EP3553868 - METHOD FOR MANUFACTURING SOLID ELECTROLYTE MEMBRANE FOR ALL SOLID TYPE BATTERY AND SOLID ELECTROLYTE MEMBRANE MANUFACTURED BY THE METHOD [Right-click to bookmark this link] | |||
Former [2019/42] | METHOD FOR MANUFACTURING SOLID ELECTROLYTE MEMBRANE FOR SOLID-STATE BATTERY AND SOLID ELECTROLYTE MEMBRANE MANUFACTURED BY SAME METHOD | ||
[2022/37] | Status | No opposition filed within time limit Status updated on 21.07.2023 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 12.08.2022 | ||
Former | Grant of patent is intended Status updated on 07.06.2022 | ||
Former | Request for examination was made Status updated on 13.09.2019 | ||
Former | The international publication has been made Status updated on 23.11.2018 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states LG Energy Solution, Ltd. Tower 1, 108, Yeoui-daero Yeongdeungpo-gu Seoul 07335 / KR | [2022/13] |
Former [2022/03] | For all designated states LG Energy Solution Ltd. Tower 1, 108 Yeoui-daero Yeongdeungpo-gu 07335 Seoul / KR | ||
Former [2019/42] | For all designated states LG Chem, Ltd. 128 Yeoui-daero Yeongdeungpo-gu Seoul 07336 / KR | Inventor(s) | 01 /
CHO, Sung-Ju LG Chem Research Park 188 Munji-ro Yuseong-gu Daejeon 34122 / KR | 02 /
SHIN, Ho-Suk LG Chem Research Park 188 Munji-ro Yuseong-gu Daejeon 34122 / KR | 03 /
WOO, Seung-He LG Chem Research Park 188 Munji-ro Yuseong-gu Daejeon 34122 / KR | 04 /
KANG, Sung-Joong LG Chem Research Park 188 Munji-ro Yuseong-gu Daejeon 34122 / KR | 05 /
HAN, Hyea-Eun LG Chem Research Park 188 Munji-ro Yuseong-gu Daejeon 34122 / KR | [2019/42] | Representative(s) | Plasseraud IP 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | [2022/37] |
Former [2019/42] | Cabinet Plasseraud 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | Application number, filing date | 18801673.7 | 15.05.2018 | [2019/42] | WO2018KR05570 | Priority number, date | KR20170060063 | 15.05.2017 Original published format: KR 20170060063 | [2019/42] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018212568 | Date: | 22.11.2018 | Language: | KO | [2018/47] | Type: | A1 Application with search report | No.: | EP3553868 | Date: | 16.10.2019 | Language: | EN | [2019/42] | Type: | B1 Patent specification | No.: | EP3553868 | Date: | 14.09.2022 | Language: | EN | [2022/37] | Search report(s) | International search report - published on: | KR | 22.11.2018 | (Supplementary) European search report - dispatched on: | EP | 17.10.2019 | Classification | IPC: | H01M10/0562, H01M10/056, H01M10/0525, H01M50/403, H01M50/40, H01M50/431, H01M50/44, H01M50/443, H01M50/42 | [2022/23] | CPC: |
H01M10/0562 (EP,KR);
H01M10/056 (KR,US);
H01M10/0525 (EP,US);
H01M50/403 (EP,US);
H01M50/414 (KR);
H01M50/42 (EP,US);
H01M50/431 (EP,US);
H01M50/44 (EP,KR);
H01M50/443 (EP,US);
H01M2300/0068 (KR);
H01M50/489 (EP,US);
H01M50/491 (EP,US);
Y02E60/10 (EP,KR)
(-)
|
Former IPC [2019/47] | H01M10/056, H01M10/0562, H01M2/16, H01M2/14, H01M10/0525 | ||
Former IPC [2019/42] | H01M10/056, H01M10/0562, H01M2/16 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG EINER FESTELEKTROLYTMEMBRAN FÜR EINE FESTKÖRPERBATTERIE UND DURCH DIESES VERFAHREN HERGESTELLTE FESTELEKTROLYTMEMBRAN | [2019/42] | English: | METHOD FOR MANUFACTURING SOLID ELECTROLYTE MEMBRANE FOR ALL SOLID TYPE BATTERY AND SOLID ELECTROLYTE MEMBRANE MANUFACTURED BY THE METHOD | [2022/37] | French: | PROCÉDÉ DE FABRICATION D'UNE MEMBRANE ÉLECTROLYTIQUE SOLIDE POUR BATTERIE À ÉLECTROLYTE TOUT SOLIDE ET MEMBRANE ÉLECTROLYTIQUE SOLIDE FABRIQUÉE PAR CE PROCÉDÉ | [2022/37] |
