blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3679622

EP3679622 - METHOD AND APPARATUS FOR PRODUCING A PLURALITY OF ELECTRODE STACKS [Right-click to bookmark this link]
Former [2020/29]METHOD AND APPARATUS FOR PRODUCING AN ELECTRODE STACK
[2022/06]
StatusNo opposition filed within time limit
Status updated on  05.05.2023
Database last updated on 18.09.2024
FormerThe patent has been granted
Status updated on  27.05.2022
FormerGrant of patent is intended
Status updated on  07.02.2022
FormerRequest for examination was made
Status updated on  12.06.2020
FormerThe international publication has been made
Status updated on  16.03.2019
Formerunknown
Status updated on  08.10.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
OPTIMA life science GmbH
Steinbeisweg 20
74523 Schwäbisch Hall / DE
[N/P]
Former [2020/29]For all designated states
Optima Life Science GmbH
Steinbeisweg 20
74523 Schwäbisch Hall / DE
Inventor(s)01 / FEYERHERD, Jürgen
Steinäckerweg 18
74545 Michelfeld / DE
02 / JANSEN, Johannes
Wiesenstraße 65
74545 Michelfeld / DE
03 / WIELAND, Werner
Waldbuch 25
74586 Frankenhardt / DE
 [2020/29]
Representative(s)Patentanwälte Ruff, Wilhelm, Beier, Dauster & Partner mbB
Kronenstraße 30
70174 Stuttgart / DE
[2020/29]
Application number, filing date18778376.607.09.2018
[2020/29]
WO2018EP74088
Priority number, dateDE20171021590508.09.2017         Original published format: DE102017215905
[2020/29]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2019048589
Date:14.03.2019
Language:DE
[2019/11]
Type: A1 Application with search report 
No.:EP3679622
Date:15.07.2020
Language:DE
The application published by WIPO in one of the EPO official languages on 14.03.2019 takes the place of the publication of the European patent application.
[2020/29]
Type: B1 Patent specification 
No.:EP3679622
Date:29.06.2022
Language:DE
[2022/26]
Search report(s)International search report - published on:EP14.03.2019
ClassificationIPC:H01M10/04
[2020/29]
CPC:
H01M10/0404 (EP); H01M10/0413 (EP); H01M10/0468 (EP);
Y02E60/10 (EP); Y02P70/50 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/29]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR HERSTELLUNG MEHRERER ELEKTRODENSTAPEL[2022/06]
English:METHOD AND APPARATUS FOR PRODUCING A PLURALITY OF ELECTRODE STACKS[2022/06]
French:PROCÉDÉ ET DISPOSITIF POUR LA FABRICATION DES EMPILEMENTS D'ÉLECTRODES[2022/06]
Former [2020/29]VERFAHREN UND VORRICHTUNG ZUR HERSTELLUNG EINES ELEKTRODENSTAPELS
Former [2020/29]METHOD AND APPARATUS FOR PRODUCING AN ELECTRODE STACK
Former [2020/29]PROCÉDÉ ET DISPOSITIF POUR LA FABRICATION D'UN EMPILEMENT D'ÉLECTRODES
Entry into regional phase03.04.2020National basic fee paid 
03.04.2020Designation fee(s) paid 
03.04.2020Examination fee paid 
Examination procedure03.04.2020Examination requested  [2020/29]
03.04.2020Date on which the examining division has become responsible
01.10.2020Amendment by applicant (claims and/or description)
08.02.2022Communication of intention to grant the patent
23.05.2022Fee for grant paid
23.05.2022Fee for publishing/printing paid
23.05.2022Receipt of the translation of the claim(s)
Opposition(s)30.03.2023No opposition filed within time limit [2023/23]
Fees paidRenewal fee
24.09.2020Renewal fee patent year 03
16.09.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.09.2018
AL29.06.2022
CY29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
IT29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
MK29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
TR29.06.2022
IE07.09.2022
LU07.09.2022
BG29.09.2022
GB29.09.2022
NO29.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
GR30.09.2022
LI30.09.2022
IS29.10.2022
PT31.10.2022
[2024/29]
Former [2024/27]HU07.09.2018
AL29.06.2022
CY29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
IT29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
MK29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
IE07.09.2022
LU07.09.2022
BG29.09.2022
GB29.09.2022
NO29.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
GR30.09.2022
LI30.09.2022
IS29.10.2022
PT31.10.2022
Former [2024/24]HU07.09.2018
AL29.06.2022
CY29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
IT29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
IE07.09.2022
LU07.09.2022
BG29.09.2022
GB29.09.2022
NO29.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
GR30.09.2022
LI30.09.2022
IS29.10.2022
PT31.10.2022
Former [2024/21]AL29.06.2022
CY29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
IT29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
IE07.09.2022
LU07.09.2022
BG29.09.2022
GB29.09.2022
NO29.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
GR30.09.2022
LI30.09.2022
IS29.10.2022
PT31.10.2022
Former [2024/11]AL29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
IT29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
IE07.09.2022
LU07.09.2022
BG29.09.2022
GB29.09.2022
NO29.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
GR30.09.2022
LI30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/47]AL29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
IE07.09.2022
LU07.09.2022
BG29.09.2022
GB29.09.2022
NO29.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
GR30.09.2022
LI30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/42]AL29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
IE07.09.2022
LU07.09.2022
BG29.09.2022
NO29.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
GR30.09.2022
LI30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/37]AL29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SI29.06.2022
SK29.06.2022
SM29.06.2022
IE07.09.2022
LU07.09.2022
BG29.09.2022
NO29.09.2022
CH30.09.2022
FR30.09.2022
GR30.09.2022
LI30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/35]AL29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
IE07.09.2022
LU07.09.2022
BG29.09.2022
NO29.09.2022
CH30.09.2022
FR30.09.2022
GR30.09.2022
LI30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/33]AL29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
IE07.09.2022
LU07.09.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/30]AL29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
LU07.09.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/22]AL29.06.2022
CZ29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
MC29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/21]AL29.06.2022
DK29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/17]AL29.06.2022
EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/12]EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
IS29.10.2022
PT31.10.2022
Former [2023/11]EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
PL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
PT31.10.2022
Former [2023/09]EE29.06.2022
ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
RO29.06.2022
RS29.06.2022
SE29.06.2022
SK29.06.2022
SM29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
PT31.10.2022
Former [2023/08]ES29.06.2022
FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
RS29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2023/02]FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
NL29.06.2022
RS29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2022/50]FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
RS29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2022/49]FI29.06.2022
HR29.06.2022
LT29.06.2022
LV29.06.2022
SE29.06.2022
BG29.09.2022
NO29.09.2022
GR30.09.2022
Former [2022/47]FI29.06.2022
LT29.06.2022
SE29.06.2022
NO29.09.2022
Cited inInternational search[Y]EP2696421  (NISSAN MOTOR [JP]) [Y] 1-13* paragraphs [0019] - [0034]; figures 5, 6 *;
 [XYI]EP2889948  (NIKKISO CO LTD [JP]) [X] 1,3,7,8 * paragraphs [0025] - [0039]; figure 2 * [Y] 1-13 [I] 2,4-6,9-13
by applicantUS2013111739
 US2014109396
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.