blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3557222

EP3557222 - CALCULATION METHOD AND TESTING SYSTEM FOR CUMULATIVE DUST EXPOSURE TO RESPIRABLE DUST OF MINE WORKERS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.01.2023
Database last updated on 16.07.2024
FormerThe patent has been granted
Status updated on  28.01.2022
FormerGrant of patent is intended
Status updated on  03.10.2021
FormerRequest for examination was made
Status updated on  20.09.2019
FormerThe international publication has been made
Status updated on  05.07.2019
Formerunknown
Status updated on  17.06.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
CHONGQING RESEARCH INSTITUTE CO., LTD. OF CHINA COAL TECHNOLOGY & ENGINEERING GROUP
No.6 Kecheng Road, Erlang Technology New City
Jiulongpo District Chongqing 400039 / CN
[2019/43]
Inventor(s)01 / LI, Dewen
4-1
No.72
Shangqiao Sancun
Shapingba District
Chongqing 400037 / CN
02 / WANG, Jie
1-2
No. 22
Liujiayuan
Shapingba District
Chongqing 400030 / CN
03 / ZHAO, Zheng
No.55
Shangqiao Sancun
Shapingba District
Chongqing 400037 / CN
04 / WU, Fuxiang
4-2
No.13
Yuanjiagang
Yuzhong District
Chongqing 400042 / CN
05 / LIU, Guoqing
No.55
Shangqiao Sancun
Shapingba District
Chongqing 400037 / CN
06 / XU, Kui
12-5
Building 7
No. 988 Lanmei Road
Jiulongpo District
Chongqing 400039 / CN
07 / GUO, Shengjun
2-2
No. 63
Shangqiao Sancun
Shapingba District
Chongqing 400037 / CN
08 / SUI, Jinjun
4-2
No. 36
Shangqiao Sancun
Shapingba District
Chongqing 400037 / CN
09 / HUI, Lifeng
No.55
Shangqiao Sancun
Shapingba District
Chongqing 400037 / CN
10 / ZHANG, Qiang
No.55
Shangqiao Sancun
Shapingba District
Chongqing 400037 / CN
11 / JIAO, Min
No.58
Group 16
Shipan Village
Changshou District
Chongqing 401254 / CN
12 / DENG, Qin
2-1
No. 47
Shangqiao Sancun
Shapingba District
Chongqing 400037 / CN
13 / YAN, Dan
No.55
Shangqiao Sancun
Shapingba District
Chongqing 400037 / CN
14 / ZHENG, Lei
No.55
Shangqiao Sancun
Shapingba District
Chongqing 400037 / CN
15 / LIU, Haichen
2-2
Fu.40
No.99
Hongcaofang Street, Shapingba District
Chongqing 400038 / CN
16 / WANG, Junting
No. 017 Shuiquan Village
Yongxing Town
Liangcheng County
Wulanchabu Inner Mongolia 013764 / CN
17 / WU, Liang
12 Group Of Zhongxing Village
Qinggang Street
Bishan County
Chongqing 402781 / CN
 [2019/43]
Representative(s)Lermer, Christoph
Nove Haus - Design Offices
Luise-Ullrich-Straße 14
80636 München / DE
[N/P]
Former [2019/43]Lermer, Christoph
LermerRaible Patent- u. Rechtsanwalts PartGmbB
Lessingstrasse 6
80336 München / DE
Application number, filing date18887197.409.07.2018
[2019/43]
WO2018CN95014
Priority number, dateCN20171142987426.12.2017         Original published format: CN201711429874
[2019/43]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019128184
Date:04.07.2019
Language:ZH
[2019/27]
Type: A1 Application with search report 
No.:EP3557222
Date:23.10.2019
Language:EN
[2019/43]
Type: B1 Patent specification 
No.:EP3557222
Date:02.03.2022
Language:EN
[2022/09]
Search report(s)International search report - published on:CN04.07.2019
(Supplementary) European search report - dispatched on:EP16.10.2020
ClassificationIPC:G16H50/30, G16H50/50, G01N15/06, G06F17/11
[2021/41]
CPC:
G16H50/30 (EP); G01N15/0656 (EP,CN); G06F17/11 (EP,CN);
G16H50/50 (EP)
Former IPC [2020/47]G01N15/06, G16H50/30, G06F17/11
Former IPC [2019/43]G01N15/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/43]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:BERECHNUNGSVERFAHREN UND PRÜFSYSTEM FÜR KUMULATIVE STAUBEXPOSITION GEGENÜBER EINATEMBAREM STAUB VON MINENARBEITERN[2019/43]
English:CALCULATION METHOD AND TESTING SYSTEM FOR CUMULATIVE DUST EXPOSURE TO RESPIRABLE DUST OF MINE WORKERS[2019/43]
French:PROCÉDÉ DE CALCUL ET SYSTÈME D'ANALYSE D'EXPOSITION À LA POUSSIÈRE CUMULATIVE DE POUSSIÈRE RESPIRABLE DE TRAVAILLEURS MINIERS[2019/43]
Entry into regional phase17.06.2019Translation filed 
17.07.2019National basic fee paid 
17.07.2019Search fee paid 
17.07.2019Designation fee(s) paid 
17.07.2019Examination fee paid 
Examination procedure17.07.2019Examination requested  [2019/43]
23.03.2021Amendment by applicant (claims and/or description)
