EP3557222 - CALCULATION METHOD AND TESTING SYSTEM FOR CUMULATIVE DUST EXPOSURE TO RESPIRABLE DUST OF MINE WORKERS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.01.2023 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 28.01.2022 | ||
Former | Grant of patent is intended Status updated on 03.10.2021 | ||
Former | Request for examination was made Status updated on 20.09.2019 | ||
Former | The international publication has been made Status updated on 05.07.2019 | ||
Former | unknown Status updated on 17.06.2019 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states CHONGQING RESEARCH INSTITUTE CO., LTD. OF CHINA COAL TECHNOLOGY & ENGINEERING GROUP No.6 Kecheng Road, Erlang Technology New City Jiulongpo District Chongqing 400039 / CN | [2019/43] | Inventor(s) | 01 /
LI, Dewen 4-1 No.72 Shangqiao Sancun Shapingba District Chongqing 400037 / CN | 02 /
WANG, Jie 1-2 No. 22 Liujiayuan Shapingba District Chongqing 400030 / CN | 03 /
ZHAO, Zheng No.55 Shangqiao Sancun Shapingba District Chongqing 400037 / CN | 04 /
WU, Fuxiang 4-2 No.13 Yuanjiagang Yuzhong District Chongqing 400042 / CN | 05 /
LIU, Guoqing No.55 Shangqiao Sancun Shapingba District Chongqing 400037 / CN | 06 /
XU, Kui 12-5 Building 7 No. 988 Lanmei Road Jiulongpo District Chongqing 400039 / CN | 07 /
GUO, Shengjun 2-2 No. 63 Shangqiao Sancun Shapingba District Chongqing 400037 / CN | 08 /
SUI, Jinjun 4-2 No. 36 Shangqiao Sancun Shapingba District Chongqing 400037 / CN | 09 /
HUI, Lifeng No.55 Shangqiao Sancun Shapingba District Chongqing 400037 / CN | 10 /
ZHANG, Qiang No.55 Shangqiao Sancun Shapingba District Chongqing 400037 / CN | 11 /
JIAO, Min No.58 Group 16 Shipan Village Changshou District Chongqing 401254 / CN | 12 /
DENG, Qin 2-1 No. 47 Shangqiao Sancun Shapingba District Chongqing 400037 / CN | 13 /
YAN, Dan No.55 Shangqiao Sancun Shapingba District Chongqing 400037 / CN | 14 /
ZHENG, Lei No.55 Shangqiao Sancun Shapingba District Chongqing 400037 / CN | 15 /
LIU, Haichen 2-2 Fu.40 No.99 Hongcaofang Street, Shapingba District Chongqing 400038 / CN | 16 /
WANG, Junting No. 017 Shuiquan Village Yongxing Town Liangcheng County Wulanchabu Inner Mongolia 013764 / CN | 17 /
WU, Liang 12 Group Of Zhongxing Village Qinggang Street Bishan County Chongqing 402781 / CN | [2019/43] | Representative(s) | Lermer, Christoph Nove Haus - Design Offices Luise-Ullrich-Straße 14 80636 München / DE | [N/P] |
Former [2019/43] | Lermer, Christoph LermerRaible Patent- u. Rechtsanwalts PartGmbB Lessingstrasse 6 80336 München / DE | Application number, filing date | 18887197.4 | 09.07.2018 | [2019/43] | WO2018CN95014 | Priority number, date | CN201711429874 | 26.12.2017 Original published format: CN201711429874 | [2019/43] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019128184 | Date: | 04.07.2019 | Language: | ZH | [2019/27] | Type: | A1 Application with search report | No.: | EP3557222 | Date: | 23.10.2019 | Language: | EN | [2019/43] | Type: | B1 Patent specification | No.: | EP3557222 | Date: | 02.03.2022 | Language: | EN | [2022/09] | Search report(s) | International search report - published on: | CN | 04.07.2019 | (Supplementary) European search report - dispatched on: | EP | 16.10.2020 | Classification | IPC: | G16H50/30, G16H50/50, G01N15/06, G06F17/11 | [2021/41] | CPC: |
G16H50/30 (EP);
G01N15/0656 (EP,CN);
G06F17/11 (EP,CN);
G16H50/50 (EP)
|
Former IPC [2020/47] | G01N15/06, G16H50/30, G06F17/11 | ||
Former IPC [2019/43] | G01N15/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | BERECHNUNGSVERFAHREN UND PRÜFSYSTEM FÜR KUMULATIVE STAUBEXPOSITION GEGENÜBER EINATEMBAREM STAUB VON MINENARBEITERN | [2019/43] | English: | CALCULATION METHOD AND TESTING SYSTEM FOR CUMULATIVE DUST EXPOSURE TO RESPIRABLE DUST OF MINE WORKERS | [2019/43] | French: | PROCÉDÉ DE CALCUL ET SYSTÈME D'ANALYSE D'EXPOSITION À LA POUSSIÈRE CUMULATIVE DE POUSSIÈRE RESPIRABLE DE TRAVAILLEURS MINIERS | [2019/43] | Entry into regional phase | 17.06.2019 | Translation filed | 17.07.2019 | National basic fee paid | 17.07.2019 | Search fee paid | 17.07.2019 | Designation fee(s) paid | 17.07.2019 | Examination fee paid | Examination procedure | 17.07.2019 | Examination requested [2019/43] | 23.03.2021 | Amendment by applicant (claims and/or description) | 04.10.2021 | Communication of intention to grant the patent | 14.12.2021 | Receipt of the translation of the claim(s) | 21.01.2022 | Fee for grant paid | 21.01.2022 | Fee for publishing/printing paid | Opposition(s) | 05.12.2022 | No opposition filed within time limit [2023/06] | Fees paid | Renewal fee | 20.07.2020 | Renewal fee patent year 03 | 23.07.