EP3641377 - RADIO ACCESS NETWORK NODE, RADIO TEMINAL AND METHODS THEREFOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.05.2023 Database last updated on 12.06.2024 | |
Former | The patent has been granted Status updated on 10.06.2022 | ||
Former | Grant of patent is intended Status updated on 31.01.2022 | ||
Former | Request for examination was made Status updated on 20.03.2020 | ||
Former | The international publication has been made Status updated on 22.12.2018 | Most recent event Tooltip | 19.01.2024 | Lapse of the patent in a contracting state New state(s): IE | published on 21.02.2024 [2024/08] | Applicant(s) | For all designated states NEC Corporation 7-1, Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2020/17] | Inventor(s) | 01 /
FUTAKI, Hisashi c/o NEC Corporation 7-1 Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2022/07] |
Former [2020/17] | 01 /
FUTAKI Hisashi c/o NEC Corporation 7-1 Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | Representative(s) | MacDougall, Alan John Shaw, et al Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [2022/28] |
Former [2020/17] | MacDougall, Alan John Shaw, et al Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | Application number, filing date | 18816882.7 | 24.01.2018 | [2020/17] | WO2018JP02041 | Priority number, date | JP20170118095 | 15.06.2017 Original published format: JP 2017118095 | [2020/17] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018230027 | Date: | 20.12.2018 | Language: | JA | [2018/51] | Type: | A1 Application with search report | No.: | EP3641377 | Date: | 22.04.2020 | Language: | EN | [2020/17] | Type: | B1 Patent specification | No.: | EP3641377 | Date: | 13.07.2022 | Language: | EN | [2022/28] | Search report(s) | International search report - published on: | JP | 20.12.2018 | (Supplementary) European search report - dispatched on: | EP | 12.06.2020 | Classification | IPC: | H04W16/32, H04W8/22, H04W72/04, H04W80/02, H04W76/15 | [2020/29] | CPC: |
H04W76/15 (EP);
H04W16/32 (EP,KR,US);
H04W76/16 (KR,US);
H04W76/19 (KR);
H04W8/22 (EP,KR,US);
H04W80/02 (EP,KR);
H04W88/06 (EP,KR);
H04W88/08 (EP,KR);
H04W92/20 (EP,KR);
|
Former IPC [2020/17] | H04W16/32, H04W8/22, H04W72/04, H04W80/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/17] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | FUNKZUGANGSNETZWERKKNOTEN, FUNKENDGERÄT UND VERFAHREN DAFÜR | [2020/17] | English: | RADIO ACCESS NETWORK NODE, RADIO TEMINAL AND METHODS THEREFOR | [2020/17] | French: | NOEUD DE RÉSEAU D'ACCÈS RADIOÉLECTRIQUE, TERMINAL RADIOÉLECTRIQUE ET PROCÉDÉS ASSOCIÉS | [2020/17] | Entry into regional phase | 10.12.2019 | Translation filed | 10.12.2019 | National basic fee paid | 10.12.2019 | Search fee paid | 10.12.2019 | Designation fee(s) paid | 10.12.2019 | Examination fee paid | Examination procedure | 10.12.2019 | Examination requested [2020/17] | 08.01.2021 | Amendment by applicant (claims and/or description) | 01.02.2022 | Communication of intention to grant the patent | 01.06.2022 | Fee for grant paid | 01.06.2022 | Fee for publishing/printing paid | 01.06.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | EP22176827.8 / EP4075842 | Opposition(s) | 14.04.2023 | No opposition filed within time limit [2023/25] | Fees paid | Renewal fee | 31.01.2020 | Renewal fee patent year 03 | 13.01.2021 | Renewal fee patent year 04 | 25.01.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 13.07.2022 | AT | 13.07.2022 | CZ | 13.07.2022 | DK | 13.07.2022 | EE | 13.07.2022 | FI | 13.07.2022 | HR | 13.07.2022 | LT | 13.07.2022 | LV | 13.07.2022 | PL | 13.07.2022 | RO | 13.07.2022 | RS | 13.07.2022 | SE | 13.07.2022 | SI | 13.07.2022 | SK | 13.07.2022 | SM | 13.07.2022 | NO | 13.10.2022 | GR | 14.10.2022 | IS | 13.11.2022 | PT | 14.11.2022 | IE | 24.01.2023 | LU | 24.01.2023 | BE | 31.01.2023 | CH | 31.01.2023 | LI | 31.01.2023 | [2024/08] |
