blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3689071

EP3689071 - CORRESPONDING CONFIGURATION FOR SIMULTANEOUS PHYSICAL UPLINK CONTROL CHANNEL PUCCH AND PHYSICAL UPLINK SHARED CHANNEL PUSCH TRANSMISSION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.04.2024
Database last updated on 16.09.2024
FormerThe patent has been granted
Status updated on  12.05.2023
FormerGrant of patent is intended
Status updated on  20.02.2023
FormerExamination is in progress
Status updated on  29.04.2022
FormerRequest for examination was made
Status updated on  03.07.2020
FormerThe international publication has been made
Status updated on  28.05.2019
Most recent event   Tooltip19.07.2024Lapse of the patent in a contracting state
New state(s): CH, LU
published on 21.08.2024  [2024/34]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (Publ)
164 83 Stockholm / SE
[2023/24]
Former [2020/32]For all designated states
Telefonaktiebolaget LM Ericsson (Publ)
164 83 Stockholm / SE
Inventor(s)01 / LIU, Jinhua
No. 5 Lize East Street
Chaoyang District
Beijing 100102 / CN
02 / WANG, Min
Granitstigen 27
977 53 Luleaa / SE
 [2020/32]
Representative(s)Ericsson
Patent Development
Torshamnsgatan 21-23
164 80 Stockholm / SE
[2023/24]
Former [2020/32]Haseltine Lake Kempner LLP
Redcliff Quay
120 Redcliff Street
Bristol BS1 6HU / GB
Application number, filing date18877450.908.11.2018
[2020/32]
WO2018CN114569
Priority number, dateWO2017CN11112615.11.2017         Original published format: PCT/CN2017/111126
[2020/32]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019096059
Date:23.05.2019
Language:EN
[2019/21]
Type: A1 Application with search report 
No.:EP3689071
Date:05.08.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 23.05.2019 takes the place of the publication of the European patent application.
[2020/32]
Type: B1 Patent specification 
No.:EP3689071
Date:14.06.2023
Language:EN
[2023/24]
Search report(s)International search report - published on:CN23.05.2019
(Supplementary) European search report - dispatched on:EP13.10.2020
ClassificationIPC:H04L5/00, H04W72/04, H04W52/36, H04W52/32, // H04W76/20
[2020/46]
CPC:
H04W52/365 (EP); H04W72/21 (US); H04L5/001 (EP);
H04L5/0044 (EP); H04L5/0053 (EP); H04L5/0069 (EP);
H04L5/0091 (EP); H04W52/325 (EP); H04L5/0007 (EP);
H04W76/20 (EP) (-)
Former IPC [2020/32]H04W72/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/32]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:ENTSPRECHENDE KONFIGURATION ZUR GLEICHZEITIGEN ÜBERTRAGUNG EINES PHYSIKALISCHEN UPLINK-STEUERKANALS PUCCH UND EINES GEMEINSAMEN PHYSIKALISCHEN UPLINK-KANALS PUSCH[2020/32]
English:CORRESPONDING CONFIGURATION FOR SIMULTANEOUS PHYSICAL UPLINK CONTROL CHANNEL PUCCH AND PHYSICAL UPLINK SHARED CHANNEL PUSCH TRANSMISSION[2020/32]
French:CONFIGURATION CORRESPONDANTE POUR TRANSMISSION SIMULTANÉE D'UN CANAL PHYSIQUE DE COMMANDE DE LIAISON MONTANTE PUCCH ET D'UN CANAL PHYSIQUE PARTAGÉ DE LIAISON MONTANTE PUSCH[2020/32]
Entry into regional phase29.04.2020National basic fee paid 
29.04.2020Search fee paid 
29.04.2020Designation fee(s) paid 
29.04.2020Examination fee paid 
Examination procedure29.04.2020Examination requested  [2020/32]
07.04.2021Amendment by applicant (claims and/or description)
02.05.2022Despatch of a communication from the examining division (Time limit: M04)
29.06.2022Reply to a communication from the examining division
21.02.2023Communication of intention to grant the patent
05.05.2023Fee for grant paid
05.05.2023Fee for publishing/printing paid
05.05.2023Receipt of the translation of the claim(s)
Opposition(s)15.03.2024No opposition filed within time limit [2024/21]
Fees paidRenewal fee
27.11.2020Renewal fee patent year 03
29.11.2021Renewal fee patent year 04
28.11.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT14.06.2023
