EP3681130 - METHOD, DEVICE, SYSTEM AND COMPUTER-READABLE STORAGE MEDIUM FOR TRANSMITTING FIXED NETWORK PACKET [Right-click to bookmark this link] | |||
Former [2020/29] | METHOD, DEVICE, AND SYSTEM FOR TRANSMITTING FIXED NETWORK PACKET | ||
[2022/18] | Status | No opposition filed within time limit Status updated on 04.08.2023 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 26.08.2022 | ||
Former | Grant of patent is intended Status updated on 01.05.2022 | ||
Former | Request for examination was made Status updated on 12.06.2020 | ||
Former | The international publication has been made Status updated on 04.05.2019 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2020/29] | Inventor(s) | 01 /
LI, Hancheng Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2020/29] | Representative(s) | Pfenning, Meinig & Partner mbB Patent- und Rechtsanwälte Theresienhöhe 11a 80339 München / DE | [2020/29] | Application number, filing date | 18869849.2 | 17.10.2018 | [2020/29] | WO2018CN110584 | Priority number, date | CN20171112982 | 26.10.2017 Original published format: CN201711012982 | [2020/29] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019080754 | Date: | 02.05.2019 | Language: | ZH | [2019/18] | Type: | A1 Application with search report | No.: | EP3681130 | Date: | 15.07.2020 | Language: | EN | [2020/29] | Type: | B1 Patent specification | No.: | EP3681130 | Date: | 28.09.2022 | Language: | EN | [2022/39] | Search report(s) | International search report - published on: | CN | 02.05.2019 | (Supplementary) European search report - dispatched on: | EP | 08.09.2020 | Classification | IPC: | H04W80/10, H04W88/08, H04W76/12, H04L65/40, H04L12/46, // H04W88/16 | [2022/18] | CPC: |
H04W80/10 (EP);
H04L12/4633 (US);
H04L12/46 (EP);
H04L12/66 (US);
H04L67/14 (US);
H04W76/12 (EP,US);
|
Former IPC [2020/41] | H04L29/08, H04W80/10, H04W88/08, H04W88/16 | ||
Former IPC [2020/29] | H04L29/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/29] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN, VORRICHTUNG, SYSTEM UND COMPUTERLESBARES SPEICHERMEDIUM ZUR ÜBERTRAGUNG VON FESTNETZPAKETEN | [2022/18] | English: | METHOD, DEVICE, SYSTEM AND COMPUTER-READABLE STORAGE MEDIUM FOR TRANSMITTING FIXED NETWORK PACKET | [2022/18] | French: | PROCÉDÉ, DISPOSITIF, SYSTÈME ET SUPPORT DE STOCKAGE LISIBLE PAR ORDINATEUR POUR LA TRANSMISSION D'UN PAQUET DE RÉSEAU FIXE | [2022/18] |
Former [2020/29] | VERFAHREN, VORRICHTUNG UND SYSTEM ZUR ÜBERTRAGUNG VON FESTNETZPAKETEN | ||
Former [2020/29] | METHOD, DEVICE, AND SYSTEM FOR TRANSMITTING FIXED NETWORK PACKET | ||
Former [2020/29] | PROCÉDÉ, DISPOSITIF, ET SYSTÈME POUR LA TRANSMISSION D'UN PAQUET DE RÉSEAU FIXE | Entry into regional phase | 08.04.2020 | Translation filed | 08.04.2020 | National basic fee paid | 08.04.2020 | Search fee paid | 08.04.2020 | Designation fee(s) paid | 08.04.2020 | Examination fee paid | Examination procedure | 08.04.2020 | Examination requested [2020/29] | 24.03.2021 | Amendment by applicant (claims and/or description) | 02.05.2022 | Communication of intention to grant the patent | 16.08.2022 | Fee for grant paid | 16.08.2022 | Fee for publishing/printing paid | 16.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 29.06.2023 | No opposition filed within time limit [2023/36] | Fees paid | Renewal fee | 29.10.2020 | Renewal fee patent year 03 | 28.10.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.10.2018 | AL | 28.09.2022 | AT | 28.09.2022 | CY | 28.09.2022 | CZ | 28.09.2022 | DK | 28.09.2022 | EE | 28.09.2022 | ES | 28.09.2022 | FI | 28.09.2022 | HR | 28.09.2022 | IT | 28.09.2022 | LT | 28.09.2022 | LV | 28.09.2022 | MC | 28.09.2022 | MK | 28.09.2022 | NL | 28.09.2022 | PL | 28.09.2022 | RO | 28.09.2022 | RS | 28.09.2022 | SE | 28.09.2022 | SI | 28.09.2022 | SK | 28.09.2022 | SM | 28.09.2022 | IE | 17.10.2022 | LU | 17.10.2022 | BE | 31.10.2022 | CH | 31.10.2022 | LI | 31.10.2022 | FR | 28.11.2022 | NO | 28.12.2022 | GR | 29.12.2022 | IS | 28.01.2023 | PT | 30.01.2023 | DE | 03.05.2023 | [2024/27] |
