EP3676491 - AIR-DRIVEN GENERATOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.12.2022 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 24.12.2021 | ||
Former | Grant of patent is intended Status updated on 02.09.2021 | ||
Former | Request for examination was made Status updated on 05.06.2020 | ||
Former | The international publication has been made Status updated on 08.03.2019 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states Maynard, Mark, J. 16 Fairfield Avenue Easthampton, MA 01027 / US | [2020/28] | Inventor(s) | 01 /
see applicant ... | [2020/28] | Representative(s) | Kaminski Harmann Patentanwälte AG Landstrasse 124 9490 Vaduz / LI | [2020/28] | Application number, filing date | 18850618.2 | 28.08.2018 | [2020/28] | WO2018US48413 | Priority number, date | US201762550836P | 28.08.2017 Original published format: US 201762550836 P | [2020/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019046348 | Date: | 07.03.2019 | Language: | EN | [2019/10] | Type: | A1 Application with search report | No.: | EP3676491 | Date: | 08.07.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.03.2019 takes the place of the publication of the European patent application. | [2020/28] | Type: | B1 Patent specification | No.: | EP3676491 | Date: | 26.01.2022 | Language: | EN | [2022/04] | Search report(s) | International search report - published on: | US | 07.03.2019 | (Supplementary) European search report - dispatched on: | EP | 03.12.2020 | Classification | IPC: | F03B17/00, F03D9/28, F03D9/25, F03B17/02, F04F1/18 | [2021/37] | CPC: |
F03B17/005 (EP,KR,US);
F03B17/02 (EP,KR,US);
F03D9/11 (KR,US);
F03D9/14 (KR,US);
F03D9/17 (KR,US);
F03D9/25 (EP,KR,US);
F03D9/28 (EP,KR,US);
F04F1/18 (EP);
F05B2210/18 (EP,KR,US);
F05B2210/401 (EP,KR,US);
F05B2250/72 (EP);
Y02E10/20 (KR);
|
Former IPC [2021/01] | F03B17/00, F03B17/02, F03D9/25, F03D9/28 | ||
Former IPC [2020/28] | F03B17/00, F03G3/00, F03G7/00, F01K25/00, F01K27/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/28] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | LUFTBETRIEBENER GENERATOR | [2020/28] | English: | AIR-DRIVEN GENERATOR | [2020/28] | French: | GÉNÉRATEUR ENTRAÎNÉ PAR AIR | [2020/28] | Entry into regional phase | 17.03.2020 | National basic fee paid | 17.03.2020 | Search fee paid | 17.03.2020 | Designation fee(s) paid | 17.03.2020 | Examination fee paid | Examination procedure | 17.03.2020 | Examination requested [2020/28] | 22.06.2021 | Amendment by applicant (claims and/or description) | 03.09.2021 | Communication of intention to grant the patent | 20.12.2021 | Fee for grant paid | 20.12.2021 | Fee for publishing/printing paid | 20.12.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP22153119.7 / EP4039964 | Opposition(s) | 27.10.2022 | No opposition filed within time limit [2023/01] | Fees paid | Renewal fee | 17.03.2020 | Renewal fee patent year 03 | 27.08.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.08.2018 | AL | 26.01.2022 | AT | 26.01.2022 | CY | 26.01.2022 | CZ | 26.01.2022 | DK | 26.01.2022 | EE | 26.01.2022 | ES | 26.01.2022 | FI | 26.01.2022 | HR | 26.01.2022 | IT | 26.01.2022 | LT | 26.01.2022 | LV | 26.01.2022 | MC | 26.01.2022 | MK | 26.01.2022 | PL | 26.01.2022 | RO | 26.01.2022 | RS | 26.01.2022 | SE | 26.01.2022 | SI | 26.01.2022 | SK | 26.01.2022 | SM | 26.01.2022 | BG | 26.04.2022 | NO | 26.04.2022 | GR | 27.04.2022 | IS | 26.05.2022 | PT | 26.05.2022 | IE | 28.08.2022 | LU | 28.08.2022 | BE | 31.08.2022 | CH | 31.08.2022 | LI | 31.08.2022 | [2024/27] |
Former [2024/24] | HU | 28.08.2018 | |
AL | 26.01.2022 | ||
AT | 26.01.2022 | ||
CY | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
IE | 28.08.2022 | ||
