EP3740390 - HYBRID WORK VEHICLE HAVING A CVT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.07.2023 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 29.07.2022 | ||
Former | Grant of patent is intended Status updated on 10.05.2022 | ||
Former | Request for examination was made Status updated on 23.10.2020 | ||
Former | The international publication has been made Status updated on 27.07.2019 | ||
Former | unknown Status updated on 30.01.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC, TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Ecothea S.r.l. Corso Castelfidardo, 30/A 10129 Torino / IT | [2020/48] | Inventor(s) | 01 /
SOMA', Aurelio Viale Piave, 1 12038 Savigliano (CN) / IT | [2020/48] | Representative(s) | Mola, Edoardo Praxi Intellectual Property S.p.A. Corso Vittorio Emanuele II, 3 10125 Torino / IT | [2020/48] | Application number, filing date | 18836519.1 | 13.12.2018 | [2020/48] | WO2018IB59994 | Priority number, date | IT20180001308 | 18.01.2018 Original published format: IT201800001308 | [2020/48] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019142036 | Date: | 25.07.2019 | Language: | EN | [2019/30] | Type: | A1 Application with search report | No.: | EP3740390 | Date: | 25.11.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.07.2019 takes the place of the publication of the European patent application. | [2020/48] | Type: | B1 Patent specification | No.: | EP3740390 | Date: | 31.08.2022 | Language: | EN | [2022/35] | Search report(s) | International search report - published on: | EP | 25.07.2019 | Classification | IPC: | F16H37/10, // F16H37/08 | [2022/18] | CPC: |
B60K6/445 (EP);
B60K25/02 (EP);
B60K6/365 (EP);
B60K6/383 (EP);
B60K6/387 (EP);
B60Y2200/221 (EP);
|
Former IPC [2020/48] | B60K6/445, B60K6/365, B60K25/02, B60K6/383, B60K6/387 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/48] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | HYBRIDARBEITSFAHRZEUG MIT CVT | [2020/48] | English: | HYBRID WORK VEHICLE HAVING A CVT | [2020/48] | French: | ENGIN DE CHANTIER HYBRIDE À TRANSMISSION À VARIATION CONTINUE | [2020/48] | Entry into regional phase | 10.07.2020 | National basic fee paid | 10.07.2020 | Designation fee(s) paid | 10.07.2020 | Examination fee paid | Examination procedure | 10.07.2020 | Examination requested [2020/48] | 10.07.2020 | Date on which the examining division has become responsible | 04.03.2021 | Amendment by applicant (claims and/or description) | 11.05.2022 | Communication of intention to grant the patent | 25.07.2022 | Fee for grant paid | 25.07.2022 | Fee for publishing/printing paid | 25.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 01.06.2023 | No opposition filed within time limit [2023/32] | Fees paid | Renewal fee | 31.12.2020 | Renewal fee patent year 03 | 26.12.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.12.2018 | AL | 31.08.2022 | AT | 31.08.2022 | CY | 31.08.2022 | CZ | 31.08.2022 | DK | 31.08.2022 | EE | 31.08.2022 | ES | 31.08.2022 | FI | 31.08.2022 | HR | 31.08.2022 | IT | 31.08.2022 | LT | 31.08.2022 | LV | 31.08.2022 | MC | 31.08.2022 | MK | 31.08.2022 | NL | 31.08.2022 | PL | 31.08.2022 | RO | 31.08.2022 | RS | 31.08.2022 | SE | 31.08.2022 | SI | 31.08.2022 | SK | 31.08.2022 | SM | 31.08.2022 | TR | 31.08.2022 | NO | 30.11.2022 | GR | 01.12.2022 | GB | 13.12.2022 | IE | 13.12.2022 | LU | 13.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | FR | 31.12.2022 | IS | 31.12.2022 | LI | 31.12.2022 | PT | 02.01.2023 | [2024/29] |
Former [2024/27] | HU | 13.12.2018 | |
AL | 31.08.2022 | ||
AT | 31.08.2022 | ||
CY | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
IT | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
MK | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 13.12.2022 | ||
IE | 13.12.2022 | ||
LU | 13.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2024/26] | HU | 13.12.2018 | |
AL | 31.08.2022 | ||
AT | 31.08.2022 | ||
CY | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
IT | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 13.12.2022 | ||
IE | 13.12.2022 | ||
LU | 13.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2024/24] | HU | 13.12.2018 | |
AL | 31.08.2022 | ||
AT | 31.08.2022 | ||
CY | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 13.12.2022 | ||
IE | 13.12.2022 | ||
LU | 13.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2024/21] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CY | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 13.12.2022 | ||
IE | 13.12.2022 | ||
LU | 13.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/52] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 13.12.2022 | ||
IE | 13.12.2022 | ||
LU | 13.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/49] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 13.12.2022 | ||
IE | 13.12.2022 | ||
LU | 13.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/48] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 13.12.2022 | ||
IE | 13.12.2022 | ||
LU | 13.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/47] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
GB | 13.12.2022 | ||
LU | 13.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/38] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
LU | 13.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/37] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/30] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/29] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/23] | AT | 31.08.2022 | |
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/22] | AT | 31.08.2022 | |
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/21] | DK | 31.08.2022 | |
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
Former [2023/20] | FI | 31.08.2022 | |
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
Former [2023/12] | FI | 31.08.2022 | |
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
Former [2023/11] | FI | 31.08.2022 | |
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
Former [2023/10] | FI | 31.08.2022 | |
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
Former [2023/09] | FI | 31.08.2022 | |
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | ||
Former [2023/08] | FI | 31.08.2022 | |
LT | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | Cited in | International search | [YA]JP2009241830 (KOMATSU MFG CO LTD) [Y] 1,2,4-10 * abstract * [A] 3; | [XDI]WO2011101726 (MOVIMATICA SRL [IT], et al) [XD] 1,2 * the whole document * [I] 4-10; | [A]CN105922857 (WUXI KIPOR MACHINERY CO LTD) [A] 1-10* figure 1 *; | [Y]US2017001630 (LINDSTROM JOHAN [SE], et al) [Y] 1,2,4-10 * figure 3 * | Examination | EP0375798 |