CZ14.06.2023
DK14.06.2023
EE14.06.2023
ES14.06.2023
FI14.06.2023
HR14.06.2023
IT14.06.2023
LT14.06.2023
LV14.06.2023
MC14.06.2023
NL14.06.2023
PL14.06.2023
RO14.06.2023
RS14.06.2023
SE14.06.2023
SI14.06.2023
SK14.06.2023
SM14.06.2023
NO14.09.2023
GR15.09.2023
IS14.10.2023
PT16.10.2023
LU08.11.2023
CH30.11.2023
[2024/34]
Former [2024/32]AT14.06.2023
CZ14.06.2023
DK14.06.2023
EE14.06.2023
ES14.06.2023
FI14.06.2023
HR14.06.2023
IT14.06.2023
LT14.06.2023
LV14.06.2023
MC14.06.2023
NL14.06.2023
PL14.06.2023
RO14.06.2023
RS14.06.2023
SE14.06.2023
SI14.06.2023
SK14.06.2023
SM14.06.2023
NO14.09.2023
GR15.09.2023
IS14.10.2023
PT16.10.2023
Former [2024/26]AT14.06.2023
CZ14.06.2023
DK14.06.2023
EE14.06.2023
ES14.06.2023
FI14.06.2023
HR14.06.2023
IT14.06.2023
LT14.06.2023
LV14.06.2023
NL14.06.2023
PL14.06.2023
RO14.06.2023
RS14.06.2023
SE14.06.2023
SI14.06.2023
SK14.06.2023
SM14.06.2023
NO14.09.2023
GR15.09.2023
IS14.10.2023
PT16.10.2023
Former [2024/24]AT14.06.2023
CZ14.06.2023
DK14.06.2023
EE14.06.2023
ES14.06.2023
FI14.06.2023
HR14.06.2023
LT14.06.2023
LV14.06.2023
NL14.06.2023
PL14.06.2023
RO14.06.2023
RS14.06.2023
SE14.06.2023
SI14.06.2023
SK14.06.2023
SM14.06.2023
NO14.09.2023
GR15.09.2023
IS14.10.2023
PT16.10.2023
Former [2024/22]AT14.06.2023
CZ14.06.2023
DK14.06.2023
EE14.06.2023
ES14.06.2023
FI14.06.2023
HR14.06.2023
LT14.06.2023
LV14.06.2023
NL14.06.2023
PL14.06.2023
RO14.06.2023
RS14.06.2023
SE14.06.2023
SK14.06.2023
SM14.06.2023
NO14.09.2023
GR15.09.2023
IS14.10.2023
PT16.10.2023
Former [2024/10]AT14.06.2023
CZ14.06.2023
EE14.06.2023
ES14.06.2023
FI14.06.2023
HR14.06.2023
LT14.06.2023
LV14.06.2023
NL14.06.2023
PL14.06.2023
RO14.06.2023
RS14.06.2023
SE14.06.2023
SK14.06.2023
SM14.06.2023
NO14.09.2023
GR15.09.2023
IS14.10.2023
PT16.10.2023
Former [2024/09]AT14.06.2023
CZ14.06.2023
ES14.06.2023
FI14.06.2023
HR14.06.2023
LT14.06.2023
LV14.06.2023
NL14.06.2023
RS14.06.2023
SE14.06.2023
SK14.06.2023
SM14.06.2023
NO14.09.2023
GR15.09.2023
IS14.10.2023
Former [2024/08]ES14.06.2023
FI14.06.2023
HR14.06.2023
LT14.06.2023
LV14.06.2023
NL14.06.2023
RS14.06.2023
SE14.06.2023
SK14.06.2023
SM14.06.2023
NO14.09.2023
GR15.09.2023
Former [2024/03]ES14.06.2023
FI14.06.2023
HR14.06.2023
LT14.06.2023
LV14.06.2023
NL14.06.2023
RS14.06.2023
SE14.06.2023
NO14.09.2023
GR15.09.2023
Former [2024/01]ES14.06.2023
HR14.06.2023
LT14.06.2023
LV14.06.2023
NL14.06.2023
RS14.06.2023
SE14.06.2023
NO14.09.2023
GR15.09.2023
Former [2023/52]ES14.06.2023
HR14.06.2023
NL14.06.2023
RS14.06.2023
SE14.06.2023
NO14.09.2023
GR15.09.2023
Former [2023/51]ES14.06.2023
HR14.06.2023
RS14.06.2023
SE14.06.2023
NO14.09.2023
GR15.09.2023
Former [2023/50]ES14.06.2023
SE14.06.2023
NO14.09.2023
GR15.09.2023
Former [2023/48]ES14.06.2023
SE14.06.2023
NO14.09.2023
Former [2023/46]ES14.06.2023
Documents cited:Search[XI]WO2016144910  (OFINNO TECHNOLOGIES LLC [US]) [X] 1-3,5,8-10,12,13,16,17 * paragraph [0083] *[I] 4,6,7,11,14,15;
 [XI]US2017094612  (DINAN ESMAEL HEJAZI [US]) [X] 1-3,5,8-10,12,13,16,17 * claim 1 * [I] 4,6,7,11,14,15;
 [XI]US2017311317  (DINAN ESMAEL HEJAZI [US]) [X] 1-3,8-10,16,17 * paragraphs [0248] - [0249] * [I] 4,6,7,11,14,15;
 [XI]  - QUALCOMM INCORPORATED, "PUCCH on SCell", vol. RAN WG1, no. Belgrade, Serbia; 20150420 - 20150424, (20150419), 3GPP DRAFT; R1-151392, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20150419), XP050934267 [X] 1-3,8-10,16,17 * sections 1-3 * [I] 4,6,7,11,14,15
 [XI]  - CATT, "Discussion on the simultaneous transmissions of (s)PUCCH and (s)PUSCH", vol. RAN WG1, no. Hangzhou; 20170515 - 20170519, (20170514), 3GPP DRAFT; R1-1707443, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170514), XP051272652 [X] 1-3,8-10,16,17 * sections 1-3 * [I] 4,6,7,11,14,15
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.