Former [2019/42] | METHOD FOR MANUFACTURING SOLID ELECTROLYTE MEMBRANE FOR SOLID-STATE BATTERY AND SOLID ELECTROLYTE MEMBRANE MANUFACTURED BY SAME METHOD | ||
Former [2019/42] | PROCÉDÉ DE FABRICATION D'UNE MEMBRANE ÉLECTROLYTIQUE SOLIDE POUR BATTERIE À ÉLECTROLYTE SOLIDE ET MEMBRANE ÉLECTROLYTIQUE SOLIDE FABRIQUÉE PAR CE PROCÉDÉ | Entry into regional phase | 10.07.2019 | Translation filed | 10.07.2019 | National basic fee paid | 10.07.2019 | Search fee paid | 10.07.2019 | Designation fee(s) paid | 10.07.2019 | Examination fee paid | Examination procedure | 10.07.2019 | Examination requested [2019/42] | 07.04.2020 | Amendment by applicant (claims and/or description) | 08.06.2022 | Communication of intention to grant the patent | 08.08.2022 | Fee for grant paid | 08.08.2022 | Fee for publishing/printing paid | 08.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 15.06.2023 | No opposition filed within time limit [2023/34] | Fees paid | Renewal fee | 21.05.2020 | Renewal fee patent year 03 | 25.05.2021 | Renewal fee patent year 04 | 24.05.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 14.09.2022 | AT | 14.09.2022 | CZ | 14.09.2022 | DK | 14.09.2022 | EE | 14.09.2022 | ES | 14.09.2022 | FI | 14.09.2022 | HR | 14.09.2022 | IT | 14.09.2022 | LT | 14.09.2022 | LV | 14.09.2022 | MC | 14.09.2022 | NL | 14.09.2022 | PL | 14.09.2022 | RO | 14.09.2022 | RS | 14.09.2022 | SE | 14.09.2022 | SI | 14.09.2022 | SK | 14.09.2022 | SM | 14.09.2022 | NO | 14.12.2022 | GR | 15.12.2022 | IS | 14.01.2023 | PT | 16.01.2023 | IE | 15.05.2023 | LU | 15.05.2023 | BE | 31.05.2023 | CH | 31.05.2023 | LI | 31.05.2023 | [2024/26] |
Former [2024/24] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
IE | 15.05.2023 | ||
LU | 15.05.2023 | ||
BE | 31.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
Former [2024/21] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
IE | 15.05.2023 | ||
LU | 15.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
Former [2024/09] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
LU | 15.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
Former [2024/08] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
LU | 15.05.2023 | ||
Former [2023/37] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/33] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/30] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/29] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/26] | AT | 14.09.2022 | |
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/23] | AT | 14.09.2022 | |
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
PT | 16.01.2023 | ||
Former [2023/22] | AT | 14.09.2022 | |
CZ | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
PT | 16.01.2023 | ||
Former [2023/20] | FI | 14.09.2022 | |
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
Former [2023/10] | FI | 14.09.2022 | |
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
Former [2023/09] | FI | 14.09.2022 | |
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | ||
Former [2023/08] | FI | 14.09.2022 | |
LT | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | Documents cited: | Search | [X]US2014295285 (LEE JOO-SUNG [KR], et al) [X] 1-8 * example all; claims 1-16 *; | [X]KR20150051556 (LG CHEMICAL LTD [KR]) [X] 1-8* paragraphs [0022] - [0024] - [0029] , [0043]; claims 1-13 * | International search | [Y]JP2928551B (JAPAN SYNTHETIC RUBBER CO., LTD.) [Y] 1-8; | [Y]JP2005005024 (NBC INC, et al) [Y] 1-8; | [A]KR20130142224 (KOREA ELECTRONICS TELECOMM [KR], et al)[A] 1-8; | [Y]KR101601511B (HYUNDAI MOTOR CO LTD [KR]) [Y] 1-8; | [A]KR20160068464 (SAMSUNG SDI CO LTD [KR], et al) [A] 1-8 | by applicant | KR20170060063 |