EP3673180 - FIXING UNIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.07.2023 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 12.08.2022 | ||
Former | Grant of patent is intended Status updated on 29.05.2022 | ||
Former | Request for examination was made Status updated on 29.05.2020 | ||
Former | The international publication has been made Status updated on 02.03.2019 | ||
Former | unknown Status updated on 04.09.2018 | Most recent event Tooltip | 15.03.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 17.04.2024 [2024/16] | Applicant(s) | For all designated states Amazonen-Werke H. Dreyer SE & Co. KG Am Amazonenwerk 9-13 49205 Hasbergen / DE | [2021/18] |
Former [2021/17] | For all designated states Amazonen-Werk H. Dreyer SE & Co. KG Am Amazonenwerk 9-13 49205 Hasbergen / DE | ||
Former [2020/27] | For all designated states Amazonen-Werke H. Dreyer GmbH & Co. KG Am Amazonenwerk 9-13 49205 Hasbergen / DE | Inventor(s) | 01 /
KLEINE-HARTLAGE, Hubertus Laererstr.11 49186 Bad Iburg / DE | 02 /
KRABBE, Ulrich Am Steinbrink 2a 49205 Hasbergen / DE | 03 /
HOFTER, Rainer Bergstraße 89a 49143 Bissendorf / DE | [2020/27] | Representative(s) | (deleted) | [2022/37] |
Former [2020/27] | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | Application number, filing date | 18758853.8 | 16.08.2018 | [2020/27] | WO2018EP72170 | Priority number, date | DE201710119010 | 21.08.2017 Original published format: DE102017119010 | [2020/27] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2019038163 | Date: | 28.02.2019 | Language: | DE | [2019/09] | Type: | A1 Application with search report | No.: | EP3673180 | Date: | 01.07.2020 | Language: | DE | The application published by WIPO in one of the EPO official languages on 28.02.2019 takes the place of the publication of the European patent application. | [2020/27] | Type: | B1 Patent specification | No.: | EP3673180 | Date: | 14.09.2022 | Language: | DE | [2022/37] | Search report(s) | International search report - published on: | EP | 28.02.2019 | Classification | IPC: | F16B37/04, F16B21/06, F16B33/02 | [2020/27] | CPC: |
F16B33/02 (EP,EA);
F16B37/043 (EP,EA,US);
F16B37/042 (EP,EA,US);
F16B37/04 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | BEFESTIGUNGSEINHEIT | [2020/27] | English: | FIXING UNIT | [2020/27] | French: | UNITÉ DE FIXATION | [2020/27] | Entry into regional phase | 22.01.2020 | National basic fee paid | 22.01.2020 | Designation fee(s) paid | 22.01.2020 | Examination fee paid | Examination procedure | 22.01.2020 | Amendment by applicant (claims and/or description) | 22.01.2020 | Examination requested [2020/27] | 22.01.2020 | Date on which the examining division has become responsible | 30.05.2022 | Communication of intention to grant the patent | 08.08.2022 | Fee for grant paid | 08.08.2022 | Fee for publishing/printing paid | 08.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 15.06.2023 | No opposition filed within time limit [2023/34] | Fees paid | Renewal fee | 13.08.2020 | Renewal fee patent year 03 | 13.08.2021 | Renewal fee patent year 04 | 18.07.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 14.09.2022 | CZ | 14.09.2022 | EE | 14.09.2022 | ES | 14.09.2022 | FI | 14.09.2022 | HR | 14.09.2022 | LT | 14.09.2022 | LV | 14.09.2022 | MC | 14.09.2022 | RO | 14.09.2022 | RS | 14.09.2022 | SE | 14.09.2022 | SI | 14.09.2022 | SK | 14.09.2022 | SM | 14.09.2022 | NO | 14.12.2022 | GR | 15.12.2022 | IS | 14.01.2023 | PT | 16.01.2023 | [2024/16] |
Former [2023/37] | AL | 14.09.2022 | |
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/29] | AL | 14.09.2022 | |
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/27] | CZ | 14.09.2022 | |
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/23] | CZ | 14.09.2022 | |
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
PT | 16.01.2023 | ||
Former [2023/22] | CZ | 14.09.2022 | |
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
PT | 16.01.2023 | ||
Former [2023/20] | FI | 14.09.2022 | |
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
Former [2023/10] | FI | 14.09.2022 | |
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
Former [2023/09] | FI | 14.09.2022 | |
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | ||
Former [2023/08] | FI | 14.09.2022 | |
LT | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | Cited in | International search | [XAI]DE19944685 (BOELLHOFF GMBH [DE]) [X] 1,3-5,11-14,16-18 * Ansprüche 1, 2, 4; Spalte 3, Linien 1-14; Spalte 3, Linien 37-42; Figuren 1-8 * [A] 6-9 [I] 10,15; | [XAI]EP1281876 (LYDALL GERHARDI GMBH & CO KG [DE]) [X] 1-5,11-14,16-18 * Ansprüche 1, 3; Absätze 3, 7; Figuren 1-8 * [A] 6-9 [I] 10,15; | [XAI]DE102006007244 (NEWFREY LLC [US]) [X] 1,3-5,11-18 * Ansprüche 1-4, 8, 10, 11 ; Absätze 9, 11; Figuren 1-6 * [A] 6-9 [I] 10; | [A]US2013078052 (DEGNER BRETT W [US], et al) [A] 10* Absatz 52 * | Examination | US8297169 | by applicant | EP2647852 | EP2684437 |