blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3837809

EP3837809 - MUTUAL 3GPP-TSN QOS ADAPTION AND SHAPING [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  21.10.2022
Database last updated on 28.09.2024
FormerRequest for examination was made
Status updated on  21.05.2021
FormerThe international publication has been made
Status updated on  24.02.2020
Formerunknown
Status updated on  03.09.2018
Most recent event   Tooltip26.07.2024New entry: Reply to examination report 
Applicant(s)For all designated states
Nokia Solutions and Networks Oy
Karakaari 7
02610 Espoo / FI
[2021/25]
Inventor(s)01 / MANNWEILER, Christian
Unterhachinger Str. 53
81737 Munich / DE
02 / GAJIC, Borislava
Bussardstrasse 38
82008 Unterhaching / DE
03 / ROST, Peter
Struvestr. 24
69124 Heidelberg / DE
04 / MARKWART, Christian
Metzstr. 14a
81667 Munich / DE
05 / SIVASIVA GANESAN, Rakash
Von-Stauffenberg-Strasse 20
82008 Unterhaching / DE
 [2021/25]
Representative(s)Nokia EPO representatives
Nokia Technologies Oy
Karakaari 7
02610 Espoo / FI
[2021/25]
Application number, filing date18758566.614.08.2018
[2021/25]
WO2018EP72046
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020035133
Date:20.02.2020
Language:EN
[2020/08]
Type: A1 Application with search report 
No.:EP3837809
Date:23.06.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 20.02.2020 takes the place of the publication of the European patent application.
[2021/25]
Search report(s)International search report - published on:EP20.02.2020
ClassificationIPC:H04L12/40, H04W28/02
[2021/25]
CPC:
H04L12/40 (EP); H04W28/0268 (EP,US); H04L12/413 (EP);
H04L12/4625 (EP); H04L12/4633 (EP,US); H04L45/02 (EP,US);
H04L47/2491 (US); H04W28/0958 (EP,US); H04W40/246 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/25]
TitleGerman:ANPASSUNG UND FORMUNG VON GEGENSEITIGER 3GPP-TSN-DIENSTGÜTE[2021/25]
English:MUTUAL 3GPP-TSN QOS ADAPTION AND SHAPING[2021/25]
French:ADAPTATION ET MISE EN FORME DE QUALITÉ DE SERVICE (QOS) DE PROJET DE PARTENARIAT DE TROISIÈME GÉNÉRATION (3GPP)-RÉSEAUTAGE SENSIBLE AU TEMPS (TSN) (3GPP-TSN) MUTUELLE[2021/25]
Entry into regional phase15.03.2021National basic fee paid 
15.03.2021Designation fee(s) paid 
15.03.2021Examination fee paid 
Examination procedure15.03.2021Examination requested  [2021/25]
15.03.2021Date on which the examining division has become responsible
09.09.2021Amendment by applicant (claims and/or description)
20.10.2022Despatch of a communication from the examining division (Time limit: M04)
14.02.2023Reply to a communication from the examining division
24.01.2024Despatch of a communication from the examining division (Time limit: M06)
24.07.2024Reply to a communication from the examining division
Fees paidRenewal fee
15.03.2021Renewal fee patent year 03
13.08.2021Renewal fee patent year 04
19.07.2022Renewal fee patent year 05
05.07.2023Renewal fee patent year 06
04.07.2024Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[Y]WO2009089455  (QUALCOMM INC [US], et al) [Y] 1-22 * paragraphs [0004] , [0005] , [0030] - [0043] *;
 [I]  - NEUMANN ARNE ET AL, "Towards integration of Industrial Ethernet with 5G mobile networks", 2018 14TH IEEE INTERNATIONAL WORKSHOP ON FACTORY COMMUNICATION SYSTEMS (WFCS), IEEE, (20180613), doi:10.1109/WFCS.2018.8402373, pages 1 - 4, XP033369592 [I] 1-22 * the whole document *

DOI:   http://dx.doi.org/10.1109/WFCS.2018.8402373
 [Y]  - "3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 5G System; Interworking between 5G Network and external Data Networks; Stage 3 (Release 15)", 3GPP STANDARD; TECHNICAL SPECIFICATION; 3GPP TS 29.561, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20180426), vol. CT WG3, no. V0.5.0, pages 1 - 42, XP051451185 [Y] 1-22 * paragraphs [0007] , [0008] *
 [A]  - Ahmed Nasrallah ET AL, "Ultra-Low Latency (ULL) Networks: A Comprehensive Survey Covering the IEEE TSN Standard and Related ULL esearch", (20180320), URL: https://ieeexplore.ieee.org/iel7/9739/5451756/08458130.pdf, (20190228), XP055563110 [A] 1-22 * paragraphs [0007] , [0009] *
 [T]  - NOKIA ET AL, "Integration of the 5G System in a TSN network", vol. SA WG2, no. Sophia Antipolis; 20180820 - 20180824, (20180814), 3GPP DRAFT; S2-188100-ARCHITECTURE_FOR_TSN_INTEGRATION_WITH_5G-V2, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRAN, URL: http://www.3gpp.org/ftp/tsg%5Fsa/WG2%5FArch/TSGS2%5F128BIS%5FSophia%5FAntipolis/Docs/S2%2D188100%2Ezip, (20180814), XP051537039
by applicant   - R. Hummen, S. Kehrer, O. Kleineberg, "TSN - Time Sensitive Networking", White Paper, Hirschmann
    - "Stream Reservation Protocol (SRP) Enhancements and Performance Improvements", IEEE 802.1 Qcc, URL: http://www.ieee802.org/1/pages/802.1cc.html
 WO2018EP54916
 WO2018EP61892
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.