32 3196 KD Vondelingenplaat / NL | For all designated states Chevron U.S.A. Inc. 6001 Bollinger Canyon Road San Ramon, California 94583 / US | [2020/21] | Inventor(s) | 01 /
ELLIOTT, Ian G. 6001 Bollinger Canyon Road San Ramon, California 94583 / US | 02 /
HOGENDOORN, Richard Petroleumweg 32 Vondelingenplaat 3196 KD Rotterdam / NL | 03 /
GUNAWAN, Theresa Liang 6001 Bollinger Canyon Road San Ramon, California 94583 / US | 04 /
TSANG, Man Hon 6001 Bollinger Canyon Road San Ramon, California 94583 / US | 05 /
CHERPECK, Richard E. c/o Chevron Corporation, Law Department 6001 Bollinger Canyon Road San Ramon, California 94583 / US | 06 /
MARIA, Amir Gamal 6001 Bollinger Canyon Road San Ramon, California 94583 / US | 07 /
THOMAS, Andrew Michael 6001 Bollinger Canyon Road San Ramon, California 94583 / US | [2022/26] |
Former [2020/21] | 01 /
ELLIOTT, Ian G. 6001 Bollinger Canyon Road San Ramon, California 94583 / US | ||
02 /
HOGENDOORN, Richard Petroleumweg 32 Vondelingenplaat 3196 KD Rotterdam / NL | |||
03 /
GUNAWAN, Theresa Liang 6001 Bollinger Canyon Road San Ramon, California 94583 / US | |||
04 /
TSANG, Man Hon 6001 Bollinger Canyon Road San Ramon, California 94583 / US | |||
05 /
CHERPECK, Richard E. 6001 Bollinger Canyon Road San Ramon, California 94583 / US | |||
06 /
MARIA, Amir Gamal 6001 Bollinger Canyon Road San Ramon, California 94583 / US | |||
07 /
THOMAS, Andrew Michael 6001 Bollinger Canyon Road San Ramon, California 94583 / US | Representative(s) | Haseltine Lake Kempner LLP One Portwall Square Portwall Lane Bristol BS1 6BH / GB | [N/P] |
Former [2020/21] | Haseltine Lake Kempner LLP Redcliff Quay 120 Redcliff Street Bristol BS1 6HU / GB | Application number, filing date | 18752274.3 | 11.07.2018 | [2020/21] | WO2018IB55112 | Priority number, date | US201762532426P | 14.07.2017 Original published format: US 201762532426 P | [2020/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019012447 | Date: | 17.01.2019 | Language: | EN | [2019/03] | Type: | A1 Application with search report | No.: | EP3652283 | Date: | 20.05.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.01.2019 takes the place of the publication of the European patent application. | [2020/21] | Type: | B1 Patent specification | No.: | EP3652283 | Date: | 29.06.2022 | Language: | EN | [2022/26] | Search report(s) | International search report - published on: | EP | 17.01.2019 | Classification | IPC: | C10M139/00, C10M141/12 | [2020/21] | CPC: |
C10M139/00 (EP,US);
C10M159/18 (US);
C10M141/12 (EP,US);
C10M2207/027 (US);
C10M2207/12 (US);
C10M2207/144 (US);
C10M2215/064 (EP,US);
C10M2215/28 (EP,US);
C10M2219/044 (US);
C10M2227/065 (EP,US);
C10M2227/066 (EP,US);
C10M2227/09 (US);
C10N2010/02 (US);
C10N2010/04 (US);
C10N2010/08 (EP,US);
C10N2010/12 (US);
C10N2030/04 (US);
C10N2030/06 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SCHMIERSTOFFZUSAMMENSETZUNG ENTHALTEND ZIRKONIUM UND METHOD ZUR VERHINDERUNG ODER REDUZIERZUNG VON LOW-SPEED-PRE-IGNITION IN DIREKTEINSPRITZMOTOREN | [2022/04] | English: | LUBRICATING OIL COMPOSITIONS CONTAINING ZIRCONIUM AND METHOD FOR PREVENTING OR REDUCING LOW SPEED PRE-IGNITION IN DIRECT INJECTED SPARK-IGNITED ENGINES | [2020/21] | French: | COMPOSITION LUBRIFIANTE COMPRENANT ZIRCONIUM ET MÉTHODE À RÉDUIRE OU DIMINUER LOW-SPEED-PRE-IGNITION DES MOTEURS À INJECTION DIRECT | [2022/04] |
Former [2020/21] | ZIRKONIUMHALTIGE SCHMIERÖLZUSAMMENSETZUNGEN UND VERFAHREN ZUM VERHINDERN ODER REDUZIEREN DER VORZÜNDUNG BEI NIEDRIGER GESCHWINDIGKEIT IN DIREKTEINSPRITZENDEN FREMDGEZÜNDETEN MOTOREN | ||
Former [2020/21] | COMPOSITIONS D'HUILE LUBRIFIANTE CONTENANT DU ZIRCONIUM ET PROCÉDÉ POUR EMPÊCHER OU RÉDUIRE LE PRÉALLUMAGE À FAIBLE VITESSE DANS DES MOTEURS À ALLUMAGE PAR ÉTINCELLE À INJECTION DIRECTE | Entry into regional phase | 10.01.2020 | National basic fee paid | 10.01.2020 | Designation fee(s) paid | 10.01.2020 | Examination fee paid | Examination procedure | 10.01.2020 | Examination requested [2020/21] | 10.01.2020 | Date on which the examining division has become responsible | 30.06.2020 | Amendment by applicant (claims and/or description) | 11.12.2020 | Despatch of a communication from the examining division (Time limit: M04) | 16.04.2021 | Reply to a communication from the examining division | 11.01.2022 | Communication of intention to grant the patent | 17.05.2022 | Fee for grant paid | 17.05.2022 | Fee for publishing/printing paid | 17.05.