blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3580969

EP3580969 - METHOD AND DEVICE FOR SIGNAL MEASUREMENT [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  16.02.2024
Database last updated on 02.09.2024
FormerExamination is in progress
Status updated on  09.12.2022
FormerRequest for examination was made
Status updated on  15.11.2019
FormerThe international publication has been made
Status updated on  09.11.2018
Most recent event   Tooltip16.02.2024Application deemed to be withdrawnpublished on 20.03.2024  [2024/12]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
[2019/51]
Inventor(s)01 / FAN, Rui
No.5 Lize East Street
Chaoyang District
Beijing 100102 / CN
02 / LI, Shaohua
No.5 Lize East Street
Chaoyang District
Beijing 100102 / CN
 [2019/51]
Representative(s)Valea AB
Box 7086
103 87 Stockholm / SE
[N/P]
Former [2019/51]Ericsson
Patent Development
Torshamnsgatan 21-23
164 80 Stockholm / SE
Application number, filing date18794094.518.04.2018
[2019/51]
WO2018CN83534
Priority number, dateWO2017CN8310204.05.2017         Original published format: PCT/CN2017/083102
[2019/51]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018201893
Date:08.11.2018
Language:EN
[2018/45]
Type: A1 Application with search report 
No.:EP3580969
Date:18.12.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 08.11.2018 takes the place of the publication of the European patent application.
[2019/51]
Search report(s)International search report - published on:CN08.11.2018
(Supplementary) European search report - dispatched on:EP09.02.2021
ClassificationIPC:H04W56/00, H04W48/16, H04W48/08, // H04W36/00, H04W72/04, H04W24/10, H04W24/02
[2020/50]
CPC:
H04W56/00 (EP); H04W56/0015 (EP,US); H04W36/0088 (EP,US);
H04W48/08 (EP); H04W48/16 (EP); H04W56/005 (US);
H04W72/0453 (US); H04W24/02 (EP); H04W24/10 (EP) (-)
Former IPC [2019/51]H04W56/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/51]
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR SIGNALMESSUNG[2019/51]
English:METHOD AND DEVICE FOR SIGNAL MEASUREMENT[2019/51]
French:PROCÉDÉ ET DISPOSITIF DE MESURE DE SIGNAL[2019/51]
Entry into regional phase12.09.2019National basic fee paid 
12.09.2019Search fee paid 
12.09.2019Designation fee(s) paid 
12.09.2019Examination fee paid 
Examination procedure12.09.2019Examination requested  [2019/51]
23.08.2021Amendment by applicant (claims and/or description)
13.12.2022Despatch of a communication from the examining division (Time limit: M04)
12.04.2023Reply to a communication from the examining division
01.11.2023Application deemed to be withdrawn, date of legal effect  [2024/12]
20.11.2023Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2024/12]
Fees paidRenewal fee
27.04.2020Renewal fee patent year 03
27.04.2021Renewal fee patent year 04
27.04.2022Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
30.04.202306   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[I]US2012178465  (LIN SHIANG-JIUN [TW], et al) [I] 1-5,7-12,14,15 * paragraph [0003] - paragraph [0010] * * paragraph [0030] - paragraph [0035] * * paragraph [0043] - paragraph [0047] * * figures 1A-4 *;
 [XI]US2013308481  (KAZMI MUHAMMAD [SE], et al) [X] 1 * paragraph [0019] - paragraph [0067] * * paragraph [0129] - paragraph [0131] * * paragraph [0140] * * paragraph [0169] - paragraph [0174] * * paragraph [0191] - paragraph [0196] * * paragraph [0212] - paragraph [0221] * * paragraph [0224] - paragraph [0253] * * paragraph [0285] - paragraph [0292] * * figures 4,4a,7 * [I] 2-5,7-12,14,15;
 [Y]US2016057708  (SIOMINA IANA [SE], et al) [Y] 1-5,7-12,14,15 * paragraph [0123] - paragraph [0137] * * paragraph [0145] * * paragraph [0186] - paragraph [0201] * * paragraph [0209] - paragraph [0224] * * figures 3,4 *;
 [A]US2016302098  (GHEORGHIU VALENTIN ALEXANDRU [JP], et al) [A] 1-5,7-12,14,15 * paragraph [0005] - paragraph [0014] * * paragraph [0029] - paragraph [0032] * * paragraph [0045] - paragraph [0060] *;
 [Y]  - HUAWEI, "Email discussion [86b-20] on synchronization and carrier rasters for NR", vol. RAN WG1, no. Reno, USA; 20161114 - 20161118, (20161114), 3GPP DRAFT; R1-1611684 EMAIL DISCUSSIONS 86B-20 ON SYNCHRONIZATION AND CARRIER RASTERS FOR NR V5, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-0692, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20161114), XP051176990 [Y] 1-5,7-12,14,15 * paragraph [02.2] - paragraph [02.4] * * Appendix *
 [A]  - HUAWEI ET AL, "Discussion on the RRM impact on flexible bandwidth", vol. RAN WG4, no. Athens, Greece; 20170213 - 20170217, (20170212), 3GPP DRAFT; R4-1701426, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN4/Docs/, (20170212), XP051214454 [A] 1-5,7-12,14,15 * paragraph [002.] *
 [IP]  - ERICSSON, "Configuration of measurement gap in NR", vol. RAN WG2, no. Prague, Czech Republic;, (20170928), 3GPP DRAFT; R2-1711340 - MEASUREMENT GAP CONFIGURATION IN NR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_99bis/Docs/, (20170928), XP051354637 [IP] 1-5,7-12,14,15 * paragraphs [02.2] , [ 2.3] *
International search[X]US2016302098  (GHEORGHIU VALENTIN ALEXANDRU [JP], et al) [X] 1, 7-14, 20-32 * claims 1-14, description, paragraphs [0005]-[0018], [0047]-[0108] and figure 13 *;
 [A]US2017034757  (YANG MING [US], et al) [A] 1-32 * the whole document *;
 [A]WO2016146177  (ERICSSON TELEFON AB L M (PUBL) [SE]) [A] 1-32 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.