blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3688900

EP3688900 - MULTIPLE CQI REPORTING PROCESSES [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  29.07.2022
Database last updated on 03.09.2024
FormerExamination is in progress
Status updated on  03.06.2022
FormerRequest for examination was made
Status updated on  13.05.2022
FormerGrant of patent is intended
Status updated on  25.04.2022
FormerRequest for examination was made
Status updated on  03.07.2020
FormerThe international publication has been made
Status updated on  06.04.2019
Formerunknown
Status updated on  30.10.2018
Most recent event   Tooltip29.07.2022Withdrawal of applicationpublished on 31.08.2022  [2022/35]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (PUBL)
164 83 Stockholm / SE
[2020/32]
Inventor(s)01 / KITTICHOKECHAI, Kittipong
Minutgränd 43
SE 177 63 Järfälla / SE
02 / ANDGART, Niklas
Femmötesvägen 48
SE-247 33 Södra Sandby / SE
03 / FRÖBERG OLSSON, Jonas
Nilsbovägen 9
SE-590 74 Ljungsbro / SE
04 / SHAPIN, Alexey
Blidvägen 175
SE 97 632 Luleå / SE
05 / STATHAKIS, Efthymios
Arbetargatan 23 A
SE 112 45 Stockholm / SE
06 / WIKSTRÖM, Gustav
Arrendevägen 23
SE-187 30 Täby / SE
 [2020/32]
Representative(s)Ericsson
Patent Development
Torshamnsgatan 21-23
164 80 Stockholm / SE
[2020/32]
Application number, filing date18789220.324.09.2018
[2020/32]
WO2018IB57371
Priority number, dateUS201762566143P29.09.2017         Original published format: US 201762566143 P
[2020/32]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019064163
Date:04.04.2019
Language:EN
[2019/14]
Type: A1 Application with search report 
No.:EP3688900
Date:05.08.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 04.04.2019 takes the place of the publication of the European patent application.
[2020/32]
Search report(s)International search report - published on:EP04.04.2019
ClassificationIPC:H04L1/00
[2020/32]
CPC:
H04L1/0001 (EP,US); H04W24/10 (US); H04B17/336 (US);
H04L1/0018 (EP,US); H04L1/0026 (EP,US); H04W84/045 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/32]
TitleGerman:VERFAHREN ZUR MELDUNG VON MEHRFACH-CQI[2020/32]
English:MULTIPLE CQI REPORTING PROCESSES[2020/32]
French:PROCÉDÉS DE RAPPORT CQI MULTIPLES[2020/32]
Entry into regional phase20.03.2020National basic fee paid 
20.03.2020Designation fee(s) paid 
20.03.2020Examination fee paid 
Examination proceduredeletedCommunication of intention to grant the patent
20.03.2020Examination requested  [2020/32]
20.03.2020Date on which the examining division has become responsible
05.11.2020Amendment by applicant (claims and/or description)
26.04.2022Communication of intention to grant the patent
10.05.2022Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
03.06.2022Despatch of a communication from the examining division (Time limit: M04)
25.07.2022Application withdrawn by applicant  [2022/35]
Fees paidRenewal fee
28.09.2020Renewal fee patent year 03
27.09.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]US2016087777  (IHM BIN-CHUL [KR]) [A] 1-36* paragraphs [0038] - [0052]; figures 2-5 *;
 [XYI]WO2016174527  (ALCATEL LUCENT [FR]) [X] 1-5,11-15,21,22,24,25,28,29,31,32,35,36 * page 7, line 14 - page 12, line 16; figure 2 * [Y] 6,16,26,33 [I] 7-10,17-20,23,27,30,34;
 [XYI]  - INTEL CORPORATION, "On link adaptation enhancements to support URLLC", vol. RAN WG1, no. Nagoya, Japan; 20170918 - 20170921, (20170917), 3GPP DRAFT; R1-1716326 INTEL - URLLC_LA, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170917), XP051339782 [X] 1-5,11-15,21,22,24,25,28,29,31,32,35,36 * Sections 3-5 * [Y] 6,16,26,33 [I] 7-10,17-20,23,27,30,34
 [XYI]  - ZTE ET AL, "Ultra-reliable part of URLLC for scheduling and HARQ procedure", vol. RAN WG1, no. Nagoya, Japan; 20170918 - 20170921, (20170917), 3GPP DRAFT; R1-1715529 ULTRA-RELIABLE PART OF URLLC FOR SCHEDULING AND HARQ PROCEDURE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-AN, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170917), XP051338996 [X] 1-5,11-15,21,22,24,25,28,29,31,32,35,36 * Section 4 * [Y] 6,16,26,33 [I] 7-10,17-20,23,27,30,34
 [A]  - HUAWEI ET AL, "Link adaption and CSI reporting for URLLC transmission", vol. RAN WG1, no. Nagoya, Japan; 20170918 - 20170921, (20170917), 3GPP DRAFT; R1-1715414, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170917), XP051338882 [A] 1-36 * Sections 1, 2, 2.1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.