blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3618452

EP3618452 - CONTROL SYSTEM, SCENE CONTROL EXECUTION METHOD, AND PROGRAM [Right-click to bookmark this link]
Former [2020/10]CONTROL SYSTEM, EXECUTION METHOD OF SCENE CONTROL, AND PROGRAM
[2020/52]
StatusNo opposition filed within time limit
Status updated on  15.04.2022
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  10.05.2021
FormerGrant of patent is intended
Status updated on  22.11.2020
FormerRequest for examination was made
Status updated on  31.01.2020
FormerThe international publication has been made
Status updated on  03.11.2018
Most recent event   Tooltip10.05.2024Lapse of the patent in a contracting state
New state(s): HU
published on 12.06.2024  [2024/24]
Applicant(s)For all designated states
Panasonic Intellectual Property Management Co., Ltd.
1-61, Shiromi 2-chome
Chuo-ku
Osaka-shi, Osaka 540-6207 / JP
[2020/10]
Inventor(s)01 / AIZU, Kazuhiro
c/o Panasonic Intellectual Property
Management Co., Ltd.
1-61, Shiromi 2-chome
Chuoku
Osaka-shi, Osaka 540-6207 / JP
02 / JULAYHI, Jasmeen
c/o Panasonic Intellectual Property
Management Co., Ltd.
1-61, Shiromi 2-chome
Chuo-ku
Osaka-shi, Osaka 540-6207 / JP
03 / SATOU, Minoru
c/o Panasonic Intellectual Property
Management Co., Ltd.
1-61, Shiromi 2-chome
Chuo-ku
Osaka-shi, Osaka 540-6207 / JP
04 / MASUDA, Rikiya
c/o Panasonic Intellectual Property
Management Co., Ltd.
1-61, Shiromi 2-chome
Chuo-ku
Osaka-shi, Osaka 540-6207 / JP
05 / OHNO, Masami
c/o Panasonic Intellectual Property
Management Co., Ltd.
1-61, Shiromi 2-chome
Chuo-ku
Osaka-shi, Osaka 540-6207 / JP
06 / IMAI, Tomikazu
c/o Panasonic Intellectual Property
Management Co., Ltd.
1-61, Shiromi 2-chome
Chuo-ku
Osaka-shi, Osaka 540-6207 / JP
 [2020/10]
Representative(s)Appelt, Christian W.
Boehmert & Boehmert
Anwaltspartnerschaft mbB
Pettenkoferstrasse 22
80336 München / DE
[2020/10]
Application number, filing date18790034.505.04.2018
[2020/10]
WO2018JP14510
Priority number, dateJP2017008536024.04.2017         Original published format: JP 2017085360
[2020/10]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018198701
Date:01.11.2018
Language:JA
[2018/44]
Type: A1 Application with search report 
No.:EP3618452
Date:04.03.2020
Language:EN
[2020/10]
Type: B1 Patent specification 
No.:EP3618452
Date:09.06.2021
Language:EN
[2021/23]
Search report(s)International search report - published on:JP01.11.2018
(Supplementary) European search report - dispatched on:EP13.02.2020
ClassificationIPC:H04Q9/00, E05F15/71, E05F15/77, E05F15/79, F24F11/52, G06F13/00, G08C17/02
[2020/12]
CPC:
G08C17/02 (EP); F24F11/52 (EP,US); E05F15/71 (EP,US);
E05F15/77 (EP); E05F15/79 (EP); G05B15/02 (US);
G06F13/00 (EP); H04Q9/00 (EP); E05Y2400/45 (US);
E05Y2900/146 (US) (-)
Former IPC [2020/10]H04Q9/00, E05F15/71, E05F15/77, E05F15/79, F24F11/52, G06F13/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/10]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:STEUERUNGSSYSTEM, AUSFÜHRUNGSVERFAHREN FÜR SZENENSTEUERUNG UND PROGRAMM[2020/10]
English:CONTROL SYSTEM, SCENE CONTROL EXECUTION METHOD, AND PROGRAM[2020/52]
French:SYSTÈME DE COMMANDE, PROCÉDÉ D'EXÉCUTION DE COMMANDE DE SCÈNE ET PROGRAMME[2020/10]
Former [2020/10]CONTROL SYSTEM, EXECUTION METHOD OF SCENE CONTROL, AND PROGRAM
Entry into regional phase18.10.2019Translation filed 
18.10.2019National basic fee paid 
18.10.2019Search fee paid 
18.10.2019Designation fee(s) paid 
18.10.2019Examination fee paid 
Examination procedure18.10.2019Examination requested  [2020/10]
08.07.2020Amendment by applicant (claims and/or description)
23.11.2020Communication of intention to grant the patent
17.03.2021Fee for grant paid
17.03.2021Fee for publishing/printing paid
17.03.2021Receipt of the translation of the claim(s)
Opposition(s)10.03.2022No opposition filed within time limit [2022/20]
Fees paidRenewal fee
30.03.2020Renewal fee patent year 03
29.04.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.04.2018
AL09.06.2021
AT09.06.2021
CY09.06.2021
CZ09.06.2021
DK09.06.2021
EE09.06.2021
ES09.06.2021
FI09.06.2021
HR09.06.2021
IT09.06.2021
LT09.06.2021
LV09.06.2021
MC09.06.2021
MK09.06.2021
NL09.06.2021
PL09.06.2021
RO09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
[2024/24]
Former [2024/23]AL09.06.2021
AT09.06.2021
CY09.06.2021
CZ09.06.2021
DK09.06.2021
EE09.06.2021
ES09.06.2021
FI09.06.2021
HR09.06.2021
IT09.06.2021
LT09.06.2021
LV09.06.2021
MC09.06.2021
MK09.06.2021
NL09.06.2021
PL09.06.2021
RO09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
Former [2024/20]AL09.06.2021
AT09.06.2021
CY09.06.2021
CZ09.06.2021
