Extract from the Register of European Patents

EP About this file: EP3596820

EP3596820 - SOLAR ENERGY SYSTEM FOR USE WITH TUFTED GEOSYNTHETICS [Right-click to bookmark this link]
StatusThe patent has been granted
Status updated on  12.09.2025
Database last updated on 28.03.2026
FormerGrant of patent is intended
Status updated on  08.05.2025
FormerExamination is in progress
Status updated on  21.03.2025
FormerGrant of patent is intended
Status updated on  21.11.2024
FormerExamination is in progress
Status updated on  09.09.2022
FormerRequest for examination was made
Status updated on  20.12.2019
FormerThe international publication has been made
Status updated on  22.09.2018
Most recent event   Tooltip07.11.2025Correction of patent specificationpublished on 10.12.2025  [2025/50]
Applicant(s)For all designated states
Watershed Geosynthetics LLC
1125 Sanctuary Parkway
Suite 180
Alpharetta, GA 30009 / US
[2025/46]
Former [2024/29]For all designated states
Watershed Geosynthetics LLC
11400 Atlantis Place, Suite 200
Alpharetta, GA 30022 / US
Former [2020/04]For all designated states
Watershed Holdings, LLC
11400 Atlantis Place
Suite 200
Alpharetta, Georgia 30022 / US
Inventor(s)01 / AYERS, Michael R.
260 Willow Glade Point
Johns Creek, GA 30022 / US
02 / URRUTIA, Jose L.
3665 Ansley Park Dr.
Suwanee, GA 30024 / US
03 / LUCINI, Gregory
1 Old Farm Road
Berkley, MA 02779 / US
04 / LUCINI, Michael
12 Dimick St. 1
Somerville, MA 02143 / US
 [2024/52]
Former [2020/04]01 / AYERS, Michael R.
260 Willow Glade Point
Johns Creek Georgia 30022 / US
02 / URRUTIA, Jose L.
3665 Ansley Park Dr.
Suwanee Georgia 30024 / US
03 / LUCINI, Gregory
1 Old Farm Road
Berkley Massachusetts 02779 / US
04 / LUCINI, Michael
12 Dimick St. 1
Somerville Massachusetts 02143 / US
Representative(s)Murgitroyd & Company
165-169 Scotland Street
Glasgow G5 8PL / GB
[2025/42]
Former [2020/04]Hanna Moore + Curley
Garryard House
25/26 Earlsfort Terrace
Dublin 2, D02 PX51 / IE
Application number, filing date18767548.314.03.2018
[2020/04]
WO2018US22435
Priority number, dateUS201762470914P14.03.2017         Original published format: US 201762470914 P
[2020/04]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018170128
Date:20.09.2018
Language:EN
[2018/38]
Type: A1 Application with search report 
No.:EP3596820
Date:22.01.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 20.09.2018 takes the place of the publication of the European patent application.
[2020/04]
Type: B1 Patent specification 
No.:EP3596820
Date:15.10.2025
Language:EN
[2025/42]
Type: B8 Corrected title page of specification 
No.:EP3596820
Date:10.12.2025
[2025/50]
Search report(s)International search report - published on:US20.09.2018
(Supplementary) European search report - dispatched on:EP16.12.2020
ClassificationIPC:H02S20/10, H02S40/22, H02J3/38
[2021/02]
CPC:
H02S40/22 (EP,US); E01C13/08 (US); H02J3/38 (US);
H02J3/381 (EP,US); H02S20/10 (EP,US); H02S30/10 (US);
H02J2101/24 (EP,US); H02S40/34 (US); H10F10/148 (US);
Y02E10/50 (EP); Y02E10/52 (EP,US); Y02E10/547 (EP);
Y02E10/56 (EP) (-)
Former IPC [2020/04]H02S20/10, H01L31/042, H02S20/20
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/04]  
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:SOLARENERGIESYSTEM ZUR VERWENDUNG MIT GETUFTETEN GEOSYNTHETIKA[2020/04]
English:SOLAR ENERGY SYSTEM FOR USE WITH TUFTED GEOSYNTHETICS[2020/04]
French:SYSTÈME D'ÉNERGIE SOLAIRE À UTILISER AVEC DES GÉOSYNTHÉTIQUES TOUFFETÉS[2020/04]
Entry into regional phase26.09.2019National basic fee paid 
26.09.2019Search fee paid 
26.09.2019Designation fee(s) paid 
26.09.2019Examination fee paid 
Examination procedure14.01.2019Request for preliminary examination filed
International Preliminary Examining Authority: US
26.09.2019Examination requested  [2020/04]
07.07.2021Amendment by applicant (claims and/or description)
13.09.2022Despatch of a communication from the examining division (Time limit: M04)
21.12.2022Reply to a communication from the examining division
22.11.2024Communication of intention to grant the patent
19.03.2025Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
08.05.2025Communication of intention to grant the patent
08.09.2025Fee for grant paid
08.09.2025Fee for publishing/printing paid
08.09.2025Receipt of the translation of the claim(s)
Fees paidRenewal fee
13.11.2019Renewal fee patent year 03
04.03.2021Renewal fee patent year 04
29.03.2022Renewal fee patent year 05
28.03.2023Renewal fee patent year 06
20.03.2024Renewal fee patent year 07
28.03.2025Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[YA] US2015337516  (FRENCH SR WILLIAM L et al.) [Y] 1-4,6-12,14 * paragraphs [0071] - [0075]; figure 5 * * paragraphs [0091] - [0098]; figure 9 *[A] 5,13
 [A] US2015331972  (MCCLURE TUCKER et al.) [A] 2,12 * paragraphs [0200] - [0202] *
 [Y]   GRACE ET AL: "Landfill Turned into Solar- Powered Generation Facility", LANDFILL TECHNOLOGIES, 1 March 2015 (2015-03-01), XP055541418, Retrieved from the Internet [retrieved on 20190114] [Y] 1-4,6-12,14 * left column, second-to-last paragraph; page 9 *
International search[Y] US2015331972  (MCCLURE TUCKER et al.) [Y] 1-20 * entire document *
 [Y] US2011194900  (FRENCH SR WILLIAM L et al.) [Y] 9 * entire document *
 [Y] US2011277296  (RAMOS ANDREW R et al.) [Y] 13, 19, 20 * entire document *
 [A] US2013056595  (TOMLINSON JOSEPH et al.) [A] 1-20 * entire document *
 [A] US5990413  (ORTABASI UGUR et al.) [A] 1-20 * entire document *
 [Y]   GRACE, MELISSA: "Landfill Turned into Solar-Powered Generation Facility.", LANDFILL TECHNOLOGIES, March 2015 (2015-03-01), XP055541418, Retrieved from the Internet [retrieved on 20180506] [Y] 1-20 * . See page 8 of the ISA/237. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.