| EP3472717 - METHOD FOR IMPROVING CONTENT FETCHING BY SELECTING TUNNEL DEVICES [Right-click to bookmark this link] | |||
| Former [2019/17] | SYSTEM AND METHOD FOR IMPROVING CONTENT FETCHING BY SELECTING TUNNEL DEVICES | ||
| [2020/39] | Status | Patent revoked Status updated on 22.11.2025 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 30.10.2020 | ||
| Former | Grant of patent is intended Status updated on 29.09.2020 | ||
| Former | Request for examination was made Status updated on 22.03.2019 | ||
| Former | The international publication has been made Status updated on 08.03.2019 | ||
| Former | unknown Status updated on 26.11.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states BRIGHT DATA LTD. 3 Hamahshev St. 42507 Netanya / IL | [N/P] |
| Former [2021/20] | For all designated states BRIGHT DATA LTD 3 Hamahshev St. 42507 Netanya / IL | ||
| Former [2019/17] | For all designated states Luminati Networks Ltd. 3 Hamahshev St. 42507 Netanya / IL | Inventor(s) | 01 /
SHRIBMAN, Derry 9/6 Beylinson St. 6356709 Tel Aviv / IL | 02 /
VILENSKI, Ofer 8 Hahollandim St. 42935 Moshav Hadar Am / IL | [2019/17] | Representative(s) | Becker Kurig & Partner Patentanwälte mbB Bavariastraße 7 80336 München / DE | [N/P] |
| Former [2020/49] | Becker & Kurig Partnerschaft Patentanwälte PartmbB Bavariastrasse 7 80336 München / DE | ||
| Former [2019/17] | Becker Kurig Straus Patentanwälte Bavariastrasse 7 80336 München / DE | Application number, filing date | 18803304.7 | 16.08.2018 | [2019/17] | WO2018IL50910 | Priority number, date | US201762550834P | 28.08.2017 Original published format: US 201762550834 P | US201762563157P | 26.09.2017 Original published format: US 201762563157 P | US201862624208P | 31.01.2018 Original published format: US 201862624208 P | US201862684211P | 13.06.2018 Original published format: US 201862684211 P | [2019/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2019043687 | Date: | 07.03.2019 | Language: | EN | [2019/10] | Type: | A2 Application without search report | No.: | EP3472717 | Date: | 24.04.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.03.2019 takes the place of the publication of the European patent application. | [2019/17] | Type: | B1 Patent specification | No.: | EP3472717 | Date: | 02.12.2020 | Language: | EN | [2020/49] | Search report(s) | International search report - published on: | US | 20.06.2019 | (Supplementary) European search report - dispatched on: | EP | 29.05.2020 | Classification | IPC: | G06F16/9538, H04L12/46, H04L29/12, H04L29/08 | [2020/27] | CPC: |
H04L67/02 (EP,US);
G06F16/955 (US);
G06F7/58 (US);
G06F7/588 (US);
G06F8/71 (US);
G06F9/45545 (US);
G06F9/4555 (US);
G06F9/4881 (US);
H04L12/2803 (US);
H04L12/2856 (US);
H04L12/4633 (US);
H04L47/283 (US);
H04L61/256 (US);
H04L61/2575 (EP,US);
H04L61/2585 (US);
H04L61/2589 (EP,US);
H04L61/2592 (US);
H04L61/4511 (US);
H04L61/5007 (US);
H04L63/0272 (EP,US);
H04L63/0281 (US);
H04L63/029 (US);
H04L63/164 (EP,US);
H04L67/01 (US);
H04L67/025 (US);
H04L67/1008 (EP,US);
H04L67/1021 (EP,US);
H04L67/133 (US);
H04L67/141 (US);
H04L67/142 (US);
H04L67/288 (EP,US);
H04L67/2885 (US);
H04L67/56 (US);
H04L67/563 (EP,US);
H04L67/567 (EP);
H04L67/568 (US);
H04L67/5681 (US);
H04L67/63 (US);
H04L69/16 (US);
H04L69/162 (EP,US);
H04L69/167 (US);
H04L69/168 (US);
H04W4/80 (US);
H04W48/18 (US);
H04W84/10 (US);
H04W84/18 (US);
G06F2009/45591 (US);
G06F2009/45595 (US);
G06F9/45558 (US);
H04L2101/69 (US);
H04L61/2514 (EP);
H04L61/2553 (EP);
H04L69/325 (EP,US);
H04L69/326 (EP,US);
|