DK09.06.2021
EE09.06.2021
ES09.06.2021
FI09.06.2021
HR09.06.2021
IT09.06.2021
LT09.06.2021
LV09.06.2021
MC09.06.2021
NL09.06.2021
PL09.06.2021
RO09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
Former [2023/06]AL09.06.2021
AT09.06.2021
CZ09.06.2021
DK09.06.2021
EE09.06.2021
ES09.06.2021
FI09.06.2021
HR09.06.2021
IT09.06.2021
LT09.06.2021
LV09.06.2021
MC09.06.2021
NL09.06.2021
PL09.06.2021
RO09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
Former [2022/36]AL09.06.2021
AT09.06.2021
CZ09.06.2021
DK09.06.2021
EE09.06.2021
ES09.06.2021
FI09.06.2021
HR09.06.2021
IT09.06.2021
LT09.06.2021
LV09.06.2021
NL09.06.2021
PL09.06.2021
RO09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
Former [2022/29]AL09.06.2021
AT09.06.2021
CZ09.06.2021
DK09.06.2021
EE09.06.2021
ES09.06.2021
FI09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
NL09.06.2021
PL09.06.2021
RO09.06.2021
RS09.06.2021
SE09.06.2021
SI09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
Former [2022/26]AL09.06.2021
AT09.06.2021
CZ09.06.2021
DK09.06.2021
EE09.06.2021
ES09.06.2021
FI09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
NL09.06.2021
PL09.06.2021
RO09.06.2021
RS09.06.2021
SE09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
Former [2022/21]AT09.06.2021
CZ09.06.2021
DK09.06.2021
EE09.06.2021
ES09.06.2021
FI09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
NL09.06.2021
PL09.06.2021
RO09.06.2021
RS09.06.2021
SE09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
Former [2022/11]AT09.06.2021
CZ09.06.2021
EE09.06.2021
ES09.06.2021
FI09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
NL09.06.2021
PL09.06.2021
RO09.06.2021
RS09.06.2021
SE09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
IS09.10.2021
PT11.10.2021
Former [2022/09]AT09.06.2021
CZ09.06.2021
ES09.06.2021
FI09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
NL09.06.2021
RO09.06.2021
RS09.06.2021
SE09.06.2021
SK09.06.2021
SM09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
PT11.10.2021
Former [2022/08]AT09.06.2021
CZ09.06.2021
ES09.06.2021
FI09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
NL09.06.2021
RS09.06.2021
SE09.06.2021
SM09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
Former [2022/07]AT09.06.2021
FI09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
NL09.06.2021
RS09.06.2021
SE09.06.2021
SM09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
Former [2021/51]FI09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
RS09.06.2021
SE09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
Former [2021/49]FI09.06.2021
HR09.06.2021
LT09.06.2021
LV09.06.2021
SE09.06.2021
BG09.09.2021
NO09.09.2021
GR10.09.2021
Former [2021/46]FI09.06.2021
LT09.06.2021
BG09.09.2021
Documents cited:Search[Y]JPS6080048  (MITSUBISHI HEAVY IND LTD) [Y] 3,4 * paragraph [0001] * * claim 1 *;
 [XY]JP2008191757  (TOHO GAS KK, et al) [X] 1,2,6,7,9-11,14,15 * paragraph [0001] * * paragraph [0004] - paragraph [0007] * * paragraph [0010] * * paragraph [0020] - paragraph [0034] * * paragraph [0040] * * claim 1 * [Y] 3,4,8;
 [X]JP2014174762  (NIPPON TELEGRAPH & TELEPHONE, et al) [X] 1,5-7,9-15 * paragraph [0001] * * paragraph [0004] - paragraph [0015] * * paragraph [0018] - paragraph [0022] * * paragraph [0025] - paragraph [0035] * * paragraph [0040] - paragraph [0042] * * paragraph [0047] - paragraph [0051] * * paragraph [0069] - paragraph [0072] * * paragraph [0075] * * paragraph [0080] - paragraph [0083] * * paragraph [0090] - paragraph [0093] * * paragraph [0097] * * claim 1 *;
 [Y]US2016054017  (TAKAHASHI HAYATO [JP]) [Y] 8 * paragraph [0006] - paragraph [0007] * * paragraph [0010] - paragraph [0015] ** paragraph [0085] - paragraph [0087] *
International search[Y]JPS6080048  (MITSUBISHI HEAVY IND LTD) [Y] 3 * , page 2, upper left column, line 14 to lower right column, line 18, fig. 3-6 (Family: none) *;
 [Y]JP2002173975  (UNITIKA GLASS FIBER CO LTD) [Y] 5 * , paragraphs [0011], [0019] (Family: none) *;
 [XY]JP2008191757  (TOHO GAS KK, et al) [X] 1-2, 6-10, 12, 14-15 * , paragraphs [0021]-[0034], fig. 1-4 (Family: none) * [Y] 3-5, 11, 13;
 [A]JP2010112044  (TOYOTA MOTOR CORP, et al) [A] 1-15* , entire text, all drawings (Family: none) *;
 [Y]JP2011081982  (TOSHIBA CORP) [Y] 4;
 [Y]JP2013223381  (TOYOTA HOME KK) [Y] 13 * , paragraphs [0053]-[0061], fig. 2-3 (Family: none) *;
 [Y]WO2015173931  (MITSUBISHI ELECTRIC CORP [JP]) [Y] 11 * , paragraphs [0010]-[0044], fig. 1-7 (Family: none) *;
 [Y]JP2016225681  (BUNKA SHUTTER) [Y] 4 * , paragraph [0069] (Family: none) *
by applicantJP2015135226
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.