LU | 28.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2024/21] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CY | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
IE | 28.08.2022 | ||
LU | 28.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/42] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
IE | 28.08.2022 | ||
LU | 28.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/35] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
IT | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
IE | 28.08.2022 | ||
LU | 28.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/33] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
IE | 28.08.2022 | ||
LU | 28.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/21] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
LU | 28.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/16] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
MC | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/10] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SI | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2023/01] | AL | 26.01.2022 | |
AT | 26.01.2022 | ||
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/49] | AT | 26.01.2022 | |
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SK | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/48] | AT | 26.01.2022 | |
CZ | 26.01.2022 | ||
DK | 26.01.2022 | ||
EE | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/47] | AT | 26.01.2022 | |
DK | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
PL | 26.01.2022 | ||
RO | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
SM | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/46] | AT | 26.01.2022 | |
DK | 26.01.2022 | ||
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/42] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
IS | 26.05.2022 | ||
PT | 26.05.2022 | ||
Former [2022/39] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
FI | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/36] | AT | 26.01.2022 | |
ES | 26.01.2022 | ||
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
LV | 26.01.2022 | ||
PL | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
GR | 27.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/35] | ES | 26.01.2022 | |
HR | 26.01.2022 | ||
LT | 26.01.2022 | ||
RS | 26.01.2022 | ||
SE | 26.01.2022 | ||
BG | 26.04.2022 | ||
NO | 26.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/34] | ES | 26.01.2022 | |
LT | 26.01.2022 | ||
NO | 26.04.2022 | ||
PT | 26.05.2022 | ||
Former [2022/33] | LT | 26.01.2022 | |
NO | 26.04.2022 | Documents cited: | Search | [A]JP2002235653 (TANAKA SHOJI) [A] 1-15* figure - *; | [A]US2007189111 (GARZA ROBERTO M [US]) [A] 1-15 * paragraph [0009] - paragraph [0020]; figures 1,2 *; | [A]US2010259044 (MUCHOW DAVID J [US]) [A] 1-15 * paragraph [0014] - paragraph [0042]; figure - *; | [X]WO2012017243 (GREEN ENERGY INC LTD [GB], et al) [X] 1-9,11,12,14,15 * page 4, line 34 - page 5, line 32; figure . * | International search | [YA]US4392062 (BERVIG DALE R [US]) [Y] 2 * , Entire document, especially col 6, In 46-col 7, In35, and FIG. 2. * [A] 19; | [YA]US4800727 (PETRICK MICHAEL [US]) [Y] 8 * , Entire document, especially Abstract, col 3, In 62- col 4, In 3, and FIG. 1. * [A] 6; | [A]US4947647 (JENSEN ROBERT K [US]) [A] 14 * , Entire document, especially Abstract, col 2, In 52- col 3, In 50, and FIG. 1. *; | [A]GB2318393 (NISBET JOHN STODDART JEFFREY) [A] 1-22 * , Entire document. *; | [Y]US2006236698 (LANGSON RICHARD K [US]) [Y] 22 * , Abstract, para [0027], and FIG. 2. *; | [XYA]WO2012017243 (GREEN ENERGY INC LTD [GB], et al) [X] 1, 3-5, 7, 9-13, 15-18, 20- 21 * , Entire document. * [Y] 2, 8, 22 [A] 6, 14, 19; | [A]WO2012079171 (PICARD MADDEN JOHN [CA]) [A] 1-22* , Entire document. Especially Abstract, para [0032]-[0037], and FIG. 8. * |