blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3694805

EP3694805 - GRIP AND BLOCK SYSTEM FOR A FORKLIFT TRUCK AND RELATED FORKLIFT TRUCK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  07.10.2022
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  29.10.2021
FormerGrant of patent is intended
Status updated on  16.06.2021
FormerRequest for examination was made
Status updated on  17.07.2020
FormerThe international publication has been made
Status updated on  19.04.2019
Formerunknown
Status updated on  15.12.2018
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
Anty S.r.l.
Via dei Gladioli n.6
70026 Modugno (Bari) / IT
[2020/34]
Inventor(s)01 / FINIZIO, Giampiero
Via L.B. Alberti 4
70010 Casamassima (BA) / IT
 [2020/34]
Representative(s)Di Bernardo, Antonio, et al
Thinx S.r.l.
P.le Luigi Cadorna, 10
20123 Milano / IT
[2020/34]
Application number, filing date18812316.011.10.2018
[2020/34]
WO2018IT00128
Priority number, dateIT2017011531312.10.2017         Original published format: IT201700115313
[2020/34]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019073498
Date:18.04.2019
Language:EN
[2019/16]
Type: A1 Application with search report 
No.:EP3694805
Date:19.08.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 18.04.2019 takes the place of the publication of the European patent application.
[2020/34]
Type: B1 Patent specification 
No.:EP3694805
Date:01.12.2021
Language:EN
[2021/48]
Search report(s)International search report - published on:EP18.04.2019
ClassificationIPC:B66F9/18
[2020/34]
CPC:
B66F9/18 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/34]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:GREIF- UND BLOCKSYSTEM FÜR GABELSTAPLER UND ZUGEHÖRIGER GABELSTAPLER[2020/34]
English:GRIP AND BLOCK SYSTEM FOR A FORKLIFT TRUCK AND RELATED FORKLIFT TRUCK[2020/34]
French:SYSTÈME DE PRÉHENSION ET DE BLOCAGE POUR UN CHARIOT ÉLÉVATEUR À FOURCHE ET CHARIOT ÉLÉVATEUR À FOURCHE ASSOCIÉ[2020/34]
Entry into regional phase07.05.2020National basic fee paid 
07.05.2020Designation fee(s) paid 
07.05.2020Examination fee paid 
Examination procedure07.05.2020Examination requested  [2020/34]
07.05.2020Date on which the examining division has become responsible
17.06.2021Communication of intention to grant the patent
15.10.2021Receipt of the translation of the claim(s)
18.10.2021Fee for grant paid
18.10.2021Fee for publishing/printing paid
Opposition(s)02.09.2022No opposition filed within time limit [2022/45]
Fees paidRenewal fee
23.10.2020Renewal fee patent year 03
23.10.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.10.2018
AL01.12.2021
AT01.12.2021
CY01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
IT01.12.2021
LT01.12.2021
LV01.12.2021
MC01.12.2021
MK01.12.2021
MT01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SI01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
[2024/44]
Former [2024/27]HU11.10.2018
AL01.12.2021
AT01.12.2021
CY01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
IT01.12.2021
LT01.12.2021
LV01.12.2021
MC01.12.2021
MK01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SI01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2024/24]HU11.10.2018
AL01.12.2021
AT01.12.2021
CY01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
IT01.12.2021
LT01.12.2021
LV01.12.2021
MC01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SI01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2024/21]AL01.12.2021
AT01.12.2021
CY01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
IT01.12.2021
LT01.12.2021
LV01.12.2021
MC01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SI01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2023/25]AL01.12.2021
AT01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
IT01.12.2021
LT01.12.2021
LV01.12.2021
MC01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SI01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2023/01]AL01.12.2021
AT01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SI01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2022/49]AL01.12.2021
AT01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2022/46]AT01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2022/42]AT01.12.2021
CZ01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2022/35]AT01.12.2021
CZ01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
PT01.04.2022
Former [2022/34]AT01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
PT01.04.2022
Former [2022/33]AT01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RS01.12.2021
SE01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
Former [2022/30]AT01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RS01.12.2021
SE01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
Former [2022/25]AT01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
PL01.12.2021
RS01.12.2021
SE01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
Former [2022/24]AT01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
PL01.12.2021
RS01.12.2021
SE01.12.2021
BG01.03.2022
GR02.03.2022
Former [2022/23]AT01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
PL01.12.2021
RS01.12.2021
BG01.03.2022
Former [2022/22]AT01.12.2021
FI01.12.2021
LT01.12.2021
RS01.12.2021
BG01.03.2022
Former [2022/21]AT01.12.2021
RS01.12.2021
BG01.03.2022
Former [2022/19]BG01.03.2022
Cited inInternational search[A]JPS4734765U  (N.A.) [A] 1-11 * the whole document *;
 [A]JPH10167690  (TOYODA AUTOMATIC LOOM WORKS) [A] 1-11 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.