EP3605768 - SAFE PROCESSING METHOD FOR ACTIVE VOLTAGE REDUCTION OF GROUND FAULT PHASE OF NON-EFFECTIVE GROUNDING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.11.2023 Database last updated on 21.05.2024 | |
Former | The patent has been granted Status updated on 09.12.2022 | ||
Former | Grant of patent is intended Status updated on 16.08.2022 | ||
Former | Request for examination was made Status updated on 03.01.2020 | ||
Former | The international publication has been made Status updated on 12.01.2019 | Most recent event Tooltip | 10.05.2024 | Lapse of the patent in a contracting state New state(s): BE, CH, FR, GB | published on 12.06.2024 [2024/24] | Applicant(s) | For all designated states Changsha University of Science and Technology No.960 2nd Section South Wanjiali Road Yuhua District Changsha, Hunan 410004 / CN | [2020/06] | Inventor(s) | 01 /
ZENG, Xiangjun No.960 2nd Section South Wanjiali Road Yuhua District Changsha Hunan 410004 / CN | [2020/06] | Representative(s) | Petraz, Gilberto Luigi, et al GLP S.r.l. Viale Europa Unita, 171 33100 Udine / IT | [2020/06] | Application number, filing date | 18828476.4 | 04.07.2018 | [2020/06] | WO2018CN94402 | Priority number, date | CN201710550400 | 06.07.2017 Original published format: CN201710550400 | [2020/06] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019007348 | Date: | 10.01.2019 | Language: | ZH | [2019/02] | Type: | A1 Application with search report | No.: | EP3605768 | Date: | 05.02.2020 | Language: | EN | [2020/06] | Type: | B1 Patent specification | No.: | EP3605768 | Date: | 11.01.2023 | Language: | EN | [2023/02] | Search report(s) | International search report - published on: | CN | 10.01.2019 | (Supplementary) European search report - dispatched on: | EP | 27.11.2020 | Classification | IPC: | H02H9/02, H02H9/08 | [2021/01] | CPC: |
H02H9/08 (EP);
H02H9/02 (CN,RU);
H02H9/002 (US)
|
Former IPC [2020/06] | H02H9/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/06] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR SICHEREN VERARBEITUNG ZUR AKTIVEN SPANNUNGSVERRINGERUNG DER ERDSCHLUSSPHASE EINES INEFFEKTIVEN ERDUNGSSYSTEMS | [2020/06] | English: | SAFE PROCESSING METHOD FOR ACTIVE VOLTAGE REDUCTION OF GROUND FAULT PHASE OF NON-EFFECTIVE GROUNDING SYSTEM | [2020/06] | French: | PROCÉDÉ DE TRAITEMENT SANS DANGER POUR UNE RÉDUCTION ACTIVE DE TENSION DE PHASE DE DÉFAUT À LA TERRE DE SYSTÈME DE MISE À LA TERRE NON EFFICACE | [2020/06] | Entry into regional phase | 21.10.2019 | Translation filed | 21.10.2019 | National basic fee paid | 21.10.2019 | Search fee paid | 21.10.2019 | Designation fee(s) paid | 21.10.2019 | Examination fee paid | Examination procedure | 21.10.2019 | Examination requested [2020/06] | 17.05.2021 | Amendment by applicant (claims and/or description) | 17.08.2022 | Communication of intention to grant the patent | 30.11.2022 | Fee for grant paid | 30.11.2022 | Fee for publishing/printing paid | 30.11.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 12.10.2023 | No opposition filed within time limit [2023/51] | Fees paid | Renewal fee | 20.07.2020 | Renewal fee patent year 03 | 29.06.2021 | Renewal fee patent year 04 | 06.05.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 11.01.2023 | CZ | 11.01.2023 | DK | 11.01.2023 | EE | 11.01.2023 | ES | 11.01.2023 | FI | 11.01.2023 | HR | 11.01.2023 | LT | 11.01.2023 | LV | 11.01.2023 | MC | 11.01.2023 | NL | 11.01.2023 | PL | 11.01.2023 | RO | 11.01.2023 | RS | 11.01.2023 | SE | 11.01.2023 | SI | 11.01.2023 | SK | 11.01.2023 | SM | 11.01.2023 | NO | 11.04.2023 | GR | 12.04.2023 | IS | 11.05.2023 | PT | 11.05.2023 | GB | 04.07.2023 | LU | 04.07.2023 | BE | 31.07.2023 | CH | 31.07.2023 | FR | 31.07.2023 | [2024/24] |
Former [2024/18] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
MC | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SI | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
LU | 04.07.2023 | ||
Former [2024/14] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
MC | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SI | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2024/11] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SI | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/50] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SK | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/49] | AT | 11.01.2023 | |
CZ | 11.01.2023 | ||
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RO | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/48] | AT | 11.01.2023 | |
DK | 11.01.2023 | ||
EE | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/46] | AT | 11.01.2023 | |
DK | 11.01.2023 | ||
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
SM | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/39] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
IS | 11.05.2023 | ||
PT | 11.05.2023 | ||
Former [2023/38] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
PL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
PT | 11.05.2023 | ||
Former [2023/37] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
NO | 11.04.2023 | ||
GR | 12.04.2023 | ||
PT | 11.05.2023 | ||
Former [2023/36] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
FI | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
LV | 11.01.2023 | ||
NL | 11.01.2023 | ||
RS | 11.01.2023 | ||
SE | 11.01.2023 | ||
NO | 11.04.2023 | ||
PT | 11.05.2023 | ||
Former [2023/35] | AT | 11.01.2023 | |
ES | 11.01.2023 | ||
HR | 11.01.2023 | ||
LT | 11.01.2023 | ||
NL | 11.01.2023 | ||
RS | 11.01.2023 | ||
NO | 11.04.2023 | ||
PT | 11.05.2023 | ||
Former [2023/34] | ES | 11.01.2023 | |
LT | 11.01.2023 | ||
NL | 11.01.2023 | ||
RS | 11.01.2023 | ||
PT | 11.05.2023 | ||
Former [2023/33] | ES | 11.01.2023 | |
LT | 11.01.2023 | ||
NL | 11.01.2023 | ||
Former [2023/31] | NL | 11.01.2023 | Documents cited: | Search | [A]US1784682 (ROBERT SCHIMPF) [A] 1 * page 1, line 57 - page 2; figures 1,2 *; | [A]CN2306605Y (ZHANG XUHUI [CN]) [A] 1* the whole document *; | [A]CN202353205U (LIUXIN HUANG) [A] 1-10 * the whole document *; | [A]CN104901299 (ANHUI MANITE HEKAI ELECTRICAL APPLIANCES CO LTD) [A] 1-10 * paragraphs [0011] - [0015]; figure 1 * | International search | [A]CN1645705 (CHANGSHA SCIENCE AND ENGINEERI [CN]) [A] 1-10 * entire document *; | [A]CN1912642 (XU WENYUAN [CN]) [A] 1-10 * entire document *; | [A]WO2012013165 (ZAPADOCESKA UNIVERZITA V PLZNI [CZ], et al) [A] 1-10* entire document *; | [A]CN104662761 (SWEDISH NEUTRAL AB) [A] 1-10 * description, paragraphs 45-58, and figures 1-4a *; | [PX]CN107147096 (UNIV CHANGSHA SCIENCE & TECH) [PX] 1-10 * description, paragraphs 33-51, claims 1-10, and figures 1-6 * | by applicant | CN20111006701 |