| Former IPC [2019/17] | G06F16/9538 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/17] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR VERBESSERUNG DES ABRUFENS VON INHALT DURCH AUSWAHL VON TUNNELVORRICHTUNGEN | [2020/39] | English: | METHOD FOR IMPROVING CONTENT FETCHING BY SELECTING TUNNEL DEVICES | [2020/39] | French: | PROCÉDÉ POUR AMÉLIORER L'EXTRACTION DE CONTENU PAR SÉLECTION DE DISPOSITIFS TUNNEL | [2020/39] |
| Former [2019/17] | SYSTEM UND VERFAHREN ZUR VERBESSERUNG DES ABRUFENS VON INHALT DURCH AUSWAHL VON TUNNELVORRICHTUNGEN | ||
| Former [2019/17] | SYSTEM AND METHOD FOR IMPROVING CONTENT FETCHING BY SELECTING TUNNEL DEVICES | ||
| Former [2019/17] | SYSTÈME ET PROCÉDÉ POUR AMÉLIORER L'EXTRACTION DE CONTENU PAR SÉLECTION DE DISPOSITIFS TUNNEL | Entry into regional phase | 26.11.2018 | National basic fee paid | 26.11.2018 | Search fee paid | 26.11.2018 | Designation fee(s) paid | 26.11.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 26.11.2018 | Examination requested [2019/17] | 02.03.2020 | Observations by third parties | 14.07.2020 | Amendment by applicant (claims and/or description) | 30.09.2020 | Communication of intention to grant the patent | 27.10.2020 | Fee for grant paid | 27.10.2020 | Fee for publishing/printing paid | 27.10.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20187834.5 / EP3761613 | EP20187847.7 / EP3767493 | EP20187859.2 / EP3767494 | EP20187868.3 / EP3767495 | EP20190259.0 / EP3770773 | EP20190267.3 / EP3754520 | EP20200546.8 / EP3805958 | EP22150165.3 / EP3998538 | EP22150176.0 / EP4002810 | EP22150635.5 / EP4002163 | EP22156771.2 / EP4020258 | EP22157000.5 / EP4020940 | EP22215264.7 / EP4191980 | EP22215332.2 / EP4184896 | EP22215749.7 / EP4199479 | EP22215773.7 / EP4191981 | EP22215951.9 / EP4187881 | EP23212983.3 / EP4311204 | EP23216124.0 / EP4319104 | EP25203590.2 / EP4648362 | EP25213300.4 / EP4676000 | EP25213838.3 / EP4694083 | EP25218991.5 / EP4679779 | EP25223716.9 / EP4697673 | EP26154019.9 / EP4712438 | EP26156235.9 | EP26167216.6 | Opposition(s) | Opponent(s) | 01
11.12.2020
17.12.2020
ADMISSIBLE oxylabs, UAB Svitrigailos g. 32 03230 Vilnius / LT Opponent's representative Meissner Bolte Partnerschaft mbB Patentanwälte Rechtsanwälte Postfach 86 06 24 81633 München / DE | [N/P] |
| Former [2023/14] | |||
| Opponent(s) | 01
11.12.2020
17.12.2020
ADMISSIBLE oxylabs, UAB Svitrigailos g. 32 03230 Vilnius / LT Opponent's representative Meissner Bolte Partnerschaft mbB Widenmayerstrasse 47 80538 München / DE | ||
| Former [2021/03] | |||
| Opponent(s) | 01
11.12.2020
17.12.2020
ADMISSIBLE Teso LT, UAB A. Gostauto g. 40A 03163 Vilnius / LT Opponent's representative Meissner Bolte Partnerschaft mbB Widenmayerstrasse 47 80538 München / DE | deleted | Deletion: Legal effect of rejection of opposition [ N /P ] | 16.09.2021 | Invitation to proprietor to file observations on the notice of opposition | 23.12.2021 | Reply of patent proprietor to notice(s) of opposition | 10.11.2022 | Date of oral proceedings | 05.01.2023 | Despatch of minutes of oral proceedings | 05.01.2023 | Date of despatch of rejection of opposition | 09.10.2025 | Legal effect of revocation of patent [2026/01] | 14.11.2025 | Despatch of communication that the patent will be revoked | Appeal following opposition | 28.02.2023 | Appeal received No. T0423/23 | 28.02.2023 | Payment of appeal fee | 15.05.2023 | Statement of grounds filed | 09.10.2025 | Result of appeal procedure: revocation of the patent | 14.11.2025 | Despatch of the decision of the Board of Appeal | 09.10.2025 | Date of oral proceedings | Fees paid | Renewal