blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3737585

EP3737585 - LIGHTING DEVICE FOR A VEHICLE HEADLAMP WITH AT LEAST ONE OPTICALLY RELEVANT COMPONENT AND AN ADJUSTING SYSTEM FOR PIVOTING THE OPTICALLY RELEVANT COMPONENT ABOUT A FIRST AND A SECOND AXIS [Right-click to bookmark this link]
Former [2020/47]ADJUSTING SYSTEM FOR PIVOTING AT LEAST ONE OPTICALLY RELEVANT COMPONENT OF A VEHICLE HEADLIGHT ABOUT A FIRST AND A SECOND AXIS
[2021/21]
StatusNo opposition filed within time limit
Status updated on  22.07.2022
Database last updated on 15.07.2024
FormerThe patent has been granted
Status updated on  13.08.2021
FormerGrant of patent is intended
Status updated on  15.07.2021
FormerRequest for examination was made
Status updated on  15.06.2021
FormerGrant of patent is intended
Status updated on  19.05.2021
FormerRequest for examination was made
Status updated on  16.10.2020
FormerThe international publication has been made
Status updated on  19.07.2019
Formerunknown
Status updated on  10.01.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
ZKW Group GmbH
Rottenhauser Straße 8
3250 Wieselburg / AT
[2020/47]
Inventor(s)01 / BERGER, Martin
Am Walde 1
3661 Artstetten / AT
 [2020/47]
Representative(s)Patentanwaltskanzlei Matschnig & Forsthuber OG
Biberstraße 22
Postfach 36
1010 Wien / AT
[2020/47]
Application number, filing date18826269.517.12.2018
[2020/47]
WO2018EP85104
Priority number, dateEP2018015112511.01.2018         Original published format: EP 18151125
[2020/47]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2019137736
Date:18.07.2019
Language:DE
[2019/29]
Type: A1 Application with search report 
No.:EP3737585
Date:18.11.2020
Language:DE
The application published by WIPO in one of the EPO official languages on 18.07.2019 takes the place of the publication of the European patent application.
[2020/47]
Type: B1 Patent specification 
No.:EP3737585
Date:15.09.2021
Language:DE
[2021/37]
Search report(s)International search report - published on:EP18.07.2019
ClassificationIPC:B60Q1/076, B60Q1/068
[2020/47]
CPC:
B60Q1/076 (EP,KR); B60Q1/068 (US); B60Q1/0683 (EP,KR);
B60Q1/12 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/47]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:BELEUCHTUNGSVORRICHTUNG FÜR EINEN FAHRZEUGSCHEINWERFER MIT ZUMINDEST EINEM OPTISCH RELEVANTEN BAUTEIL UND EINEM EINSTELLSYSTEM ZUM VERSCHWENKEN DES OPTISCH RELEVANTEN BAUTEILS UM EINE ERSTE UND EINE ZWEITE ACHSE[2021/21]
English:LIGHTING DEVICE FOR A VEHICLE HEADLAMP WITH AT LEAST ONE OPTICALLY RELEVANT COMPONENT AND AN ADJUSTING SYSTEM FOR PIVOTING THE OPTICALLY RELEVANT COMPONENT ABOUT A FIRST AND A SECOND AXIS[2021/21]
French:DISPOSIF D'ÉCLAIRAGE D'UN PHARE DE VÉHICULE AVEC AU MOINS UN COMPOSANT OPTIQUE ET UN SYSTÈME DE RÉGLAGE PERMETTANT DE FAIRE PIVOTER LE COMPOSANT OPTIQUE AUTOUR D'UN PREMIER AXE ET D'UN DEUXIEME AXE[2021/21]
Former [2020/47]EINSTELLSYSTEM ZUM VERSCHWENKEN ZUMINDEST EINES OPTISCH RELEVANTEN BAUTEILS EINES FAHRZEUGSCHEINWERFERS UM EINE ERSTE UND EINE ZWEITE ACHSE
Former [2020/47]ADJUSTING SYSTEM FOR PIVOTING AT LEAST ONE OPTICALLY RELEVANT COMPONENT OF A VEHICLE HEADLIGHT ABOUT A FIRST AND A SECOND AXIS
Former [2020/47]SYSTÈME DE RÉGLAGE PERMETTANT DE FAIRE PIVOTER AU MOINS UN COMPOSANT OPTIQUEMENT PERTINENT D'UN PHARE DE VÉHICULE SUR UN PREMIER ET UN DEUXIEME AXE
Entry into regional phase20.01.2020National basic fee paid 
20.01.2020Designation fee(s) paid 
20.01.2020Examination fee paid 
Examination procedure20.01.2020Examination requested  [2020/47]
20.01.2020Date on which the examining division has become responsible
08.02.2021Amendment by applicant (claims and/or description)
20.05.2021Communication of intention to grant the patent
11.06.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
16.07.2021Communication of intention to grant the patent
30.07.2021Fee for grant paid
30.07.2021Fee for publishing/printing paid
30.07.2021Receipt of the translation of the claim(s)
Opposition(s)16.06.2022No opposition filed within time limit [2022/34]
Fees paidRenewal fee
22.12.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.12.2018
AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IE17.12.2021
LU17.12.2021
BE31.12.2021
CH31.12.2021
LI31.12.2021
IS15.01.2022
PT17.01.2022
[2024/23]
Former [2023/41]HU17.12.2018
AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IE17.12.2021
LU17.12.2021
BE31.12.2021
CH31.12.2021
LI31.12.2021
IS15.01.2022
PT17.01.2022
Former [2023/33]HU17.12.2018
AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IE17.12.2021
LU17.12.2021
BE31.12.2021
CH31.12.2021
LI31.12.2021
IS15.01.2022
PT17.01.2022
Former [2023/30]AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IE17.12.2021
LU17.12.2021
BE31.12.2021
CH31.12.2021
LI31.12.2021
IS15.01.2022
PT17.01.2022
Former [2023/10]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IE17.12.2021
LU17.12.2021
BE31.12.2021
CH31.12.2021
LI31.12.2021
IS15.01.2022
PT17.01.2022
Former [2023/03]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IE17.12.2021
LU17.12.2021
BE31.12.2021
CH31.12.2021
LI31.12.2021
IS15.01.2022
PT17.01.2022
Former [2023/01]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IE17.12.2021
LU17.12.2021
BE31.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/48]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IE17.12.2021
LU17.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/46]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
LU17.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/36]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/33]AL15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/29]AL15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/25]CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/24]CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/23]CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
PL15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
PT17.01.2022
Former [2022/10]FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
Former [2022/09]FI15.09.2021
LT15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/08]FI15.09.2021
LT15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/07]LT15.09.2021
NO15.12.2021
Cited inInternational search[XI]US2011063866  (SHIBATA HIROKI [JP], et al) [X] 1,2,4-7,9,11,15,16 * paragraphs [0080] - [0136]; figures 6-9 * [I] 3,8,10,12-14;
 [XI]EP2724888  (KOITO MFG CO LTD [JP]) [X] 1,3-6,9,11,14-16 * paragraphs [0032] - [0037] - [0 80] - [0120]; figures 8-11 * [I] 2,7,8,10,12,13;
 [A]US2015009699  (TAKII NAOKI [JP]) [A] 1-16* the whole document *;
 [A]EP3048360  (KOITO MFG CO LTD [JP]) [A] 1-16 * paragraphs [0085] - [0117]; figures 8-13 *
by applicantAT513918B
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.