EP3656178 - DUAL-CONNECTIVITY ESTABLISHMENT METHOD AND DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.02.2023 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 18.03.2022 | ||
Former | Grant of patent is intended Status updated on 22.02.2022 | ||
Former | Examination is in progress Status updated on 18.12.2020 | ||
Former | Request for examination was made Status updated on 24.04.2020 | ||
Former | The international publication has been made Status updated on 16.02.2019 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do 16677 / KR | [2020/22] | Inventor(s) | 01 /
WANG, Hong 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do 16677 / KR | 02 /
XU, Lixiang 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do 16677 / KR | 03 /
KE, Xiaowan 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do 16677 / KR | [2020/22] | Representative(s) | Gulde & Partner Patent- und Rechtsanwaltskanzlei mbB Wallstraße 58/59 10179 Berlin / DE | [2020/22] | Application number, filing date | 18843558.0 | 10.08.2018 | [2020/22] | WO2018KR09177 | Priority number, date | CN201710683643 | 11.08.2017 Original published format: CN201710683643 | [2020/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019031915 | Date: | 14.02.2019 | Language: | EN | [2019/07] | Type: | A1 Application with search report | No.: | EP3656178 | Date: | 27.05.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.02.2019 takes the place of the publication of the European patent application. | [2020/22] | Type: | B1 Patent specification | No.: | EP3656178 | Date: | 20.04.2022 | Language: | EN | [2022/16] | Search report(s) | International search report - published on: | KR | 14.02.2019 | (Supplementary) European search report - dispatched on: | EP | 08.07.2020 | Classification | IPC: | H04W76/15, H04W28/02, H04W28/24 | [2020/32] | CPC: |
H04W76/15 (EP,CN,KR,US);
H04W28/02 (EP);
H04W28/0252 (KR);
H04W28/0257 (US);
H04W76/11 (CN,US);
H04W76/12 (CN,US);
H04W76/27 (US);
H04W80/08 (US);
H04W88/06 (EP);
|
Former IPC [2020/22] | H04W76/15, H04W28/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR HERSTELLUNG VON DUALER KONNEKTIVITÄT | [2020/22] | English: | DUAL-CONNECTIVITY ESTABLISHMENT METHOD AND DEVICE | [2020/22] | French: | PROCÉDÉ ET DISPOSITIF D'ÉTABLISSEMENT DE CONNECTIVITÉ DOUBLE | [2020/22] | Entry into regional phase | 20.02.2020 | National basic fee paid | 20.02.2020 | Search fee paid | 20.02.2020 | Designation fee(s) paid | 20.02.2020 | Examination fee paid | Examination procedure | 20.02.2020 | Examination requested [2020/22] | 08.09.2020 | Amendment by applicant (claims and/or description) | 17.12.2020 | Despatch of a communication from the examining division (Time limit: M04) | 14.04.2021 | Reply to a communication from the examining division | 03.02.2022 | Cancellation of oral proceeding that was planned for 08.02.2022 | 08.02.2022 | Date of oral proceedings (cancelled) | 23.02.2022 | Communication of intention to grant the patent | 10.03.2022 | Fee for grant paid | 10.03.2022 | Fee for publishing/printing paid | 10.03.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | EP22162883.7 / EP4037424 | EP24152888.4 / EP4333556 | Opposition(s) | 23.01.2023 | No opposition filed within time limit [2023/13] | Fees paid | Renewal fee | 21.08.2020 | Renewal fee patent year 03 | 24.08.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.08.2018 | AL | 20.04.2022 | AT | 20.04.2022 | CY | 20.04.2022 | CZ | 20.04.2022 | DK | 20.04.2022 | EE | 20.04.2022 | ES | 20.04.2022 | FI | 20.04.2022 | HR | 20.04.2022 | IT | 20.04.2022 | LT | 20.04.2022 | LV | 20.04.2022 | MC | 20.04.2022 | MK | 20.04.2022 | PL | 20.04.2022 | RO | 20.04.2022 | RS | 20.04.2022 | SE | 20.04.2022 | SI | 20.04.2022 | SK | 20.04.2022 | SM | 20.04.2022 | BG | 20.07.2022 | NO | 20.07.2022 | GR | 21.07.2022 | IE | 10.08.2022 | LU | 10.08.2022 | IS | 20.08.2022 | PT | 22.08.2022 | BE | 31.08.2022 | CH | 31.08.2022 | LI | 31.08.2022 | [2024/27] |
Former [2024/24] | HU | 10.08.2018 | |
AL | 20.04.2022 | ||
AT | 20.04.2022 | ||
CY | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
IT | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IE | 10.08.2022 | ||
LU | 10.08.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2024/21] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CY | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
IT | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IE | 10.08.2022 | ||
LU | 10.08.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2024/11] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
IT | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IE | 10.08.2022 | ||
LU | 10.08.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/42] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IE | 10.08.2022 | ||
LU | 10.08.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/33] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IE | 10.08.2022 | ||
LU | 10.08.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/25] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
LU | 10.08.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/21] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
LU | 10.08.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/17] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/16] | AT | 20.04.2022 | |
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/09] | AT | 20.04.2022 | |
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/07] | AT | 20.04.2022 | |
DK | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
PL | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2022/51] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
PL | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2022/50] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
PL | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
PT | 22.08.2022 | ||
Former [2022/49] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
PT | 22.08.2022 | ||
Former [2022/47] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
LT | 20.04.2022 | ||
SE | 20.04.2022 | ||
NO | 20.07.2022 | ||
PT | 22.08.2022 | Documents cited: | Search | [A]WO2015108291 (LG ELECTRONICS INC [KR]) [A] 1-15* paragraphs [0100] - [0276]; figures 1-18; claim 18 *; | [E]EP3656150 (SAMSUNG ELECTRONICS CO LTD [KR]) [E] 1-15 * the whole document * | International search | [A]US2016135174 (LEE INSUN [KR], et al) [A] 1-15 * See paragraphs [0094]-[0121]; and figures 6-8. *; | [A]US2016323805 (RYU JINSOOK [KR], et al) [A] 1-15 * See paragraphs [0076]-[0135]; and figures 5-9. *; | [A]US2017019821 (ZHANG XIAOWEI [JP], et al) [A] 1-15 * See paragraphs [0037]-[0040]; and figure 1. *; | [A] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; NR and NG-RAN Overall Description; Stage 2 (Release 15)", 3GPP TS 38.300 V0.6.0, (20170807), pages 1 - 58, XP055575772 [A] 1-15 * See sections A.1-A.6. * | [A] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on New Radio (NR) access technology (Release 14)", 3GPP TR 38.912 V14.0.1, (20170803), pages 1 - 74, XP055575775 [A] 1-15 * See section 13.2.2; and figure 13.2.2-1. * |