04.10.2021Communication of intention to grant the patent
14.12.2021Receipt of the translation of the claim(s)
21.01.2022Fee for grant paid
21.01.2022Fee for publishing/printing paid
Opposition(s)05.12.2022No opposition filed within time limit [2023/06]
Fees paidRenewal fee
20.07.2020Renewal fee patent year 03
23.07.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.07.2018
AL02.03.2022
AT02.03.2022
CY02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
IT02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
MK02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
IE09.07.2022
LU09.07.2022
BE31.07.2022
CH31.07.2022
LI31.07.2022
[2024/23]
Former [2024/20]HU09.07.2018
AL02.03.2022
AT02.03.2022
CY02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
IT02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
IE09.07.2022
LU09.07.2022
BE31.07.2022
CH31.07.2022
LI31.07.2022
Former [2024/18]HU09.07.2018
AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
IT02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
IE09.07.2022
LU09.07.2022
BE31.07.2022
CH31.07.2022
LI31.07.2022
Former [2023/35]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
IT02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
IE09.07.2022
LU09.07.2022
BE31.07.2022
CH31.07.2022
LI31.07.2022
Former [2023/33]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
IE09.07.2022
LU09.07.2022
BE31.07.2022
CH31.07.2022
LI31.07.2022
Former [2023/25]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
LU09.07.2022
BE31.07.2022
CH31.07.2022
LI31.07.2022
Former [2023/21]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
LU09.07.2022
CH31.07.2022
LI31.07.2022
Former [2023/11]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2023/10]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2023/07]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2023/01]AL02.03.2022
AT02.03.2022
CZ02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2022/51]AT02.03.2022
CZ02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2022/49]AT02.03.2022
CZ02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
PT04.07.2022
Former [2022/48]AT02.03.2022
CZ02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
PT04.07.2022
Former [2022/47]AT02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
PT04.07.2022
Former [2022/44]ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RS02.03.2022
SE02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
Former [2022/39]ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RS02.03.2022
SE02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
Former [2022/36]ES02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RS02.03.2022
SE02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
Former [2022/35]ES02.03.2022
HR02.03.2022
LT02.03.2022
RS02.03.2022
SE02.03.2022
BG02.06.2022
NO02.06.2022
Former [2022/34]ES02.03.2022
LT02.03.2022
NO02.06.2022
Former [2022/33]LT02.03.2022
NO02.06.2022
Documents cited:Search[IA]CN105089703  (JIANGSU SHINE TECHNOLOGY CO LTD) [I] 1-5,7-10 * abstract * * page 1, line 39 - page 3, line 5 * * page 4, line 28 - page 5, line 36 * * page 7, line 6 - page 9, line 4 * [A] 6;
 [A]  - ZHOU GANG ET AL, "The diffusion behavior law of respirable dust at fully mechanized caving face in coal mine: CFD numerical simulation and engineering application", PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, INSTITUTION OF CHEMICAL ENGINEERS, RUGBY, GB, (20161219), vol. 106, doi:10.1016/J.PSEP.2016.12.005, ISSN 0957-5820, pages 117 - 128, XP029924711 [A] 1-10 * abstract * * chapter 2.2 *

DOI:   http://dx.doi.org/10.1016/j.psep.2016.12.005
International searchCN108225996  [px] (CHINA COAL TECHNOLOGY ENG GROUP CHONGQING RES INST) [px] 1-10;
 CN105089703  [x] (JIANGSU SHINE TECHNOLOGY CO LTD) [x] 1-5,7-10;
 CN104500142  [a] (CHANGSHU MINE ELECTROMECHANICAL EQUIPMENT CO LTD) [a] 1-10 * the whole document *;
 CN107358363  [a] (UNIV HARBIN SCIENCE & TECH) [a] 1-10 * the whole document *;
 JP2001272391  [a] (HITACHI SHIPBUILDING ENG CO) [a] 1-10 * the whole document *;
 US2008122634  [a] (MARDIROSSIAN ARIS [US]) [a] 1-10 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.