Former [2024/26] | HU | 17.10.2018 | |
AL | 28.09.2022 | ||
AT | 28.09.2022 | ||
CY | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
IT | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
IE | 17.10.2022 | ||
LU | 17.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
FR | 28.11.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
DE | 03.05.2023 | ||
Former [2024/21] | HU | 17.10.2018 | |
AL | 28.09.2022 | ||
AT | 28.09.2022 | ||
CY | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
IE | 17.10.2022 | ||
LU | 17.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
FR | 28.11.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
DE | 03.05.2023 | ||
Former [2024/18] | HU | 17.10.2018 | |
AL | 28.09.2022 | ||
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
IE | 17.10.2022 | ||
LU | 17.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
FR | 28.11.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
DE | 03.05.2023 | ||
Former [2023/52] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
IE | 17.10.2022 | ||
LU | 17.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
FR | 28.11.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
DE | 03.05.2023 | ||
Former [2023/51] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
IE | 17.10.2022 | ||
LU | 17.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
DE | 03.05.2023 | ||
Former [2023/48] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
IE | 17.10.2022 | ||
LU | 17.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
DE | 03.05.2023 | ||
Former [2023/42] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
LU | 17.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
DE | 03.05.2023 | ||
Former [2023/35] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
LU | 17.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
DE | 03.05.2023 | ||
Former [2023/34] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
LU | 17.10.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/30] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
LU | 17.10.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/29] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/26] | AT | 28.09.2022 | |
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/23] | AT | 28.09.2022 | |
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
PT | 30.01.2023 | ||
Former [2023/22] | AT | 28.09.2022 | |
CZ | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
PT | 30.01.2023 | ||
Former [2023/20] | FI | 28.09.2022 | |
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
Former [2023/10] | FI | 28.09.2022 | |
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
Former [2023/09] | FI | 28.09.2022 | |
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
NO | 28.12.2022 | ||
Former [2023/08] | FI | 28.09.2022 | |
LT | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
NO | 28.12.2022 | Documents cited: | Search | [XI]EP2667678 (ZTE CORP [CN], et al) [X] 1,2,8,9,11-13 * abstract * * paragraphs [0038] - [0039] * * paragraph [0043]; figure 3 * * paragraphs [0049] - [0053]; figure 7 * * paragraphs [0055] - [0057]; figure 8 * * paragraph [0058]; figure 9 * * paragraph [0059]; figure 10 * [I] 3-7,10; | [I]WO2014111166 (NOKIA SOLUTIONS & NETWORKS OY [FI]) [I] 1-13 * abstract * * figures 1A, 1B * * page 1, lines 7-10 * * page 3, lines 1-7 * * page 4, lines 1-16 * * page 16, line 22 - page 18, line 29 * * page 21, lines 30-33 *; | [A] - "Telecommunications and Internet Converged Services and Protocols for Advanced Networking (TISPAN); Fixed Mobile Convergence; Requirements Analysis", no. ; 20070301, (20070727), 3GPP DRAFT; 14BTD372R1 WI01038 V-0-0-14 OUPUT CL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fsa/WG1%5FServ/WG%5Flegacy%5Ffolders/Joint%5Fmeetings/07%5F07%5FJoint%5FSA1%5FWG1/tdocs/, (20070727), XP051405986 [A] 1-13 * section 6.2 "Fixed Wireless"; page 16 * |