fee | 20.08.2020 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.08.2018 | AL | 02.12.2020 | AT | 02.12.2020 | CY | 02.12.2020 | CZ | 02.12.2020 | DK | 02.12.2020 | EE | 02.12.2020 | ES | 02.12.2020 | FI | 02.12.2020 | HR | 02.12.2020 | IT | 02.12.2020 | LV | 02.12.2020 | MC | 02.12.2020 | MK | 02.12.2020 | MT | 02.12.2020 | PL | 02.12.2020 | RO | 02.12.2020 | RS | 02.12.2020 | SE | 02.12.2020 | SI | 02.12.2020 | SK | 02.12.2020 | SM | 02.12.2020 | TR | 02.12.2020 | BG | 02.03.2021 | NO | 02.03.2021 | GR | 03.03.2021 | IS | 02.04.2021 | PT | 05.04.2021 | IE | 16.08.2021 | LU | 16.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | LI | 31.08.2021 | [2026/04] |
| Former [2024/42] | HU | 16.08.2018 | |
| AL | 02.12.2020 | ||
| AT | 02.12.2020 | ||
| CY | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| DK | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| ES | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| MC | 02.12.2020 | ||
| MK | 02.12.2020 | ||
| MT | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SI | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| IS | 02.04.2021 | ||
| PT | 05.04.2021 | ||
| IE | 16.08.2021 | ||
| LU | 16.08.2021 | ||
| BE | 31.08.2021 | ||
| CH | 31.08.2021 | ||
| LI | 31.08.2021 | ||
| Former [2024/23] | HU | 16.08.2018 | |
| AL | 02.12.2020 | ||
| AT | 02.12.2020 | ||
| CY | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| DK | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| ES | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| MC | 02.12.2020 | ||
| MK | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SI | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| IS | 02.04.2021 | ||
| PT | 05.04.2021 | ||
| IE | 16.08.2021 | ||
| LU | 16.08.2021 | ||
| BE | 31.08.2021 | ||
| CH | 31.08.2021 | ||
| LI | 31.08.2021 | ||
| Former [2023/33] | HU | 16.08.2018 | |
| AL | 02.12.2020 | ||
| AT | 02.12.2020 | ||
| CY | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| DK | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| ES | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| MC | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SI | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| IS | 02.04.2021 | ||
| PT | 05.04.2021 | ||
| IE | 16.08.2021 | ||
| LU | 16.08.2021 | ||
| BE | 31.08.2021 | ||
| CH | 31.08.2021 | ||
| LI | 31.08.2021 | ||
| Former [2023/30] | AL | 02.12.2020 | |
| AT | 02.12.2020 | ||
| CY | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| DK | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| ES | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| MC | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SI | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| IS | 02.04.2021 | ||
| PT | 05.04.2021 | ||
| IE | 16.08.2021 | ||
| LU | 16.08.2021 | ||
| BE | 31.08.2021 | ||
| CH | 31.08.2021 | ||
| LI | 31.08.2021 | ||
| Former [2022/35] | AL | 02.12.2020 | |
| AT | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| DK | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| ES | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| MC | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SI | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| IS | 02.04.2021 | ||
| PT | 05.04.2021 | ||
| IE | 16.08.2021 | ||
| LU | 16.08.2021 | ||
| BE | 31.08.2021 | ||
| CH | 31.08.2021 | ||
| LI | 31.08.2021 | ||
| Former [2022/34] | AL | 02.12.2020 | |
