blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3665963

EP3665963 - WAKE UP SIGNALING IN WIRELESS TELECOMMUNICATION NETWORKS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.12.2022
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  21.01.2022
FormerGrant of patent is intended
Status updated on  07.09.2021
FormerExamination is in progress
Status updated on  27.11.2020
FormerRequest for examination was made
Status updated on  15.05.2020
FormerThe international publication has been made
Status updated on  16.02.2019
Formerunknown
Status updated on  12.09.2018
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
Apple Inc.
One Apple Park Way
Cupertino, CA 95014 / US
[2021/09]
Former [2020/25]For all designated states
Intel Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
Inventor(s)01 / SHRESTHA, Bharat
5551 NE Azores Ct.
Hillsboro, Oregon 97124 / US
02 / GUPTA HYDE, Maruti
3538 SW Dolph Ct.
Portland, Oregon 97219 / US
03 / YE, Qiaoyang
4536 Piper St.
Fremont, California 94538 / US
04 / COX, Timothy
1808 Channing Avenue
Palo Alto, California 94303 / US
 [2020/25]
Representative(s)Lang, Johannes
Bardehle Pagenberg Partnerschaft mbB
Patentanwälte, Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
[2020/25]
Application number, filing date18762440.813.08.2018
[2020/25]
WO2018US46535
Priority number, dateUS201762544276P11.08.2017         Original published format: US 201762544276 P
US201762564976P28.09.2017         Original published format: US 201762564976 P
US201762583347P08.11.2017         Original published format: US 201762583347 P
US201862670647P11.05.2018         Original published format: US 201862670647 P
[2020/25]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019033112
Date:14.02.2019
Language:EN
[2019/07]
Type: A1 Application with search report 
No.:EP3665963
Date:17.06.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 14.02.2019 takes the place of the publication of the European patent application.
[2020/25]
Type: B1 Patent specification 
No.:EP3665963
Date:23.02.2022
Language:EN
[2022/08]
Search report(s)International search report - published on:EP14.02.2019
ClassificationIPC:H04W52/02, H04W68/00, H04W4/70, // H04W76/28, H04W4/06, H04W4/21, H04W48/12
[2021/37]
CPC:
H04W52/0216 (EP,CN,US); H04W52/0235 (EP,CN,US); H04W4/70 (EP,US);
H04W68/00 (EP); H04W68/005 (CN,US); H04W76/11 (US);
H04W8/08 (US); H04W8/24 (US); H04W4/06 (EP);
H04W4/21 (EP); H04W48/12 (EP); H04W76/28 (EP);
Y02D30/70 (EP) (-)
Former IPC [2020/25]H04W52/02, H04W68/00, H04W88/14, H04W88/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/25]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:WECKSIGNALISIERUNG IN DRAHTLOSEN TELEKOMMUNIKATIONSNETZEN[2020/25]
English:WAKE UP SIGNALING IN WIRELESS TELECOMMUNICATION NETWORKS[2020/25]
French:SIGNALISATION DE RÉVEIL DANS DES RÉSEAUX DE TÉLÉCOMMUNICATION SANS FIL[2020/25]
Entry into regional phase11.03.2020National basic fee paid 
11.03.2020Designation fee(s) paid 
11.03.2020Examination fee paid 
Examination procedure11.03.2020Amendment by applicant (claims and/or description)
11.03.2020Examination requested  [2020/25]
11.03.2020Date on which the examining division has become responsible
26.11.2020Despatch of a communication from the examining division (Time limit: M06)
07.06.2021Reply to a communication from the examining division
08.09.2021Communication of intention to grant the patent
17.01.2022Fee for grant paid
17.01.2022Fee for publishing/printing paid
17.01.2022Receipt of the translation of the claim(s)
Opposition(s)24.11.2022No opposition filed within time limit [2023/05]
Fees paidRenewal fee
13.08.2020Renewal fee patent year 03
13.08.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.08.2018
AL23.02.2022
AT23.02.2022
CY23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
IT23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
MK23.02.2022
MT23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
GB13.08.2022
IE13.08.2022
LU13.08.2022
BE31.08.2022
CH31.08.2022
FR31.08.2022
LI31.08.2022
[2024/44]
Former [2024/27]HU13.08.2018
AL23.02.2022
AT23.02.2022
CY23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
IT23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
MK23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
GB13.08.2022
IE13.08.2022
LU13.08.2022
BE31.08.2022
CH31.08.2022
FR31.08.2022
LI31.08.2022
Former [2024/24]HU13.08.2018
AL23.02.2022
AT23.02.2022
CY23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
