EP3648971 - ELECTROSTATIC DISCHARGE NOISE SUPPRESSION BY CONDUCTION BETWEEN A TIERED METALLIC ELEMENT AND THE ELECTRICAL SYSTEM OF A GLAZING [Right-click to bookmark this link] | |||
Former [2020/20] | SUPPRESSION OF ELECTROSTATIC DISCHARGE NOISE BY MEANS OF CONDUCTION BETWEEN A TIERED METAL ELEMENT AND THE WIRING SYSTEM OF A GLAZING UNIT | ||
[2020/52] | Status | No opposition filed within time limit Status updated on 25.03.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 16.04.2021 | ||
Former | Grant of patent is intended Status updated on 06.12.2020 | ||
Former | Request for examination was made Status updated on 10.04.2020 | ||
Former | The international publication has been made Status updated on 12.01.2019 | ||
Former | unknown Status updated on 19.09.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states SAINT-GOBAIN GLASS FRANCE Tour Saint-Gobain 12 place de l'Iris 92400 Courbevoie / FR | For all designated states AIRBUS OPERATIONS (S.A.S.) 316, route de Bayonne 31060 Toulouse / FR | [2020/24] |
Former [2020/20] | For all designated states Saint-Gobain Glass France 18 Avenue d'Alsace 92400 Courbevoie / FR | ||
For all designated states AIRBUS OPERATIONS (S.A.S.) 316, route de Bayonne 31060 Toulouse / FR | Inventor(s) | 01 /
DEBRUS, Marie-Hélène 1164 Les Grands Champs 45570 Dampierre en Burly / FR | 02 /
TONDU, Thomas 27 rue des Vergers 45600 Sully / FR | 03 /
UNFER, Catherine AIRBUS OPERATIONS SAS 316, route de Bayonne 31060 Toulouse / FR | 04 /
FLOURENS, Franck AIRBUS OPERATIONS SAS 316, route de Bayonne 31060 Toulouse / FR | 05 /
DELVERDIER, Osmin AIRBUS OPERATIONS SAS 316, route de Bayonne 31060 Toulouse / FR | 06 /
CANALES, Hugo AIRBUS OPERATIONS SAS 316, route de Bayonne 31060 Toulouse / FR | [2020/20] | Representative(s) | Saint-Gobain Recherche B.P. 135 39, quai Lucien Lefranc 93303 Aubervilliers Cedex / FR | [2020/20] | Application number, filing date | 18765686.3 | 06.07.2018 | [2020/20] | WO2018FR51696 | Priority number, date | FR20170000719 | 06.07.2017 Original published format: FR 1700719 | [2020/20] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2019008289 | Date: | 10.01.2019 | Language: | FR | [2019/02] | Type: | A1 Application with search report | No.: | EP3648971 | Date: | 13.05.2020 | Language: | FR | The application published by WIPO in one of the EPO official languages on 10.01.2019 takes the place of the publication of the European patent application. | [2020/20] | Type: | B1 Patent specification | No.: | EP3648971 | Date: | 19.05.2021 | Language: | FR | [2021/20] | Search report(s) | International search report - published on: | EP | 10.01.2019 | Classification | IPC: | B32B17/10, B64C1/14, B64D45/02 | [2020/52] | CPC: |
B32B17/10036 (EP,IL,KR,US);
B32B17/10 (IL,RU);
B32B17/10174 (EP,IL,KR);
B32B17/10293 (EP,IL,KR,US);
B32B17/10376 (EP,IL,KR,US);
B32B17/10385 (EP,IL,KR,US);
B32B17/10743 (IL,US);
B32B17/10761 (EP,IL,KR,US);
B32B17/1077 (EP,IL,US);
B32B17/10788 (EP,IL,KR,US);
B64C1/1492 (EP,IL,KR,US);
B64D45/02 (EP,IL,KR,US);
H05B3/86 (IL,US);
B32B2307/21 (KR);
B32B2605/18 (EP,IL,KR,US);
B64D2221/00 (IL,US)
(-)
|
Former IPC [2020/20] | B32B17/10, B64C1/14, H05K9/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | UNTERDRÜCKUNG DES ELEKTROSTATISCHEN ENTLADUNGSGERÄUSCHS DURCH LEITUNG ZWISCHEN EINEM GESTAFFELTEN METALLISCHEN ELEMENT UND DEM ELEKTRISCHEN SYSTEM EINER VERGLASUNG | [2020/52] | English: | ELECTROSTATIC DISCHARGE NOISE SUPPRESSION BY CONDUCTION BETWEEN A TIERED METALLIC ELEMENT AND THE ELECTRICAL SYSTEM OF A GLAZING | [2020/52] | French: | SUPPRESSION DU BRUIT DE DECHARGE ELECTROSTATIQUE PAR CONDUCTION ENTRE UN ELEMENT METALLIQUE EN GRADIN ET LE RESEAU ELECTRIQUE D'UN VITRAGE | [2020/20] |
Former [2020/20] | UNTERDRÜCKUNG VON ELEKTROSTATISCHEM ENTLADUNGSRAUSCHEN MITTELS LEITUNG ZWISCHEN EINEM GESTAFFELTEN METALLELEMENT UND DEM VERDRAHTUNGSSYSTEM EINER VERGLASUNGSEINHEIT | ||
