EP3656499 - LASER WELDING METHOD AND LASER WELDING TOOL DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.12.2022 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 24.12.2021 | ||
Former | Grant of patent is intended Status updated on 28.10.2021 | ||
Former | Request for examination was made Status updated on 24.04.2020 | ||
Former | The international publication has been made Status updated on 26.01.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states NOK Corporation 12-15, Shibadaimon 1-chome Minato-ku Tokyo 105-8585 / JP | [2020/22] | Inventor(s) | 01 /
SHIMAZOE, Toshihiro c/o NOK Corporation 4-3-1 Tsujido-shinmachi Fujisawa-shi Kanagawa 251-0042 / JP | 02 /
NAGAMATSU, Kento c/o NOK Corporation 4-3-1 Tsujido-shinmachi Fujisawa-shi Kanagawa 251-0042 / JP | 03 /
HIGASHI, Hiroyuki c/o NOK Corporation 4-3-1 Tsujido-shinmachi Fujisawa-shi Kanagawa 251-0042 / JP | [2020/22] | Representative(s) | TBK Bavariaring 4-6 80336 München / DE | [2020/22] | Application number, filing date | 18834803.1 | 12.07.2018 | [2020/22] | WO2018JP26271 | Priority number, date | JP20170140172 | 19.07.2017 Original published format: JP 2017140172 | [2020/22] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019017265 | Date: | 24.01.2019 | Language: | JA | [2019/04] | Type: | A1 Application with search report | No.: | EP3656499 | Date: | 27.05.2020 | Language: | EN | [2020/22] | Type: | B1 Patent specification | No.: | EP3656499 | Date: | 26.01.2022 | Language: | EN | [2022/04] | Search report(s) | International search report - published on: | JP | 24.01.2019 | (Supplementary) European search report - dispatched on: | EP | 01.06.2021 | Classification | IPC: | B23K26/10, B23K26/21, H01M8/0202, B23K26/244, B23K37/04 | [2021/26] | CPC: |
B23K37/0531 (EP);
B23K26/21 (EP,KR);
B23K26/244 (EP,US);
B23K26/10 (KR,US);
B23K26/103 (EP);
B23K37/0443 (EP,KR);
|
Former IPC [2020/22] | B23K26/10, B23K26/21, H01M8/0202 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | LASERSCHWEISSVERFAHREN UND LASERSCHWEISSWERKZEUG | [2020/22] | English: | LASER WELDING METHOD AND LASER WELDING TOOL DEVICE | [2020/22] | French: | PROCÉDÉ DE SOUDAGE AU LASER ET DISPOSITIF FORMANT OUTIL DE SOUDAGE AU LASER | [2020/22] | Entry into regional phase | 02.01.2020 | Translation filed | 02.01.2020 | National basic fee paid | 02.01.2020 | Search fee paid | 02.01.2020 | Designation fee(s) paid | 02.01.2020 | Examination fee paid | Examination procedure | 02.01.2020 | Examination requested [2020/22] | 12.08.2021 | Amendment by applicant (claims and/or description) | 29.10.2021 | Communication of intention to grant the patent | 15.12.2021 | Fee for grant paid | 15.12.2021 | Fee for publishing/printing paid | 15.12.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 27.10.2022 | No opposition filed within time limit [2023/01] | Fees paid | Renewal fee | 29.07.2020 | Renewal fee patent year 03 | 28.07.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.07.2018 | AL | 26.01.2022 | AT | 26.01.2022 | CY | 26.01.2022 | CZ | 26.01.2022 | DK | 26.01.2022 | EE | 26.01.2022 | ES | 26.01.2022 | FI | 26.01.2022 | HR | 26.01.2022 | IT | 26.01.2022 | LT | 26.01.2022 | LV | 26.01.2022 | MC | 26.01.2022 | MK | 26.01.2022 | NL | 26.01.2022 | PL | 26.01.2022 | RO | 26.01.2022 | RS | 26.01.2022 | SE | 26.01.2022 | SI | 26.01.2022 | SK | 26.01.2022 | SM | 26.01.2022 | TR | 26.01.2022 | BG | 26.04.2022 | NO | 26.04.2022 | GR | 27.04.2022 | IS | 26.05.2022 | PT | 26.05.2022 | GB | 12.07.2022 | IE | 12.07.2022 | LU | 12.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | FR | 31.07.2022 | LI | 31.07.2022 | [2024/29] |
Former [2024/24] | HU | 12.07.2018 | |
AL | 26.01.2022 | ||
AT | 26.01.2022 | ||
CY | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
MK | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
GB | 12.07.2022 | ||
IE | 12.07.2022 | ||
LU | 12.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2024/23] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CY | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
MK | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
GB | 12.07.2022 | ||
IE | 12.07.2022 | ||
LU | 12.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2024/20] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CY | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
GB | 12.07.2022 | ||
IE | 12.07.2022 | ||
LU | 12.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/35] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
GB | 12.07.2022 | ||
IE | 12.07.2022 | ||
LU | 12.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/33] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
GB | 12.07.2022 | ||
IE | 12.07.2022 | ||
LU | 12.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/27] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
GB | 12.07.2022 | ||
LU | 12.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/25] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
LU | 12.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/22] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
LU | 12.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/21] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
LU | 12.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/11] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/10] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/01] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/49] | AT | 26.01.2022 | |
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/48] | AT | 26.01.2022 | |
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/47] | AT | 26.01.2022 | |
DK | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/46] | AT | 26.01.2022 | |
DK | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/42] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/39] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/36] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
NL | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/35] | ES | 26.01.2022 | |
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
NL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/34] | ES | 26.01.2022 | |
LT | 26.01.2022 | ||
NL | 26.01.2022 | ||
NO | 26.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/33] | LT | 26.01.2022 | |
NL | 26.01.2022 | ||
NO | 26.04.2022 | ||
Former [2022/30] | NL | 26.01.2022 | Documents cited: | Search | [A]DE102007056717 (GESMEX GMBH [DE]) [A] 1,3* column 3, line 41 - line 58; figure 1 * | International search | [A]JPH0468 (TAIHO KOGYO CO LTD, et al) [A] 1-4 * , *; | [A]JP2010129289 (NISSAN MOTOR) [A] 1-4 * , *; | [A]JP2014194876 (NGK SPARK PLUG CO) [A] 1-4* , * | by applicant | JP2011161450 | JP2014194876 |