IT23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
GB13.08.2022
IE13.08.2022
LU13.08.2022
BE31.08.2022
CH31.08.2022
FR31.08.2022
LI31.08.2022
Former [2024/21]AL23.02.2022
AT23.02.2022
CY23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
IT23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
GB13.08.2022
IE13.08.2022
LU13.08.2022
BE31.08.2022
CH31.08.2022
FR31.08.2022
LI31.08.2022
Former [2023/47]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
IT23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
GB13.08.2022
IE13.08.2022
LU13.08.2022
BE31.08.2022
CH31.08.2022
FR31.08.2022
LI31.08.2022
Former [2023/42]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
IT23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
IE13.08.2022
LU13.08.2022
BE31.08.2022
CH31.08.2022
FR31.08.2022
LI31.08.2022
Former [2023/35]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
IT23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
IE13.08.2022
LU13.08.2022
CH31.08.2022
FR31.08.2022
LI31.08.2022
Former [2023/33]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
IE13.08.2022
LU13.08.2022
CH31.08.2022
LI31.08.2022
Former [2023/21]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
LU13.08.2022
CH31.08.2022
LI31.08.2022
Former [2023/16]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
MC23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2023/10]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SI23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2023/01]AL23.02.2022
AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2022/49]AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SK23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2022/48]AT23.02.2022
CZ23.02.2022
DK23.02.2022
EE23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2022/47]AT23.02.2022
DK23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RO23.02.2022
RS23.02.2022
SE23.02.2022
SM23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2022/46]AT23.02.2022
DK23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RS23.02.2022
SE23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2022/42]AT23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RS23.02.2022
SE23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
IS23.06.2022
PT23.06.2022
Former [2022/39]AT23.02.2022
ES23.02.2022
FI23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RS23.02.2022
SE23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
PT23.06.2022
Former [2022/36]AT23.02.2022
ES23.02.2022
HR23.02.2022
LT23.02.2022
LV23.02.2022
NL23.02.2022
PL23.02.2022
RS23.02.2022
SE23.02.2022
BG23.05.2022
NO23.05.2022
GR24.05.2022
PT23.06.2022
Former [2022/35]ES23.02.2022
HR23.02.2022
LT23.02.2022
NL23.02.2022
RS23.02.2022
SE23.02.2022
BG23.05.2022
NO23.05.2022
PT23.06.2022
Former [2022/34]ES23.02.2022
LT23.02.2022
NL23.02.2022
NO23.05.2022
PT23.06.2022
Former [2022/33]LT23.02.2022
NO23.05.2022
Cited inInternational search[IA]US2013044709  (ADJAKPLE PASCAL M [US], et al) [I] 7,21 * figure 3A * * paragraph [0104] - paragraph [0106] * * paragraph [0145] * [A] 1-6,8-20,22-25;
 [XAYI]WO2016072770  (LG ELECTRONICS INC [KR]) [X] 1,2,15,16 * figure 7 * * paragraph [0054] - paragraph [0057] * * paragraph [0077] - paragraph [0081] * * paragraph [0095] - paragraph [0098] * [A] 7-12,21-25 [Y] 4-6,18-20 [I] 3,13,14,17;
 [Y]US2017064670  (SHEN XINGYA [CN], et al) [Y] 4,18 * paragraph [0007] * * claim 42 * * table 1 *;
 [Y]  - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Control (RRC); Protocol specification (Release 14)", 3GPP STANDARD ; TECHNICAL SPECIFICATION ; 3GPP TS 36.331, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20170713), vol. RAN WG2, no. V14.3.0, pages 1 - 745, XP051336663 [Y] 5,6,19,20 * paragraph [10.2.2] *
 [XPI]  - HUAWEI, "Report of email discussion [99bis#35][NB-IoT/MTC] on wake-up signal", vol. RAN WG2, no. Reno, USA; 20171127 - 20171201, (20171117), 3GPP DRAFT; R2-1713186 REPORT OF EMAIL DISCUSSION [99BIS#37][NB-IOT MTC] ON WAKE-UP SIGNAL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPH, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5F100/Docs/, (20171117), XP051371986 [XP] 7,9,11,21,23,25 * paragraph [02.2] * [I] 12
 [XP]  - INTEL CORPORATION, "Power saving signal for efeMTC", vol. RAN WG1, no. Busan, Korea; 20180521 - 20180525, (20180520), 3GPP DRAFT; R1-1806489, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings%5F3GPP%5FSYNC/RAN1/Docs/, (20180520), XP051441691 [XP] 13,14 * paragraph [02.3] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.