Former [2023/49] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
LU | 24.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/47] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
LU | 24.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/43] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
LU | 24.01.2023 | ||
Former [2023/37] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/29] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/23] | AT | 13.07.2022 | |
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/22] | AT | 13.07.2022 | |
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/21] | DK | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/20] | FI | 13.07.2022 | |
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/12] | FI | 13.07.2022 | |
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/11] | FI | 13.07.2022 | |
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
PT | 14.11.2022 | ||
Former [2023/10] | FI | 13.07.2022 | |
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
PT | 14.11.2022 | ||
Former [2023/09] | FI | 13.07.2022 | |
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
PT | 14.11.2022 | ||
Former [2023/08] | FI | 13.07.2022 | |
LT | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | Documents cited: | Search | [I] - KDDI CORPORATION, "Protocol stacks of dual connectivity solutions targeting the avoidance of frequent handovers", vol. RAN WG2, no. Chicago, USA; 20130415 - 20130419, (20130405), 3GPP DRAFT; R2_131192_SOLUTION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_81bis/Docs/, (20130405), XP050699182 [I] 1-15 * the whole document * | [A] - INTEL CORPORATION, "RRC aspects of unifying split bearer types", vol. RAN WG2, no. Hangzhou, China; 20170515 - 20170519, (20170506), 3GPP DRAFT; R2-1704798-SPLIT-BEARER-MERGE-V3, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_98/Docs/, (20170506), XP051264564 [A] 1-15 * the whole document * | [AP] - ZTE, "Consideration on the necessity of unified PDCP version for SRB", vol. RAN WG2, no. Berlin, Germany; 20170821 - 20170825, (20170820), 3GPP DRAFT; R2-1708132 CONSIDERATION ON THE NECESSITY OF UNIFIED PDCP VERSION OF SRB, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANT, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170820), XP051318035 [AP] 1-15 * the whole document * | International search | [A]US2016094446 (KAZMI ZAIGHAM [US], et al) [A] 1-45 * , paragraph [0051], fig. 6 & WO 2014/185953 A1 & TW 201448538 A & EP 2997670 A1 *; | [A]WO2016138798 (ZTE CORP [CN]) [A] 1-45 * , page 2, line 22, fig. 2 & EP 3253122 A1, column 2, lines 34, 35, fig. 2 & CN 105992288 A *; | [A]US2016337909 (CAI ZHIJUN [US]) [A] 1-45 * , paragraph [0120], fig. 2 & WO 2016/183078 A1 *; | [A] - "Protocol stacks of dual connectivity solutions targeting the avoidance of frequent handovers", 3GPP TSG RAN WG2 Meeting #81bis, (20130405), URL: http://www.3gpp.org/ftp/tsg_ran/wg2_r12/TSGR2_81bis/Docs/R2-131192.zip, (20180209), XP050699182 [A] 1-45 * . especially, see "PDCP" in figure 1 (c). * | [A] - ERICSSON, "Bearer type switching in dual connectivity", 3GPP TSG-RAN WG2 #98, (20170506), URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_98/Docs/R2-1704415.zip, (20180209), XP051264419 [A] 1-45 * , especially, see line following fig. 1. * | [A] - "Further analysis of unified split bearer-NW aspects", 3GPP TSG-RAN WG2 #98, (20170506), URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_98/Docs/R2-1704152.zip, (20180209), XP051264296 [A] 1-45 * . especially, see page 2, lines 1-3; figure 2. 1-1. * | by applicant | JP2017118095 |