blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3634059

EP3634059 - METHOD AND DEVICE FOR TRANSMITTING INFORMATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.08.2022
Database last updated on 07.06.2024
FormerThe patent has been granted
Status updated on  27.08.2021
FormerGrant of patent is intended
Status updated on  02.05.2021
FormerExamination is in progress
Status updated on  08.10.2020
FormerRequest for examination was made
Status updated on  06.03.2020
FormerThe international publication has been made
Status updated on  26.01.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[2020/15]
Inventor(s)01 / ZHANG, Jinfang
Huawei Administration Building
Bantian
Longgang District
Shenzhen Guangdong 518129 / CN
02 / LU, Lei
Huawei Administration Building
Bantian
Longgang District
Shenzhen Guangdong 518129 / CN
03 / RONG, Lu
Huawei Administration Building
Bantian
Longgang District
Shenzhen Guangdong 518129 / CN
 [2020/15]
Representative(s)Epping - Hermann - Fischer
Patentanwaltsgesellschaft mbH
Schloßschmidstraße 5
80639 München / DE
[2020/15]
Application number, filing date18834505.216.07.2018
[2020/15]
WO2018CN95781
Priority number, dateCN20171058780118.07.2017         Original published format: CN201710587801
[2020/15]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019015546
Date:24.01.2019
Language:ZH
[2019/04]
Type: A1 Application with search report 
No.:EP3634059
Date:08.04.2020
Language:EN
[2020/15]
Type: B1 Patent specification 
No.:EP3634059
Date:29.09.2021
Language:EN
[2021/39]
Search report(s)International search report - published on:CN24.01.2019
(Supplementary) European search report - dispatched on:EP23.04.2020
ClassificationIPC:H04W72/04, H04L5/00
[2020/15]
CPC:
H04W72/23 (EP,US); H04W72/20 (CN,US); H04L5/00 (EP);
H04L5/0094 (US); H04L5/14 (EP); H04L5/1438 (CN);
H04W72/12 (EP,US); H04W72/1221 (CN); H04W72/21 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/15]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR ÜBERTRAGUNG VON INFORMATIONEN[2020/15]
English:METHOD AND DEVICE FOR TRANSMITTING INFORMATION[2020/15]
French:PROCÉDÉ ET DISPOSITIF DE TRANSMISSION D'INFORMATIONS[2020/15]
Entry into regional phase02.01.2020Translation filed 
02.01.2020National basic fee paid 
02.01.2020Search fee paid 
02.01.2020Designation fee(s) paid 
02.01.2020Examination fee paid 
Examination procedure02.01.2020Examination requested  [2020/15]
19.08.2020Amendment by applicant (claims and/or description)
07.10.2020Despatch of a communication from the examining division (Time limit: M04)
08.12.2020Reply to a communication from the examining division
03.05.2021Communication of intention to grant the patent
17.08.2021Fee for grant paid
17.08.2021Fee for publishing/printing paid
23.08.2021Receipt of the translation of the claim(s)
Opposition(s)30.06.2022No opposition filed within time limit [2022/36]
Fees paidRenewal fee
22.07.2020Renewal fee patent year 03
21.07.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.07.2018
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
MK29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
SM29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
[2024/23]
Former [2024/21]HU16.07.2018
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
SM29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2024/20]HU16.07.2018
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2024/18]HU16.07.2018
AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/11]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/10]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/01]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/36]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/29]AL29.09.2021
AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/24]AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/23]AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
PL29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
PT31.01.2022
Former [2022/21]AT29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
RS29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
Former [2022/10]FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
RS29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
Former [2022/09]FI29.09.2021
LT29.09.2021
RS29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
Former [2022/08]FI29.09.2021
LT29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
Former [2022/07]LT29.09.2021
NO29.12.2021
Documents cited:Search[A]EP2661136  (IND TECH RES INST [TW]) [A] 1-15* paragraphs [0024] - [0027]; figure 7 *;
 [XI]WO2014157979  (SAMSUNG ELECTRONICS CO LTD [KR], et al) [X] 1,14 * paragraphs [0095] - [0102] - [ 105] - [0110] - [ 138]; figures 3, 6 * [I] 6,7,13;
 [XI]US9521669  (WANG YIPING [US], et al) [X] 1-3,5,8-10,12,14,15 * column 12, line 63 - column 13, line 3; figure 13 * * column 13, line 51 - column 14, line 5 * [I] 4,11
International search[X]CN104137441  (INTEL CORP) [X] 1-28 * description, paragraphs 40-75, and figures 5 and 6A-6D *;
 [A]WO2016069141  (QUALCOMM INC [US]) [A] 1-28* entire document *;
 [A]EP3119024  (LG ELECTRONICS INC [KR]) [A] 1-28 * entire document *;
 [A]CN106716908  (LG ELECTRONICS INC) [A] 1-28 * entire document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.