EP3687206 - INTEGRITY PROTECTION METHOD, TERMINAL AND BASE STATION [Right-click to bookmark this link] | Status | Examination is in progress Status updated on 04.02.2022 Database last updated on 19.10.2024 | |
Former | Request for examination was made Status updated on 26.06.2020 | ||
Former | The international publication has been made Status updated on 30.03.2019 | Most recent event Tooltip | 13.08.2024 | New entry: Renewal fee paid | Applicant(s) | For all designated states Vivo Mobile Communication Co., Ltd. 283 BBK Road Wusha Chang'An Dongguan, Guangdong 523860 / CN | [2020/31] | Inventor(s) | 01 /
YANG, Xiaodong c/o Vivo Mobile Communication., Ltd. 283 BBK Road Wusha Chang'an Dongguan Guangdong 523860 / CN | [2020/31] | Representative(s) | Lavoix Bayerstraße 83 80335 München / DE | [N/P] |
Former [2020/31] | Lavoix Bayerstrasse 83 80335 München / DE | Application number, filing date | 18858196.1 | 10.09.2018 | [2020/31] | WO2018CN104819 | Priority number, date | CN201710867732 | 22.09.2017 Original published format: CN201710867732 | [2020/31] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019056959 | Date: | 28.03.2019 | Language: | ZH | [2019/13] | Type: | A1 Application with search report | No.: | EP3687206 | Date: | 29.07.2020 | Language: | EN | [2020/31] | Search report(s) | International search report - published on: | CN | 28.03.2019 | (Supplementary) European search report - dispatched on: | EP | 25.09.2020 | Classification | IPC: | H04L29/06, H04W12/10 | [2020/44] | CPC: |
H04L63/123 (EP,CN,US);
H04W12/106 (EP,US);
H04W76/27 (US);
H04W80/02 (US)
|
Former IPC [2020/31] | H04W12/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/31] | Title | German: | INTEGRITÄTSSCHUTZVERFAHREN, ENDGERÄT UND BASISSTATION | [2020/31] | English: | INTEGRITY PROTECTION METHOD, TERMINAL AND BASE STATION | [2020/31] | French: | PROCÉDÉ DE PROTECTION D'INTÉGRITÉ, TERMINAL ET STATION DE BASE | [2020/31] | Entry into regional phase | 20.03.2020 | Translation filed | 20.03.2020 | National basic fee paid | 20.03.2020 | Search fee paid | 20.03.2020 | Designation fee(s) paid | 20.03.2020 | Examination fee paid | Examination procedure | 20.03.2020 | Examination requested [2020/31] | 14.04.2021 | Amendment by applicant (claims and/or description) | 03.02.2022 | Despatch of a communication from the examining division (Time limit: M04) | 03.06.2022 | Reply to a communication from the examining division | 15.05.2023 | Despatch of a communication from the examining division (Time limit: M04) | 15.09.2023 | Reply to a communication from the examining division | Fees paid | Renewal fee | 31.03.2020 | Renewal fee patent year 03 | 12.09.2021 | Renewal fee patent year 04 | 11.08.2022 | Renewal fee patent year 05 | 24.08.2023 | Renewal fee patent year 06 | 13.08.2024 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XI] - ZTE CORPORATION, "Consideration on the remaining security issues", vol. RAN WG2, no. Berlin, Germany; 20170821 - 20170825, (20170820), 3GPP DRAFT; R2-1708134 CONSIDERATION ON THE REMAINING SECURITY ISSUES, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ;, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170820), XP051318037 [X] 1-7,14 * page 2, paragraph 2.2 - page 4 * [I] 8-13,15 | [XI] - HUAWEI ET AL, "Integrity protection and Counter Check Procedure for NR", vol. RAN WG2, no. Hangzhou, China; 20170515 - 20170519, (20170514), 3GPP DRAFT; R2-1705170 INTEGRITY PROTECTION AND COUNTER CHECK PROCEDURE FOR NR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170514), XP051275646 [X] 8,15 * the whole document * [I] 1-7,9-14 | [XI] - ZTE CORPORATION, "Consideration on MN/UE action in case of DRB integrity protection failure", vol. RAN WG2, no. Qingdao, China; 20170627 - 20170629, (20170617), 3GPP DRAFT; R2-1706894 CONSIDERATION ON MN&UE ACTION IN CASE OF DRB INTEGRITY PROTECTION FAILURE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-0692, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_AHs/2017_06_NR/Docs/, (20170617), XP051307189 [X] 1,4,14 * the whole document * [I] 2,3,5-13,15 | [XI] - VIVO, "Further consideration on integrity check failure", vol. RAN WG2, no. Berlin, Germany; 20170821 - 20170825, (20170820), 3GPP DRAFT; R2-1708414_FURTHER CONSIDERATION ON INTEGRITY CHECK FAILURE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170820), XP051318278 [X] 1-3,14 * the whole document * [I] 4-13,15 |