| EP3672327 - METHOD AND DEVICE FOR PROCESSING NON-MATCHING BETWEEN UE AND NETWORK STATE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.08.2023 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 02.09.2022 | ||
| Former | Grant of patent is intended Status updated on 03.03.2022 | ||
| Former | Examination is in progress Status updated on 17.09.2021 | ||
| Former | Request for examination was made Status updated on 01.09.2021 | ||
| Former | Grant of patent is intended Status updated on 30.06.2021 | ||
| Former | Request for examination was made Status updated on 22.05.2020 | ||
| Former | The international publication has been made Status updated on 22.02.2019 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Datang Mobile Communications Equipment Co., Ltd. 1/F, Building 1, No. 5 Shangdi East Road Haidian District Beijing 100085 / CN | [2021/44] |
| Former [2020/26] | For all designated states China Academy of Telecommunications Technology No. 40 Xue Yuan Road Hai Dian District Beijing 100191 / CN | Inventor(s) | 01 /
WANG, Hucheng No. 40 Xueyuan Rd. Haidian District Beijing 100191 / CN | [2020/26] | Representative(s) | Ipsilon 11 rue Saint-Georges 75009 Paris / FR | [N/P] |
| Former [2020/26] | Nony 11 rue Saint-Georges 75009 Paris / FR | Application number, filing date | 18846130.5 | 03.08.2018 | [2020/26] | WO2018CN98683 | Priority number, date | CN201710693914 | 14.08.2017 Original published format: CN201710693914 | CN201710855403 | 20.09.2017 Original published format: CN201710855403 | [2020/26] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019033945 | Date: | 21.02.2019 | Language: | ZH | [2019/08] | Type: | A1 Application with search report | No.: | EP3672327 | Date: | 24.06.2020 | Language: | EN | [2020/26] | Type: | B1 Patent specification | No.: | EP3672327 | Date: | 05.10.2022 | Language: | EN | [2022/40] | Search report(s) | International search report - published on: | CN | 21.02.2019 | (Supplementary) European search report - dispatched on: | EP | 22.07.2020 | Classification | IPC: | H04W60/04, H04W76/27, H04W76/32, // H04W68/02 | [2020/34] | CPC: |
H04W60/04 (EP,KR);
H04W36/08 (CN,KR);
H04W76/25 (US);
H04W36/0011 (KR);
H04W48/16 (US);
H04W60/00 (US);
H04W68/005 (US);
H04W68/02 (EP,KR);
H04W76/27 (EP,KR,US);
H04W76/32 (EP,KR);
H04W8/08 (US);
H04W80/10 (US);
H04W36/0055 (CN)
(-)
|
| Former IPC [2020/26] | H04W36/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR VERARBEITUNG VON NICHTÜBEREINSTIMMUNG ZWISCHEN UE- UND NETZWERKZUSTAND | [2020/26] | English: | METHOD AND DEVICE FOR PROCESSING NON-MATCHING BETWEEN UE AND NETWORK STATE | [2020/26] | French: | PROCÉDÉ ET DISPOSITIF DE TRAITEMENT DE NON-CORRESPONDANCE ENTRE UN ÉQUIPEMENT UTILISATEUR ET UN ÉTAT DE RÉSEAU | [2020/26] | Entry into regional phase | 26.02.2020 | Translation filed | 26.02.2020 | National basic fee paid | 26.02.2020 | Search fee paid | 26.02.2020 | Designation fee(s) paid | 26.02.2020 | Examination fee paid | Examination procedure | 26.02.2020 | Examination requested [2020/26] | 25.01.2021 | Amendment by applicant (claims and/or description) | 01.07.2021 | Communication of intention to grant the patent | 01.09.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 21.09.2021 | Despatch of a communication from the examining division (Time limit: M04) | 16.12.2021 | Reply to a communication from the examining division | 04.03.2022 | Communication of intention to grant the patent | 01.07.2022 | Fee for grant paid | 01.07.2022 | Fee for publishing/printing paid | 01.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 06.07.2023 | No opposition filed within time limit [2023/37] | Fees paid | Renewal fee | 23.07.2020 | Renewal fee patent year 03 | 24.08.2021 | Renewal fee patent year 04 | 25.08.2022 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 03.08.2018 | HU | 03.08.2018 | AL | 05.10.2022 | AT | 05.10.2022 | BG | 05.10.2022 | CZ | 05.10.2022 | DK | 05.10.2022 | EE | 05.10.2022 | ES | 05.10.2022 | FI | 05.10.2022 | HR | 05.10.2022 | IT | 05.10.2022 | LT | 05.10.2022 | LV | 05.10.2022 | MC | 05.10.2022 | NL | 05.10.2022 | PL | 05.10.2022 | RO | 05.10.2022 | RS | 05.10.2022 | SE | 05.10.2022 | SI | 05.10.2022 | SK | 05.10.2022 | SM | 05.10.2022 | TR | 05.10.2022 | NO | 05.01.2023 | GR | 06.01.2023 | IS | 05.02.2023 | PT | 06.02.2023 | [2026/04] |
