EP3874144 - METHOD FOR INSTALLING AND RETAINING A BUSHING IN A BEARING BLOCK OF A ROTOR BLADE JOINT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.06.2024 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 30.06.2023 | ||
Former | Grant of patent is intended Status updated on 22.02.2023 | ||
Former | Request for examination was made Status updated on 24.01.2023 | ||
Former | Grant of patent is intended Status updated on 29.11.2022 | ||
Former | Request for examination was made Status updated on 06.08.2021 | ||
Former | The international publication has been made Status updated on 09.05.2020 | ||
Former | unknown Status updated on 01.12.2018 | Most recent event Tooltip | 19.07.2024 | Lapse of the patent in a contracting state New state(s): CH, LU | published on 21.08.2024 [2024/34] | Applicant(s) | For all designated states General Electric Renovables España, S.L. Calle Roc Boronat 78 08005 Barcelona / ES | [2023/50] |
Former [2021/36] | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | Inventor(s) | 01 /
AGARWAL, Rohit c/o General Electric Company 300 Garlington Road Greenville, South Carolina 29615 / US | 02 /
RODWELL, Andrew Mitchell c/o General Electric Company 300 Garlington Road Greenville, South Carolina 29615 / US | 03 /
RIAHI, Amir c/o General Electric Company 300 Garlington Road Greenville, South Carolina 29615 / US | 04 /
ATTIA, Mohammad Salah c/o General Electric Company 1 Research Circle Niskayuna, New York 12309 / US | 05 /
KASPERSKI, Donald Joseph c/o General Electric Company 300 Garlington Road Greenville, South Carolina 29615 / US | 06 /
CHEN, Jianqiang c/o General Electric Company 300 Garlington Road Greenville, South Carolina 29615 / US | [2021/36] | Representative(s) | COPA Copenhagen Patents Rosenørns Allé 1, 2nd floor 1970 Frederiksberg C / DK | [2021/36] | Application number, filing date | 18804826.8 | 01.11.2018 | [2021/36] | WO2018US58699 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020091790 | Date: | 07.05.2020 | Language: | EN | [2020/19] | Type: | A1 Application with search report | No.: | EP3874144 | Date: | 08.09.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.05.2020 takes the place of the publication of the European patent application. | [2021/36] | Type: | B1 Patent specification | No.: | EP3874144 | Date: | 02.08.2023 | Language: | EN | [2023/31] | Search report(s) | International search report - published on: | EP | 07.05.2020 | Classification | IPC: | F03D1/06 | [2021/36] | CPC: |
F03D1/0675 (EP,US);
F03D13/00 (US);
F05B2230/60 (EP);
F05B2230/604 (US);
F05B2240/302 (EP,US);
F05B2240/307 (US);
F05B2260/30 (US);
F05B2260/301 (EP);
F05B2280/6003 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | 29.04.2021 | Title | German: | VERFAHREN ZUR MONTAGE UND HALTERUNG EINER BUCHSE IN EINEM LAGERBOCK EINER ROTORBLATTVERBINDUNG | [2021/36] | English: | METHOD FOR INSTALLING AND RETAINING A BUSHING IN A BEARING BLOCK OF A ROTOR BLADE JOINT | [2021/36] | French: | PROCÉDÉ D'INSTALLATION ET DE RETENUE D'UNE BAGUE DANS UN BLOC DE PALIER D'UN JOINT DE PALE DE ROTOR | [2021/36] | Entry into regional phase | 29.04.2021 | National basic fee paid | 29.04.2021 | Designation fee(s) paid | 29.04.2021 | Examination fee paid | Examination procedure | 29.04.2021 | Examination requested [2021/36] | 29.04.2021 | Date on which the examining division has become responsible | 30.11.2021 | Amendment by applicant (claims and/or description) | 30.11.2022 | Communication of intention to grant the patent | 24.01.2023 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 23.02.2023 | Communication of intention to grant the patent | 21.06.2023 | Fee for grant paid | 21.06.2023 | Fee for publishing/printing paid | 21.06.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 03.05.2024 | No opposition filed within time limit [2024/28] | Fees paid | Renewal fee | 29.04.2021 | Renewal fee patent year 03 | 18.11.2021 | Renewal fee patent year 04 | 22.11.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 02.08.2023 | CZ | 02.08.2023 | DK | 02.08.2023 | EE | 02.08.2023 | ES | 02.08.2023 | FI | 02.08.2023 | HR | 02.08.2023 | IT | 02.08.2023 | LT | 02.08.2023 | LV | 02.08.2023 | MC | 02.08.2023 | NL | 02.08.2023 | PL | 02.08.2023 | RO | 02.08.2023 | RS | 02.08.2023 | SE | 02.08.2023 | SK | 02.08.2023 | SM | 02.08.2023 | LU | 01.11.2023 | NO | 02.11.2023 | GR | 03.11.2023 | CH | 30.11.2023 | IS | 02.12.2023 | PT | 04.12.2023 | [2024/34] |
Former [2024/32] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
ES | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
IT | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
MC | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/26] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
ES | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
IT | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/23] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
EE | 02.08.2023 | ||
ES | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SK | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/22] | AT | 02.08.2023 | |
CZ | 02.08.2023 | ||
DK | 02.08.2023 | ||
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RO | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/20] | AT | 02.08.2023 | |
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
SM | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/10] | AT | 02.08.2023 | |
FI | 02.08.2023 | ||
HR | 02.08.2023 | ||
LT | 02.08.2023 | ||
LV | 02.08.2023 | ||
NL | 02.08.2023 | ||
PL | 02.08.2023 | ||
RS | 02.08.2023 | ||
SE | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
PT | 04.12.2023 | ||
Former [2024/09] | AT | 02.08.2023 | |
FI | 02.08.2023 | ||
LT | 02.08.2023 | ||
NL | 02.08.2023 | ||
SE | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | ||
IS | 02.12.2023 | ||
Former [2024/08] | LT | 02.08.2023 | |
NL | 02.08.2023 | ||
NO | 02.11.2023 | ||
GR | 03.11.2023 | Cited in | International search | [I]US2012269643 (HIBBARD PAUL [GB], et al) [I] 1-7,10-14 * figures 14, 15 * * paragraph [0095] *; | [Y]US2016195060 (AKHTAR AFROZ [IN], et al) [Y] 1-16 * figures 2-4, 5B, 5D * * paragraphs [0032] , [0033] *; | [XI]US2017268482 (BEYLAND LUTZ [DE], et al) [X] 1,2,6,7,10,11,14 * figures 1, 2 * * paragraph [0054] * [I] 3-5,8,9,12,13,15,16; | [Y]US2017362945 (FEIGL LUCA [ES]) [Y] 17-20 * figures 2, 3 * * paragraph [0032] *; | [Y]US2018051672 (MERZHAEUSER THOMAS [DE], et al) [Y] 1-20 * figures 1, 2, 4-6 * * paragraphs [0049] - [0054] *; | [E]EP3425195 (NORDEX ENERGY GMBH [DE]) [E] 1,2,4,6,7,10,11,13,14,17-20 * figures 1, 2, 9, 10 ** paragraphs [0025] , [0042] - [0044] * |