| AT | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| DK | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| ES | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| MC | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SI | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| IS | 02.04.2021 | ||
| PT | 05.04.2021 | ||
| LU | 16.08.2021 | ||
| BE | 31.08.2021 | ||
| CH | 31.08.2021 | ||
| LI | 31.08.2021 | ||
| Former [2022/23] | AL | 02.12.2020 | |
| AT | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| DK | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| ES | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| MC | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SI | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| IS | 02.04.2021 | ||
| PT | 05.04.2021 | ||
| LU | 16.08.2021 | ||
| CH | 31.08.2021 | ||
| LI | 31.08.2021 | ||
| Former [2022/21] | AL | 02.12.2020 | |
| AT | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| DK | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| ES | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| MC | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SI | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| PT | 05.04.2021 | ||
| CH | 31.08.2021 | ||
| LI | 31.08.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/18] | AL | 02.12.2020 | |
| AT | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| DK | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| ES | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| MC | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SI | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| PT | 05.04.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/10] | AL | 02.12.2020 | |
| AT | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| DK | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| ES | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SI | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| PT | 05.04.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/08] | AL | 02.12.2020 | |
| AT | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| DK | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| ES | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SI | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| IS | 02.04.2021 | ||
| PT | 05.04.2021 | ||
| Former [2021/49] | AL | 02.12.2020 | |
| AT | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| DK | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SI | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| IS | 02.04.2021 | ||
| PT | 05.04.2021 | ||
| Former [2021/48] | AL | 02.12.2020 | |
| AT | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| IT | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| IS | 02.04.2021 | ||
| PT | 05.04.2021 | ||
| Former [2021/45] | AL | 02.12.2020 | |
| AT | 02.12.2020 | ||
| CZ | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| IS | 02.04.2021 | ||
| PT | 05.04.2021 | ||
| Former [2021/42] | AT | 02.12.2020 | |
| CZ | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| IS | 02.04.2021 | ||
| PT | 05.04.2021 | ||
| Former [2021/37] | AT | 02.12.2020 | |
| CZ | 02.12.2020 | ||
| EE | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| PT | 05.04.2021 | ||
| Former [2021/36] | CZ | 02.12.2020 | |
| EE | 02.12.2020 | ||
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| PT | 05.04.2021 | ||
| Former [2021/35] | CZ | 02.12.2020 | |
| FI | 02.12.2020 | ||
| HR | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RO | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SK | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| PT | 05.04.2021 | ||
| Former [2021/33] | FI | 02.12.2020 | |
