EP3637562 - CONNECTOR STRUCTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.07.2023 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 05.08.2022 | ||
Former | Grant of patent is intended Status updated on 22.03.2022 | ||
Former | Request for examination was made Status updated on 13.03.2020 | ||
Former | The international publication has been made Status updated on 15.12.2018 | Most recent event Tooltip | 10.05.2024 | Lapse of the patent in a contracting state New state(s): BE, FR, GB | published on 12.06.2024 [2024/24] | Applicant(s) | For all designated states Nippon Tanshi Co., Ltd. 26-7 Yaezakicho Hiratsuka-shi, Kanagawa 254-0811 / JP | [2020/16] | Inventor(s) | 01 /
KAWAHARA Yuzo c/o NIPPON TANSHI Co. Ltd. 26-7 Yaezakicho Hiratsuka-shi Kanagawa 254-0811 / JP | 02 /
SHIMOTOMAI Taichi c/o NIPPON TANSHI Co. Ltd. 26-7 Yaezakicho Hiratsuka-shi Kanagawa 254-0811 / JP | [2020/16] | Representative(s) | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | [2020/16] | Application number, filing date | 18814364.8 | 24.05.2018 | [2020/16] | WO2018JP20060 | Priority number, date | JP20170111318 | 06.06.2017 Original published format: JP 2017111318 | [2020/16] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018225527 | Date: | 13.12.2018 | Language: | JA | [2018/50] | Type: | A1 Application with search report | No.: | EP3637562 | Date: | 15.04.2020 | Language: | EN | [2020/16] | Type: | B1 Patent specification | No.: | EP3637562 | Date: | 07.09.2022 | Language: | EN | [2022/36] | Search report(s) | International search report - published on: | JP | 13.12.2018 | (Supplementary) European search report - dispatched on: | EP | 06.11.2020 | Classification | IPC: | H01R13/629, H01R13/514, H01R13/627 | [2020/50] | CPC: |
H01R13/6272 (EP,US);
H01R13/514 (EP,US);
H01R13/629 (EP)
|
Former IPC [2020/16] | H01R13/629, H01R13/514, H01R13/639 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERBINDERSTRUKTUR | [2020/16] | English: | CONNECTOR STRUCTURE | [2020/16] | French: | STRUCTURE DE CONNECTEUR | [2020/16] | Entry into regional phase | 30.12.2019 | Translation filed | 30.12.2019 | National basic fee paid | 30.12.2019 | Search fee paid | 30.12.2019 | Designation fee(s) paid | 30.12.2019 | Examination fee paid | Examination procedure | 30.12.2019 | Examination requested [2020/16] | 28.05.2021 | Amendment by applicant (claims and/or description) | 23.03.2022 | Communication of intention to grant the patent | 29.07.2022 | Fee for grant paid | 29.07.2022 | Fee for publishing/printing paid | 29.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 08.06.2023 | No opposition filed within time limit [2023/33] | Fees paid | Renewal fee | 27.03.2020 | Renewal fee patent year 03 | 20.05.2021 | Renewal fee patent year 04 | 18.05.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 07.09.2022 | AT | 07.09.2022 | CZ | 07.09.2022 | DK | 07.09.2022 | EE | 07.09.2022 | ES | 07.09.2022 | FI | 07.09.2022 | HR | 07.09.2022 | LT | 07.09.2022 | LV | 07.09.2022 | MC | 07.09.2022 | PL | 07.09.2022 | RO | 07.09.2022 | RS | 07.09.2022 | SI | 07.09.2022 | SK | 07.09.2022 | SM | 07.09.2022 | NO | 07.12.2022 | GR | 08.12.2022 | IS | 07.01.2023 | PT | 09.01.2023 | GB | 24.05.2023 | IE | 24.05.2023 | LU | 24.05.2023 | BE | 31.05.2023 | CH | 31.05.2023 | FR | 31.05.2023 | LI | 31.05.2023 | [2024/24] |
Former [2024/21] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
MC | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
IE | 24.05.2023 | ||
LU | 24.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
Former [2024/09] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
MC | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
LU | 24.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
Former [2024/08] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
MC | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
LU | 24.05.2023 | ||
Former [2023/37] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/33] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/29] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/26] | AT | 07.09.2022 | |
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/23] | AT | 07.09.2022 | |
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
PT | 09.01.2023 | ||
Former [2023/22] | AT | 07.09.2022 | |
CZ | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
PT | 09.01.2023 | ||
Former [2023/20] | FI | 07.09.2022 | |
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
Former [2023/10] | FI | 07.09.2022 | |
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
Former [2023/09] | FI | 07.09.2022 | |
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
NO | 07.12.2022 | ||
Former [2023/08] | FI | 07.09.2022 | |
LT | 07.09.2022 | ||
RS | 07.09.2022 | ||
NO | 07.12.2022 | Documents cited: | Search | [ ] - No further relevant documents disclosed | International search | [A]JPH10106670 (SUMITOMO WIRING SYSTEMS) [A] 1-7 * , paragraphs [0024]-[0026], fig. 1, 5 (Family: none) *; | [A]JP3120730B (SUMITOMO WIRING SYSTEMS, LTD.) [A] 1-7* , fig. 10 & US 5913703 A (fig. 19) & EP 803941 A2 *; | [A]JP2016122563 (AUTO NETWORK GIJUTSU KENKYUSHO KK , et al) [A] 1-7 * , paragraphs [0032]-[0033], fig. 1-6 (Family: none) * | by applicant | JP2005322487 | JP2014078370 |