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.07.2018 | AL | 02.03.2022 | AT | 02.03.2022 | CY | 02.03.2022 | CZ | 02.03.2022 | DK | 02.03.2022 | EE | 02.03.2022 | ES | 02.03.2022 | FI | 02.03.2022 | HR | 02.03.2022 | IT | 02.03.2022 | LT | 02.03.2022 | LV | 02.03.2022 | MC | 02.03.2022 | MK | 02.03.2022 | NL | 02.03.2022 | PL | 02.03.2022 | RO | 02.03.2022 | RS | 02.03.2022 | SE | 02.03.2022 | SI | 02.03.2022 | SK | 02.03.2022 | SM | 02.03.2022 | BG | 02.06.2022 | NO | 02.06.2022 | GR | 03.06.2022 | IS | 02.07.2022 | PT | 04.07.2022 | IE | 09.07.2022 | LU | 09.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | [2024/23] |
Former [2024/20] | HU | 09.07.2018 | |
AL | 02.03.2022 | ||
AT | 02.03.2022 | ||
CY | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
IE | 09.07.2022 | ||
LU | 09.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2024/18] | HU | 09.07.2018 | |
AL | 02.03.2022 | ||
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
IE | 09.07.2022 | ||
LU | 09.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/35] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
IE | 09.07.2022 | ||
LU | 09.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/33] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
IE | 09.07.2022 | ||
LU | 09.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/25] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
LU | 09.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/21] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
LU | 09.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/11] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/10] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/07] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/01] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2022/51] | AT | 02.03.2022 | |
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2022/49] | AT | 02.03.2022 | |
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
PT | 04.07.2022 | ||
Former [2022/48] | AT | 02.03.2022 | |
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
PT | 04.07.2022 | ||
Former [2022/47] | AT | 02.03.2022 | |
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
PT | 04.07.2022 | ||
Former [2022/44] | ES | 02.03.2022 | |
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
Former [2022/39] | ES | 02.03.2022 | |
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
PL | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
Former [2022/36] | ES | 02.03.2022 | |
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
PL | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
Former [2022/35] | ES | 02.03.2022 | |
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
Former [2022/34] | ES | 02.03.2022 | |
LT | 02.03.2022 | ||
NO | 02.06.2022 | ||
Former [2022/33] | LT | 02.03.2022 | |
NO | 02.06.2022 | Documents cited: | Search | [IA]CN105089703 (JIANGSU SHINE TECHNOLOGY CO LTD) [I] 1-5,7-10 * abstract * * page 1, line 39 - page 3, line 5 * * page 4, line 28 - page 5, line 36 * * page 7, line 6 - page 9, line 4 * [A] 6; | [A] - ZHOU GANG ET AL, "The diffusion behavior law of respirable dust at fully mechanized caving face in coal mine: CFD numerical simulation and engineering application", PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, INSTITUTION OF CHEMICAL ENGINEERS, RUGBY, GB, (20161219), vol. 106, doi:10.1016/J.PSEP.2016.12.005, ISSN 0957-5820, pages 117 - 128, XP029924711 [A] 1-10 * abstract * * chapter 2.2 * DOI: http://dx.doi.org/10.1016/j.psep.2016.12.005 | International search | CN108225996 [px] (CHINA COAL TECHNOLOGY ENG GROUP CHONGQING RES INST) [px] 1-10; | CN105089703 [x] (JIANGSU SHINE TECHNOLOGY CO LTD) [x] 1-5,7-10; | CN104500142 [a] (CHANGSHU MINE ELECTROMECHANICAL EQUIPMENT CO LTD) [a] 1-10 * the whole document *; | CN107358363 [a] (UNIV HARBIN SCIENCE & TECH) [a] 1-10 * the whole document *; | JP2001272391 [a] (HITACHI SHIPBUILDING ENG CO) [a] 1-10 * the whole document *; | US2008122634 [a] (MARDIROSSIAN ARIS [US]) [a] 1-10 * the whole document * |