EP3668933 - WATER-BASED INKS WITH HIGH RENEWABLE CONTENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.12.2022 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 21.01.2022 | ||
Former | Grant of patent is intended Status updated on 02.09.2021 | ||
Former | Request for examination was made Status updated on 22.05.2020 | ||
Former | The international publication has been made Status updated on 22.02.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Sun Chemical Corporation 35 Waterview Boulevard Parsippany, NJ 07054 / US | [2020/26] | Inventor(s) | 01 /
DEIGHTON, Robert 3 Bankfield Grange Halifax HX4 8LJ / GB | 02 /
CARSON, Stewart 9 Brown Road Bolton BL2 6RQ / GB | [2020/26] | Representative(s) | Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | [2022/08] |
Former [2020/26] | Cockerton, Bruce Roger Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | Application number, filing date | 18845620.6 | 14.08.2018 | [2020/26] | WO2018US46616 | Priority number, date | US201762546707P | 17.08.2017 Original published format: US 201762546707 P | [2020/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019036416 | Date: | 21.02.2019 | Language: | EN | [2019/08] | Type: | A1 Application with search report | No.: | EP3668933 | Date: | 24.06.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.02.2019 takes the place of the publication of the European patent application. | [2020/26] | Type: | B1 Patent specification | No.: | EP3668933 | Date: | 23.02.2022 | Language: | EN | [2022/08] | Search report(s) | International search report - published on: | US | 21.02.2019 | (Supplementary) European search report - dispatched on: | EP | 14.04.2021 | Classification | IPC: | C09D11/02, C09D11/08, C09D193/04, C09D11/03, C09D11/107, C09D11/102 | [2021/19] | CPC: |
C09D193/04 (EP,US);
C09D11/03 (EP,US);
C09D11/08 (EP,US);
C09D11/102 (EP,US);
C09D11/107 (EP,US)
|
Former IPC [2020/26] | C09D11/02, C09D11/08, C09D193/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | WÄSSRIGE TINTEN MIT HOHEM ERNEUERBAREN GEHALT | [2020/26] | English: | WATER-BASED INKS WITH HIGH RENEWABLE CONTENT | [2020/26] | French: | ENCRES À BASE D'EAU À HAUTE TENEUR RENOUVELABLE | [2020/26] | Entry into regional phase | 03.02.2020 | National basic fee paid | 03.02.2020 | Search fee paid | 03.02.2020 | Designation fee(s) paid | 03.02.2020 | Examination fee paid | Examination procedure | 02.05.2019 | Request for preliminary examination filed International Preliminary Examining Authority: US | 03.02.2020 | Examination requested [2020/26] | 14.05.2021 | Amendment by applicant (claims and/or description) | 03.09.2021 | Communication of intention to grant the patent | 13.01.2022 | Fee for grant paid | 13.01.2022 | Fee for publishing/printing paid | 13.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 24.11.2022 | No opposition filed within time limit [2023/05] | Fees paid | Renewal fee | 19.08.2020 | Renewal fee patent year 03 | 18.08.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.08.2018 | AL | 23.02.2022 | AT | 23.02.2022 | CY | 23.02.2022 | CZ | 23.02.2022 | DK | 23.02.2022 | EE | 23.02.2022 | FI | 23.02.2022 | HR | 23.02.2022 | LT | 23.02.2022 | LV | 23.02.2022 | MC | 23.02.2022 | MK | 23.02.2022 | NL | 23.02.2022 | PL | 23.02.2022 | RO | 23.02.2022 | RS | 23.02.2022 | SE | 23.02.2022 | SI | 23.02.2022 | SK | 23.02.2022 | SM | 23.02.2022 | TR | 23.02.2022 | BG | 23.05.2022 | NO | 23.05.2022 | GR | 24.05.2022 | IS | 23.06.2022 | PT | 23.06.2022 | IE | 14.08.2022 | LU | 14.08.2022 | BE | 31.08.2022 | CH | 31.08.2022 | LI | 31.08.2022 | [2024/29] |
Former [2024/27] | HU | 14.08.2018 | |
AL | 23.02.2022 | ||
AT | 23.02.2022 | ||
CY | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
MK | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 14.08.2022 | ||
LU | 14.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2024/24] | HU | 14.08.2018 | |
AL | 23.02.2022 | ||
AT | 23.02.2022 | ||
CY | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 14.08.2022 | ||
LU | 14.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2024/21] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CY | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 14.08.2022 | ||
LU | 14.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/42] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 14.08.2022 | ||
LU | 14.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/33] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 14.08.2022 | ||
LU | 14.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/21] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
LU | 14.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/16] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/10] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/01] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/49] | AT | 23.02.2022 | |
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/48] | AT | 23.02.2022 | |
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/47] | AT | 23.02.2022 | |
DK | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/46] | AT | 23.02.2022 | |
DK | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/42] | AT | 23.02.2022 | |
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/39] | AT | 23.02.2022 | |
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/36] | AT | 23.02.2022 | |
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/35] | HR | 23.02.2022 | |
LT | 23.02.2022 | ||
NL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/34] | LT | 23.02.2022 | |
NL | 23.02.2022 | ||
NO | 23.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/33] | LT | 23.02.2022 | |
NO | 23.05.2022 | Documents cited: | Search | [A]US2006219130 (ALLISON CYNTHIA L [US], et al) [A] 1-15 * example -; claim - *; | [A]WO2016028850 (SUN CHEMICAL CORP [US]) [A] 1-15* example -; claim - * | International search | [A]US3274141 (GUSTAV PIEPER, et al) [A] 1-3, 4/1-3* ; entire document *; | [Y]US2006086285 (WILLIAMS BARRY [US]) [Y] 2-3, 4/2-3 * ; paragraphs [0019]-[0021] *; | [XY]WO2009068462 (CIBA HOLDING INC [CH], et al) [X] 1, 4/1 * ; page 22, lines 21-27; page 23, lines 16-17; page 25, lines 20-29; page 26, lines 26-28; page 28, lines 24-25; page 61, lines 22-24; page 62, lines 16-28; page 67, lines 1-20 * [Y] 2-3, 4/2-3 | by applicant | US8383705 | US8519022 | US9382659 |