Former [2020/20] | SUPPRESSION OF ELECTROSTATIC DISCHARGE NOISE BY MEANS OF CONDUCTION BETWEEN A TIERED METAL ELEMENT AND THE WIRING SYSTEM OF A GLAZING UNIT | Entry into regional phase | 06.02.2020 | National basic fee paid | 06.02.2020 | Designation fee(s) paid | 06.02.2020 | Examination fee paid | Examination procedure | 06.02.2020 | Examination requested [2020/20] | 06.02.2020 | Date on which the examining division has become responsible | 07.07.2020 | Amendment by applicant (claims and/or description) | 07.12.2020 | Communication of intention to grant the patent | 02.04.2021 | Receipt of the translation of the claim(s) | 06.04.2021 | Fee for grant paid | 06.04.2021 | Fee for publishing/printing paid | Opposition(s) | 22.02.2022 | No opposition filed within time limit [2022/17] | Fees paid | Renewal fee | 31.07.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.07.2018 | AL | 19.05.2021 | AT | 19.05.2021 | CY | 19.05.2021 | CZ | 19.05.2021 | DK | 19.05.2021 | EE | 19.05.2021 | ES | 19.05.2021 | FI | 19.05.2021 | HR | 19.05.2021 | LT | 19.05.2021 | LV | 19.05.2021 | MC | 19.05.2021 | MK | 19.05.2021 | RO | 19.05.2021 | RS | 19.05.2021 | SE | 19.05.2021 | SI | 19.05.2021 | SK | 19.05.2021 | SM | 19.05.2021 | IE | 06.07.2021 | LU | 06.07.2021 | BE | 31.07.2021 | CH | 31.07.2021 | LI | 31.07.2021 | BG | 19.08.2021 | NO | 19.08.2021 | GR | 20.08.2021 | IS | 19.09.2021 | PT | 20.09.2021 | [2024/23] |
Former [2023/33] | HU | 06.07.2018 | |
AL | 19.05.2021 | ||
AT | 19.05.2021 | ||
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
IE | 06.07.2021 | ||
LU | 06.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2023/30] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
IE | 06.07.2021 | ||
LU | 06.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/35] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
IE | 06.07.2021 | ||
LU | 06.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/34] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
LU | 06.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/29] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
LU | 06.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/26] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
LU | 06.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/23] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
LU | 06.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/21] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/18] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/08] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/07] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/51] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/50] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
Former [2021/49] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
Former [2021/46] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
LT | 19.05.2021 | ||
BG | 19.08.2021 | Cited in | International search | [A]JP2000286591 ; | [A]US3953630 (ROBERTS WILLIAM GARY, et al) [A] 1-13 * column 1, lines 29-43 * * column 2, lines 1-4, 53-67 * * figure 1 *; | [A]US3974359 (ORCUTT DEE R, et al) [A] 1-13 * column 4, line 64 - column 5, line 5 * * claims 1-3 *; | [A]EP0376190 (PPG INDUSTRIES INC [US]) [A] 1-13 * column 2, lines 24-42 * * figure 1 * * claim 1 *; | [A]FR2888082 (SAINT GOBAIN [FR]) [A] 1-13 * page 2, lines 3-19 * * page 5, lines 6-18 * * page 7, line 22 - page 8, line 13 * * figure 1 * * claims 1, 10, 11 *; | [A]US2013026296 (YOKOI TAKASHI [JP]) [A] 1-13 * paragraphs [0001] , [ 0005] , [ 0007] , [ 0010] - [0019] * * figures 2, 3A, 4 * * claims 1-3, 6 *; | [A] - DATABASE WPI, 0, Derwent World Patents Index, (20001013), vol. 2001, no. 01, Database accession no. 2001-003055, XP002778085 & JP2000286591 A 20001013 (ASAHI GLASS CO LTD) [A] 1-13 * abstract * * paragraphs [0001] , [ 0011] - [0013] - [ 0020] * * figures 1-3 * * claims 1-4 * |