| HR | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| PT | 05.04.2021 | ||
| Former [2021/32] | FI | 02.12.2020 | |
| HR | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| SM | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| Former [2021/28] | FI | 02.12.2020 | |
| HR | 02.12.2020 | ||
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| Former [2021/25] | FI | 02.12.2020 | |
| LV | 02.12.2020 | ||
| PL | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| Former [2021/23] | FI | 02.12.2020 | |
| LV | 02.12.2020 | ||
| RS | 02.12.2020 | ||
| SE | 02.12.2020 | ||
| BG | 02.03.2021 | ||
| NO | 02.03.2021 | ||
| GR | 03.03.2021 | ||
| Former [2021/22] | FI | 02.12.2020 | |
| RS | 02.12.2020 | ||
| NO | 02.03.2021 | ||
| Former [2021/20] | FI | 02.12.2020 | Documents cited: | Search | [IA] US2016352628 (REDDY K TIRUMALESWAR et al.) | [A] US2016105530 (SHRIBMAN DERRY et al.) | International search | [A] US2016105530 (SHRIBMAN DERRY et al.) [A] 1-75 * ; the entire document * | [A] EP2922275 (AXIS AB et al.) [A] 1-75 * ; the entire document * | [A] US2007050522 (GROVE ADAM J et al.) [A] 1-75 * ; the entire document * | by applicant | US2016352628 | US3962539 | US4405829 | US7124157 | US4905176 | US4853884 | US7145933 | US8560604 | US2012166582 | US8135912 | US8671221 | US7865585 | US7203741 | US2014159877 | US2014070613 | US2015373443 | US2015277559 | US2015349556 | US8948832 | US8957988 | US2015341901 | US2007052672 | US2014045547 | US7605714 | US8508472 | US2006164383 | US2012050144 | US2010110368 | US2012050668 | US2013169513 | US9241044 | US2016337426 | US9378473 | US2015163087 | US7929535 | US6236652 | US2005018645 | US9660895 | US8302161 | US8301787 | US5961593 | US8504723 | US7565450 | US7162539 | US2006212584 | US2013191456 | US7440994 | US7562112 | US7853795 | US7027418 | US9244682 | US7716985 | US5578755 | US5962786 | US7617729 | US6670212 | US7892876 | US7326866 | US7774155 | US201762550834 | US201762563157 | US201862624208 | US201862684211 | "Internetworking Technologies Handbook", 2001, CISCO SYSTEMS, INC., article "Ethernet Technologies", pages: 5-1 - 5-10 | "LAN91C111 10/100 Non-PCI Ethernet Single Chip MAC + PHY", DATA-SHEET, REV., vol. 15 | ROBERT D. DOVERSPIKEK.K. RAMAKRISHNANCHRIS CHASE: "Guide to Reliable Internet Services and Applications", 2010, article "Structural Overview of ISP Networks" | "Local area Network Concepts and Products: LAN Operation Systems and managemen", May 1996, pages: 51-1 - 51-12 | "Introduction to Networking Technologies", April 1994 | "IP Network Design Guide", June 1999 | "TCP/IP Tutorial and Technical Overview", December 2006 | "Hypertext Transfer Protocol --HTTP/1.1", IETF RFC 2616 | "Textual Representation of Autonomous System (AS) Numbers", IETF 5396, December 2008 (2008-12-01) | "BGP Support for Four-Octet Autonomous System (AS) Number Space", IETF RFC 6793, December 2012 (2012-12-01) | CARLES GOMEZ ET AL., OVERVIEW AND EVALUATION OF BLUETOOTH LOW ENERGY: AN EMERGING LOW-POWER WIRELESS TECHNOLOGY, vol. 12, 2012, pages 11734 - 11753 | UNIX TUTORIAL, July 2014 (2014-07-01) | "Geolocation: Risk, Issues and Strategies", 2011, INFORMATION SYSTEMS AUDIT AND CONTROL ASSOCIATION (ISACA | "R8C Family - General RTOS Concepts", January 2010, RENESAS TECHNOLOGY CORP. | "JAJA Technologfy Review", February 2007, THE ASSOCIATION FOR LABORATORY AUTOMATION | AN OVERVIEW OF REAL-TIME OPERATING SYSTEMS | "Power Systems - Introduction to virtualization", 2009, SPRINGER SCIENCE | HARDWARE-DEPENDENT SOFTWARE - PRINCIPLES AND PRACTICE | NICOLAS MELOT: "Study of an operating