EP3735556 - LUMINAIRE COMPRISING A SURFACE TILE AND A LIGHTING DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.12.2023 Database last updated on 18.10.2024 | |
Former | The patent has been granted Status updated on 20.01.2023 | ||
Former | Grant of patent is intended Status updated on 14.09.2022 | ||
Former | Request for examination was made Status updated on 09.10.2020 | ||
Former | The international publication has been made Status updated on 12.07.2019 | ||
Former | unknown Status updated on 22.12.2018 | Most recent event Tooltip | 30.08.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 02.10.2024 [2024/40] | Applicant(s) | For all designated states Signify Holding B.V. High Tech Campus 48 5656 AE Eindhoven / NL | [2020/46] | Inventor(s) | 01 /
MOS, Barry Philips Lighting B.V. Intellectual Property High Tech Campus 7 5656 AE Eindhoven / NL | [2020/46] | Representative(s) | Verweij, Petronella Daniëlle Signify Netherlands B.V. Intellectual Property High Tech Campus 7 5656 AE Eindhoven / NL | [2020/46] | Application number, filing date | 18816126.9 | 18.12.2018 | [2020/46] | WO2018EP85518 | Priority number, date | EP20180150006 | 02.01.2018 Original published format: EP 18150006 | [2020/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019134822 | Date: | 11.07.2019 | Language: | EN | [2019/28] | Type: | A1 Application with search report | No.: | EP3735556 | Date: | 11.11.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.07.2019 takes the place of the publication of the European patent application. | [2020/46] | Type: | B1 Patent specification | No.: | EP3735556 | Date: | 22.02.2023 | Language: | EN | [2023/08] | Search report(s) | International search report - published on: | EP | 11.07.2019 | Classification | IPC: | F21V8/00 | [2020/46] | CPC: |
G02B6/001 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | LICHTFÜHRUNG, BELEUCHTUNGSVORRICHTUNG UND LEUCHTE | [2022/31] | English: | LUMINAIRE COMPRISING A SURFACE TILE AND A LIGHTING DEVICE | [2020/46] | French: | GUIDE DE LUMIÈRE, DISPOSITIF D'ÉCLAIRAGE ET LUMINAIRE | [2022/31] |
Former [2020/46] | LEUCHTE MIT EINER FLÄCHENKACHEL UND EINER BELEUCHTUNGSEINRICHTUNG | ||
Former [2020/46] | LUMINAIRE COMPRENANT UN CARREAU DE SURFACE ET UN DISPOSITIF D'ÉCLAIRAGE | Entry into regional phase | 03.08.2020 | National basic fee paid | 03.08.2020 | Designation fee(s) paid | 03.08.2020 | Examination fee paid | Examination procedure | 23.06.2020 | Amendment by applicant (claims and/or description) | 03.08.2020 | Examination requested [2020/46] | 03.08.2020 | Date on which the examining division has become responsible | 15.09.2022 | Communication of intention to grant the patent | 09.01.2023 | Fee for grant paid | 09.01.2023 | Fee for publishing/printing paid | 09.01.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 23.11.2023 | No opposition filed within time limit [2024/05] | Fees paid | Renewal fee | 11.01.2021 | Renewal fee patent year 03 | 03.01.2022 | Renewal fee patent year 04 | 02.01.2023 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 22.02.2023 | CZ | 22.02.2023 | DK | 22.02.2023 | EE | 22.02.2023 | ES | 22.02.2023 | FI | 22.02.2023 | HR | 22.02.2023 | IT | 22.02.2023 | LT | 22.02.2023 | LV | 22.02.2023 | MC | 22.02.2023 | NL | 22.02.2023 | PL | 22.02.2023 | RO | 22.02.2023 | RS | 22.02.2023 | SE | 22.02.2023 | SI | 22.02.2023 | SK | 22.02.2023 | SM | 22.02.2023 | NO | 22.05.2023 | GR | 23.05.2023 | IS | 22.06.2023 | PT | 22.06.2023 | [2024/40] |
Former [2024/26] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
IT | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2024/11] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/50] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/49] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/48] | AT | 22.02.2023 | |
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/46] | AT | 22.02.2023 | |
DK | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/39] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/38] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
PT | 22.06.2023 | ||
Former [2023/37] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
PT | 22.06.2023 | ||
Former [2023/36] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
NO | 22.05.2023 | ||
PT | 22.06.2023 | ||
Former [2023/35] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
NL | 22.02.2023 | ||
RS | 22.02.2023 | ||
NO | 22.05.2023 | ||
PT | 22.06.2023 | ||
Former [2023/34] | ES | 22.02.2023 | |
LT | 22.02.2023 | ||
RS | 22.02.2023 | ||
PT | 22.06.2023 | ||
Former [2023/33] | ES | 22.02.2023 | |
LT | 22.02.2023 | Cited in | International search | [A]US2001016105 (SUGIYAMA HIDEO [JP], et al) [A] 1-13 * paragraph [0097] - paragraph [0179] * * figures 7, 8 *; | [A]WO2012168839 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [A] 1-13 * page 7, line 1 - page 17, line 31 * * figures 3-14 *; | [A]US2014268865 (MATTHEW MARY ANN [US]) [A] 11 * paragraph [0056] * * figure 2 *; | [A]US2016372100 (MASON JONATHAN DAVID [NL], et al) [A] 1-13 * paragraph [0063] - paragraph [0069] ** figures 4, 6 *; | [A]WO2017151299 (3M INNOVATIVE PROPERTIES CO [US]) [A] 1-13 * page 3, line 15 - page 9, line 12 * * figures 1-6 * | Examination | US2016372100 | by applicant | US2016077272 |