| Former [2025/39] | CY | 03.08.2018 | |
| HU | 03.08.2018 | ||
| AL | 05.10.2022 | ||
| AT | 05.10.2022 | ||
| BG | 05.10.2022 | ||
| CZ | 05.10.2022 | ||
| DK | 05.10.2022 | ||
| EE | 05.10.2022 | ||
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| HR | 05.10.2022 | ||
| IT | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| MC | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| PL | 05.10.2022 | ||
| RO | 05.10.2022 | ||
| RS | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| SI | 05.10.2022 | ||
| SK | 05.10.2022 | ||
| SM | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| IS | 05.02.2023 | ||
| PT | 06.02.2023 | ||
| Former [2025/36] | CY | 03.08.2018 | |
| AL | 05.10.2022 | ||
| AT | 05.10.2022 | ||
| BG | 05.10.2022 | ||
| CZ | 05.10.2022 | ||
| DK | 05.10.2022 | ||
| EE | 05.10.2022 | ||
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| HR | 05.10.2022 | ||
| IT | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| MC | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| PL | 05.10.2022 | ||
| RO | 05.10.2022 | ||
| RS | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| SI | 05.10.2022 | ||
| SK | 05.10.2022 | ||
| SM | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| IS | 05.02.2023 | ||
| PT | 06.02.2023 | ||
| Former [2024/51] | AL | 05.10.2022 | |
| AT | 05.10.2022 | ||
| BG | 05.10.2022 | ||
| CZ | 05.10.2022 | ||
| DK | 05.10.2022 | ||
| EE | 05.10.2022 | ||
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| HR | 05.10.2022 | ||
| IT | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| MC | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| PL | 05.10.2022 | ||
| RO | 05.10.2022 | ||
| RS | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| SI | 05.10.2022 | ||
| SK | 05.10.2022 | ||
| SM | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| IS | 05.02.2023 | ||
| PT | 06.02.2023 | ||
| Former [2024/26] | AL | 05.10.2022 | |
| AT | 05.10.2022 | ||
| CZ | 05.10.2022 | ||
| DK | 05.10.2022 | ||
| EE | 05.10.2022 | ||
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| HR | 05.10.2022 | ||
| IT | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| MC | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| PL | 05.10.2022 | ||
| RO | 05.10.2022 | ||
| RS | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| SI | 05.10.2022 | ||
| SK | 05.10.2022 | ||
| SM | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| IS | 05.02.2023 | ||
| PT | 06.02.2023 | ||
| Former [2024/16] | AL | 05.10.2022 | |
| AT | 05.10.2022 | ||
| CZ | 05.10.2022 | ||
| DK | 05.10.2022 | ||
| EE | 05.10.2022 | ||
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| HR | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| MC | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| PL | 05.10.2022 | ||
| RO | 05.10.2022 | ||
| RS | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| SI | 05.10.2022 | ||
| SK | 05.10.2022 | ||
| SM | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| IS | 05.02.2023 | ||
| PT | 06.02.2023 | ||
| Former [2023/51] | AL | 05.10.2022 | |
| AT | 05.10.2022 | ||
| CZ | 05.10.2022 | ||
| DK | 05.10.2022 | ||
| EE | 05.10.2022 | ||
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| HR | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| PL | 05.10.2022 | ||
| RO | 05.10.2022 | ||
| RS | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| SI | 05.10.2022 | ||
| SK | 05.10.2022 | ||
| SM | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| IS | 05.02.2023 | ||
| PT | 06.02.2023 | ||
| Former [2023/38] | AL | 05.10.2022 | |
| AT | 05.10.2022 | ||
| CZ | 05.10.2022 | ||
| DK | 05.10.2022 | ||
| EE | 05.10.2022 | ||
