EP3598833 - COMMUNICATION METHOD AND APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.10.2022 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 05.11.2021 | ||
Former | Grant of patent is intended Status updated on 28.06.2021 | ||
Former | Examination is in progress Status updated on 13.11.2020 | ||
Former | Request for examination was made Status updated on 20.12.2019 | ||
Former | The international publication has been made Status updated on 29.09.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2021/49] |
Former [2020/04] | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | Inventor(s) | 01 /
HAN, Feng Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 02 /
JIN, Yinghao Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 03 /
LI, Hong Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2020/04] | Representative(s) | Thun, Clemens, et al Mitscherlich PartmbB Patent- und Rechtsanwälte Karlstraße 7 80333 München / DE | [N/P] |
Former [2021/49] | Thun, Clemens, et al Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstraße 33 80331 München / DE | ||
Former [2020/04] | Körber, Martin Hans Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstrasse 33 80331 München / DE | Application number, filing date | 18771166.8 | 23.03.2018 | [2020/04] | WO2018CN80336 | Priority number, date | CN201710185971 | 24.03.2017 Original published format: CN201710185971 | [2020/04] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018171756 | Date: | 27.09.2018 | Language: | ZH | [2018/39] | Type: | A1 Application with search report | No.: | EP3598833 | Date: | 22.01.2020 | Language: | EN | [2020/04] | Type: | B1 Patent specification | No.: | EP3598833 | Date: | 08.12.2021 | Language: | EN | [2021/49] | Search report(s) | International search report - published on: | CN | 27.09.2018 | (Supplementary) European search report - dispatched on: | EP | 14.02.2020 | Classification | IPC: | H04W74/00, // H04W74/08, H04W76/50 | [2020/12] | CPC: |
H04W74/006 (EP,CN,US);
H04W36/0077 (US);
H04W74/002 (US);
H04W74/004 (US);
H04W74/008 (US);
H04W74/0833 (EP,CN,US);
H04W76/50 (EP)
(-)
|
Former IPC [2020/04] | H04W74/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | KOMMUNIKATIONSVERFAHREN UND -VORRICHTUNG | [2020/04] | English: | COMMUNICATION METHOD AND APPARATUS | [2020/04] | French: | PROCÉDÉ ET APPAREIL DE COMMUNICATION | [2020/04] | Entry into regional phase | 15.10.2019 | Translation filed | 15.10.2019 | National basic fee paid | 15.10.2019 | Search fee paid | 15.10.2019 | Designation fee(s) paid | 15.10.2019 | Examination fee paid | Examination procedure | 15.10.2019 | Examination requested [2020/04] | 02.09.2020 | Amendment by applicant (claims and/or description) | 13.11.2020 | Despatch of a communication from the examining division (Time limit: M04) | 08.03.2021 | Reply to a communication from the examining division | 29.06.2021 | Communication of intention to grant the patent | 16.09.2021 | Fee for grant paid | 16.09.2021 | Fee for publishing/printing paid | 02.11.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21212432.5 / EP4057756 | Opposition(s) | 09.09.2022 | No opposition filed within time limit [2022/46] | Fees paid | Renewal fee | 15.10.2019 | Renewal fee patent year 03 | 26.03.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.03.2018 | AL | 08.12.2021 | AT | 08.12.2021 | CY | 08.12.2021 | CZ | 08.12.2021 | DK | 08.12.2021 | EE | 08.12.2021 | ES | 08.12.2021 | FI | 08.12.2021 | HR | 08.12.2021 | IT | 08.12.2021 | LT | 08.12.2021 | LV | 08.12.2021 | MC | 08.12.2021 | MK | 08.12.2021 | NL | 08.12.2021 | PL | 08.12.2021 | RO | 08.12.2021 | RS | 08.12.2021 | SE | 08.12.2021 | SI | 08.12.2021 | SK | 08.12.2021 | SM | 08.12.2021 | TR | 08.12.2021 | BG | 08.03.2022 | NO | 08.03.2022 | GR | 09.03.2022 | IE | 23.03.2022 | LU | 23.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | LI | 31.03.2022 | IS | 08.04.2022 | PT | 08.04.2022 | [2024/29] |
Former [2024/24] | HU | 23.03.2018 | |
AL | 08.12.2021 | ||
AT | 08.12.2021 | ||
CY | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
MK | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IE | 23.03.2022 | ||
LU | 23.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2024/23] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CY | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
MK | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IE | 23.03.2022 | ||
LU | 23.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2024/20] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CY | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IE | 23.03.2022 | ||
LU | 23.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2023/27] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IE | 23.03.2022 | ||
LU | 23.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2023/10] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IE | 23.03.2022 | ||
LU | 23.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2023/09] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IE | 23.03.2022 | ||
LU | 23.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2023/08] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IE | 23.03.2022 | ||
LU | 23.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2023/01] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/49] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/47] | AT | 08.12.2021 | |
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/46] | AT | 08.12.2021 | |
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/42] | AT | 08.12.2021 | |
CZ | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/36] | AT | 08.12.2021 | |
CZ | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
PT | 08.04.2022 | ||
Former [2022/35] | CZ | 08.12.2021 | |
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
PT | 08.04.2022 | ||
Former [2022/34] | EE | 08.12.2021 | |
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
PT | 08.04.2022 | ||
Former [2022/33] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/30] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/25] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/24] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
BG | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/22] | FI | 08.12.2021 | |
LT | 08.12.2021 | ||
RS | 08.12.2021 | ||
BG | 08.03.2022 | ||
Former [2022/21] | RS | 08.12.2021 | |
BG | 08.03.2022 | ||
Former [2022/19] | BG | 08.03.2022 | Documents cited: | Search | [XY]US2013242730 (PELLETIER GHYSLAIN [CA], et al) [X] 1-6,10-13 * paragraphs [0029] , [0 30] , [0070] - [0073] - [0099] , [0100] , [0106] , [0141] - [0194] - [0222] * * figures 1a,3 * [Y] 7-9,14,15; | [Y] - CMCC ET AL, "Differentiate access causes in RACH backoff - Further discus", vol. RAN WG2, no. Shenzhen, China; 20080331 - 20080404, (20080325), 3GPP DRAFT; R2-081631 DIFFERENTIATE ACCESS CAUSES IN RACH BACKOFFÂ CFURTHER DISCUSSION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_61bis/Docs/, (20080325), XP050817274 [Y] 7,8,14,15 * section2 * | [Y] - HUAWEI ET AL, "Acquisition and update of system information", vol. RAN WG2, no. Prague, Czech Republic; 20140210 - 20140214, (20140209), 3GPP DRAFT; R2-140055, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20140209), XP050791491 [Y] 9 * section 2.2 * | International search | [A]US2008233966 (SCHEIM JACOB [IL], et al) [A] 1-24* , entire document *; | [A]CN101998464 (CHINA MOBILE COMM CORP) [A] 1-24 * , entire document *; | [A]CN102573101 (INST COMPUTING TECH CN ACADEMY) [A] 1-24 * , entire document *; | [X]CN105764152 (LENOVO BEIJING LTD) [X] 1, 6, 11, 16, 21-24 * , see description, paragraphs [0005]-[0245] * |