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | EP22181366.0 / EP4134414 | Opposition(s) | 30.03.2023 | No opposition filed within time limit [2023/23] | Fees paid | Renewal fee | 14.07.2020 | Renewal fee patent year 03 | 15.07.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.07.2018 | AL | 29.06.2022 | AT | 29.06.2022 | CY | 29.06.2022 | CZ | 29.06.2022 | DK | 29.06.2022 | EE | 29.06.2022 | ES | 29.06.2022 | FI | 29.06.2022 | HR | 29.06.2022 | IT | 29.06.2022 | LT | 29.06.2022 | LV | 29.06.2022 | MC | 29.06.2022 | MK | 29.06.2022 | MT | 29.06.2022 | NL | 29.06.2022 | PL | 29.06.2022 | RO | 29.06.2022 | RS | 29.06.2022 | SE | 29.06.2022 | SI | 29.06.2022 | SK | 29.06.2022 | SM | 29.06.2022 | IE | 11.07.2022 | LU | 11.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | BG | 29.09.2022 | NO | 29.09.2022 | GR | 30.09.2022 | IS | 29.10.2022 | PT | 31.10.2022 | [2024/44] |
Former [2024/24] | HU | 11.07.2018 | |
AL | 29.06.2022 | ||
AT | 29.06.2022 | ||
CY | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
IT | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
MK | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 11.07.2022 | ||
LU | 11.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2024/23] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CY | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
IT | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
MK | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 11.07.2022 | ||
LU | 11.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2024/20] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CY | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
IT | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 11.07.2022 | ||
LU | 11.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2024/11] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
IT | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 11.07.2022 | ||
LU | 11.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/37] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 11.07.2022 | ||
LU | 11.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/33] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
IE | 11.07.2022 | ||
LU | 11.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/25] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
LU | 11.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/22] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
LU | 11.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/21] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
LU | 11.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/17] | AL | 29.06.2022 | |
AT | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/16] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/12] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/11] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
PT | 31.10.2022 | ||
Former [2023/09] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RO | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
SM | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
PT | 31.10.2022 | ||
Former [2023/08] | AT | 29.06.2022 | |
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2023/07] | AT | 29.06.2022 | |
FI | 29.06.2022 | ||
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2023/02] | FI | 29.06.2022 | |
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2022/50] | FI | 29.06.2022 | |
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
RS | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2022/49] | FI | 29.06.2022 | |
HR | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
NO | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2022/47] | FI | 29.06.2022 | |
LT | 29.06.2022 | ||
SE | 29.06.2022 | ||
NO | 29.09.2022 | Cited in | International search | [X]US2006205615 (ESCHE CARL K JR [US]) [X] 9-14 * paragraphs [0103] , [0110]; examples 5,13; claims 1,2,3,21,22,27,31; tables 1,3 *; | [XAI]EP2251401 (AFTON CHEMICAL CORP [US]) [X] 9,10,14 * claims 1, 2, 14; tables 3,4 * [A] 1-8 [I] 17; | [XAI]US2014011719 (HAQUE TABASSUMUL [US], et al) [X] 9,10,14 * paragraph [0057]; claims 11-14, 17 * [A] 1-8 [I] 17; | [A]US2017015929 (FLETCHER KRISTIN [US], et al) [A] 1-17* paragraph [0199] - paragraph [0207]; claims 15-20 * | by applicant | US3172892 | US3219666 | US3272746 | US4320019 | US6372696 | US7884058 | - AMANN et al., SAE, (20120000), vol. 01, page 1140 |