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| HR | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| PL | 05.10.2022 | ||
| RO | 05.10.2022 | ||
| RS | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| SK | 05.10.2022 | ||
| SM | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| IS | 05.02.2023 | ||
| PT | 06.02.2023 | ||
| Former [2023/37] | AL | 05.10.2022 | |
| AT | 05.10.2022 | ||
| CZ | 05.10.2022 | ||
| DK | 05.10.2022 | ||
| EE | 05.10.2022 | ||
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| HR | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| PL | 05.10.2022 | ||
| RO | 05.10.2022 | ||
| RS | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| SM | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| IS | 05.02.2023 | ||
| PT | 06.02.2023 | ||
| Former [2023/35] | AT | 05.10.2022 | |
| CZ | 05.10.2022 | ||
| DK | 05.10.2022 | ||
| EE | 05.10.2022 | ||
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| HR | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| PL | 05.10.2022 | ||
| RO | 05.10.2022 | ||
| RS | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| SM | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| IS | 05.02.2023 | ||
| PT | 06.02.2023 | ||
| Former [2023/34] | AT | 05.10.2022 | |
| DK | 05.10.2022 | ||
| EE | 05.10.2022 | ||
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| HR | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| PL | 05.10.2022 | ||
| RS | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| SM | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| IS | 05.02.2023 | ||
| PT | 06.02.2023 | ||
| Former [2023/33] | AT | 05.10.2022 | |
| DK | 05.10.2022 | ||
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| HR | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| PL | 05.10.2022 | ||
| RS | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| SM | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| IS | 05.02.2023 | ||
| PT | 06.02.2023 | ||
| Former [2023/25] | AT | 05.10.2022 | |
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| HR | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| PL | 05.10.2022 | ||
| RS | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| IS | 05.02.2023 | ||
| PT | 06.02.2023 | ||
| Former [2023/23] | AT | 05.10.2022 | |
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| LV | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| GR | 06.01.2023 | ||
| PT | 06.02.2023 | ||
| Former [2023/22] | AT | 05.10.2022 | |
| ES | 05.10.2022 | ||
| FI | 05.10.2022 | ||
| LT | 05.10.2022 | ||
| NL | 05.10.2022 | ||
| SE | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| PT | 06.02.2023 | ||
| Former [2023/20] | LT | 05.10.2022 | |
| NL | 05.10.2022 | ||
| NO | 05.01.2023 | ||
| Former [2023/17] | NL | 05.10.2022 | Documents cited: | Search | [XAI] WO2016070936 (ERICSSON TELEFON AB L M et al.) [X] 1,11,15 * page 29, line 6 - page 32, line 25 *[A] 9 [I] 2-8,10,12-14 | [A] EP2557890 (RESEARCH IN MOTION LTD et al.) [A] 1-15 * paragraph [0144] - paragraph [0180] * | [XAI] "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study of system level impacts due to introduction of light connection for LTE in EPS (Release 15)", 3GPP STANDARD ; TECHNICAL REPORT ; 3GPP TR 23.723, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. SA WG2, no. V0.2.0, 1 June 2017 (2017-06-01), pages 1 - 36, XP051298316 [X] 1,11,15 * page 31, line 17 - page 32, line last; figures 6.17.1-1 *[A] 9 [I] 2-8,10,12-14 | [XAI] HUAWEI ET AL: "Update to procedures to support UE location change notification", vol. SA WG2, no. San Jose Del Cabo, Mexico; 20170626 - 20170630, 25 June 2017 (2017-06-25), XP051303182, Retrieved from the Internet | International search | [A] CN101094096 (HUAWEI TECH CO LTD et al.) [A] 1-22 | [A] CN106658758 (BEIJING XIAOMI MOBILE SOFTWARE CO LTD et al.) [A] 1-22 | [A] CN102595534 (HUAWEI TECH CO LTD et al.) [A] 1-22 | [A] US2017230869 (KUBOTA KEIICHI et al.) [A] 1-22 | [A] US2016234877 (BANGOLAE SANGEETHA L et al.) [A] 1-22 | by applicant | CN201710693914 | CN201710855403 |