system: FreeRTOS - Operating systems for embedded devices", July 2015 | DR. RICHARD WALL, CAREBOT PIC32 MX7CK IMPLEMENTATION OF FREE RTOS, 23 September 2013 (2013-09-23) | FREERTOSTM MODULES, 26 November 2006 (2006-11-26), Retrieved from the Internet | RICH GOYETTE: "SYSC5701: Operating System Methods for Real-Time Applications", 1 April 2007, CARLETON UNIVERSITY, article "An Analysis and Description of the Inner Workings of the FreeRTOS Kerner" | "Galaxy S6 Edge - Technical Specification", October 2015, APPLE INC. | ANDROID TUTORIAR, July 2014 (2014-07-01), Retrieved from the Internet | IOS TUTORIAL, July 2014 (2014-07-01), Retrieved from the Internet | MOHAMAD (HANI) ATASSY: "Microsoft Windows Driver Model (WDM)", 28 January 2002, DR. DENNIS R. HAFERMANN | DEVICE DRIVERS, FEATURES, AND COMMANDS ON RED HAT EXTERPRISE LINUX 6.3, July 2014 (2014-07-01) | DAN KEGEL, PEER-TO-PEER COMMUNICATION ACROSS NETWORK ADDRESS TRANSLATORS, 2008 | PETER JAY SALZMANMICHAEL BURIANORI POMERANTZ, THE LINUX KERNEL MODULE PROGRAMMING GUIDE, 18 May 2007 (2007-05-18) | YONG WANG, TOWARDS STREET-LEVEL CLIENT-INDEPENDENT IP GEOLOCATION, July 2014 (2014-07-01) | ALAN GROSSKURTHMICHAEL W. GODFREY: "Architecture and evolution of the modern web browser", 20 June 2006, UNIVERSITY OF WATERLOO | STEP BY STEP TUTORIALS FOR MICROSOFT INTERNET EXPLORER 8 ACCESSIBILITY OPTIONS | SAFARI WEB CONTENT GUIDE, March 2014 (2014-03-01) | GUSTAVO ALESSANDRO ANDRADE SANTANA: "Cloud Computing and Virtualization", 2014, FACULTY OF INFORMATION TECHNOLOGY, article "Data Center Virtualization Fundamentals" | "IBM RedBook", June 2013, IBM CORPORATION, article "IBM PowerVM Virtualization - Introduction and Configuration" | KARN, PHILCRAIG PARTRIDGE: "Improving Round-Trip Time Estimates in Reliable Transport Protocols", ACM SIGCOMM '87 - COMPUTER COMMUNICATION REVIEW, pages 19-1 - 19-30 | "WiFi Technology", July 2003, TELECOM REGULATORY AUTHORITY | "Point-to-Point Tunneling Protocol (PPTP)", IETF RFC 2637 | "Layer Two Tunneling Protocol ''L2TP", IETF RFC 2661 | "IP Tunneling and VPNs", 2001, CISCO SYSTEMS, INC. | "A Comprehensive Guide to Virtual Private Networks", vol. I, June 1998, IBM FIREWALL, article "Server and Client Solutions" | IBM NWAYS ROUTER SOLUTIONS, vol. II, November 1999 (1999-11-01) | CROSS-PLATFORM KEY AND POLICY MANAGEMENT, vol. III, November 1999 (1999-11-01) | "Provider Provisioned Virtual Private Network (VPN) Terminology", IETF RFC 4026 | "A Framework for IP Based Virtual Private Networks", IETF RFC 2764 | "Layer Two Tunneling Protocol - Version 3 (L2TPv3)", IETF RFC 3931 | "BGP/MPLS VPNs", IETF RFC 2547 | "SOCKS Protocol Version 5", RFC 1928, March 1996 (1996-03-01) | "Username/Password Authentication for SOCKS V5", SOCKS VERSION 5 RFC 1929, March 1996 (1996-03-01) | "GSS-API Authentication Method for SOCKS Version 5", SOCKS VERSION 5. RFC 1961, June 1996 (1996-06-01) | "A SOCKS-based IPv6/IPv4 Gateway Mechanism", RFC 3089, April 2001 (2001-04-01) | "The WebSocket Protocor", RFC 6455, December 2011 (2011-12-01) | "IP Network Address Translator (NAT) Terminology and Considerations", IETF RFC 2663, August 1999 (1999-08-01) | "IPsec-Network Address Translation (NAT) Compatibility Requirements", IETF RFC 3715, March 2004 (2004-03-01) | "Negotiation of NAT-Traversal in the IKE", IETF RFC 3947, January 2005 (2005-01-01) | "State of Peer-to-Peer (P2P) Communication across Network Address Translators (NATs)", IETF RFC 5128, March 2008 (2008-03-01) | "Interactive Connectivity Establishment (ICE): A Protocol for Network Address Translator (NAT) Traversal for Offer/Answer Protocols", IETF RFC 5245, April 2010 (2010-04-01) | "Session Traversal Utilities for NAT (STUN)", IETF RFC 5389, October 2008 (2008-10-01) | "Datagram Transport Layer Security (DTLS) as Transport for Session Traversal Utilities for NAT (STUN)", IETF RFC 7350, August 2014 (2014-08-01) | HUYNH CONG PHUOCRAY HUNTANDREW MCKENZIE: "NAT Traversal Techniques in Peer-to-Peer Networks", January 2008, UNIVERSITY OF CANTERBURY | "Oracle Sharding: Linear Scalability, Fault Isolation and Geo-distribution for Web-scale OLTP Applications", April 2017, ORACLE CORPORATION | "Sharding and MongoDB", 12 January 2015, MONGODB DOCUMENTATION PROJECT | "IPv6 Multihoming without Network Address Translation", IETF RFC 7157, March 2014 (2014-03-01) | "Role of the Domain Name System (DNS)", IETF RFC 3467 | "Domain Name System (DNS) IANA Considerations", IETF RFC 6195 | "Domain Name System Structure and Delegation", IETF RFC 1591 | "Master Table of Contents & Compliance Requirements - Specification Volume 0", vol. 0, 2 December 2014, BLUETOOTH SIG | "SimpleLinkTM Ultra-Low Power - Wireless Microcontroller Platform", TEXAS INSTRUMENT 2015 PUBLICATION # SWRT022 | "CC2650 SimpleLinkTM Multistandard Wireless MCU", TEXAS INSTRUMENT 2015 DATASHEET # SWRS158A, February 2015 (2015-02-01) | JUN WANGWEI LIUSANJIV KUMARSHIH-FU CHANG: "Learning to Hash for Indexing Big Data - A Survey", PROCEEDINGS OF THE IEEE, 17 September 2015 (2015-09-17), Retrieved from the Internet | JOSEF PIEPRZYKBABAK SADEGHIYAN: "Design of Hashing Algorithms", 1993, SPRINGER-VERLAG | "US Secure Hash Algorithms (SHA and HMAC-SHA)", IETF RFC 4634, July 2006 (2006-07-01) | "A 224-bit One-way Hash Function: SHA-224", IETF RFC 3874, September 2004 (2004-09-01) | DOXA CHATZOPOULOUMARIOS KOKKODIS: "IP Geolocation", COMPUTER SCIENCE AND ENGINEERING DEPARTMENT, UC RIVERSIDE, January 2007 (2007-01-01) | JAYAPRABHA BENDALEPROF. J. RATANARAJ KUMAR: "UCSIT) International Journal of Computer Science and Information Technologies", vol. 5, 2014, G.S. MOZE COLLEGE OF ENGINEERING, article "Review of Different IP Geolocation Methods and Concepts", pages: 436 - 440 | "Dissecting SSL handshake", MAREK'S - TOTALLY NOT INSANE - IDEA OF THE DAY, 16 June 2012 (2012-06-16) | "Examining SSL-encrypted Communications", vol. 2-10, 2010, NETRONOME SYSTEMS, INC. | "MEMS motion sensor 3-axis - 2g/+8g smart digital output ''piccolo'' accelerometer", DATA-SHEET LIS302DL STMICROELECTRONICS NV, 4 October 2008 (2008-10-04) | DATASHEET SQ-SEN-200 OMNIDIRECTIONAL TILT AND VIBRATION SENSOR, 3 August 2009 (2009-08-03) | "Standard for Information Technology - Portable Operating System Interface (POSIX(R)) Description", IEEE STD. 1003.I, 2008 | "The Open Group Technical Standard Base Specifications", IEEE STD. L003.1, vol. 7, 2013 | Opposition | WO2019043687 | EP2863607 | US9380028 | "Definition of enable", MERRIAN WEBSTER DICTIONARY, 2020, XP055762607 * MB 5a: Printout of the Merrian Webster Dictionary * | "unable verb", OXFORD LEARNERS DICTIONARY * MB6a: Printout of the Oxford Learners Dictionary * | "use", OXFORD LEARNERS DICTIONARY | TAEJOONG CHUNG ; DAVID CHOFFNES ; ALAN MISLOVE: "Tunneling for Transparency", INTERNET MEASUREMENT CONFERENCE, ACM, 2 PENN PLAZA, SUITE 701 NEW YORK NY 10121-0701 USA, 14 November 2016 (2016-11-14) - 16 November 2016 (2016-11-16), 2 Penn Plaza, Suite 701 New York NY 10121-0701 USA, pages 199 - 213, XP058306543, ISBN: 978-1-4503-4526-2, DOI: 10.1145/2987443.2987455 * MB6a: Printout of the Oxford Learners Dictionary * DOI: http://dx.doi.org/10.1145/2987443.2987455 |