EP3636822 - WASHING MACHINE SUPPORT, WASHING MACHINE USING SUPPORT, AND STRUCTURAL OPTIMIZATION METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.12.2022 Database last updated on 04.11.2024 | |
Former | The patent has been granted Status updated on 21.01.2022 | ||
Former | Grant of patent is intended Status updated on 16.09.2021 | ||
Former | Request for examination was made Status updated on 13.03.2020 | ||
Former | The international publication has been made Status updated on 21.06.2019 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Gree Electric Appliances (Wuhan) Co., Ltd. No. 888 Dongfeng Avenue Economic & Technology Development Zone Wuhan, Hubei 430056 / CN | For all designated states Gree Electric Appliances, Inc. of Zhuhai West Jinji Road Qianshan Zhuhai, Guangdong 519070 / CN | [2020/16] | Inventor(s) | 01 /
YANG, Yang West Jinji Road Qianshan Zhuhai, Guangdong 519070 / CN | 02 /
ZHANG, Youlin West Jinji Road Qianshan Zhuhai, Guangdong 519070 / CN | 03 /
HUANG, Haoqin West Jinji Road Qianshan Zhuhai, Guangdong 519070 / CN | 04 /
CHEN, Xing West Jinji Road Qianshan Zhuhai, Guangdong 519070 / CN | 05 /
LI, Qi West Jinji Road Qianshan Zhuhai, Guangdong 519070 / CN | 06 /
JING, Zhenyang West Jinji Road Qianshan Zhuhai, Guangdong 519070 / CN | [2020/16] | Representative(s) | Corradini, Corrado, et al Ing. C. Corradini & C. S.r.l. Via Dante Alighieri 4 42121 Reggio Emilia / IT | [2020/16] | Application number, filing date | 18889801.9 | 16.08.2018 | [2020/16] | WO2018CN100775 | Priority number, date | CN201711308481 | 11.12.2017 Original published format: CN201711308481 | [2020/16] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019114306 | Date: | 20.06.2019 | Language: | ZH | [2019/25] | Type: | A1 Application with search report | No.: | EP3636822 | Date: | 15.04.2020 | Language: | EN | [2020/16] | Type: | B1 Patent specification | No.: | EP3636822 | Date: | 23.02.2022 | Language: | EN | [2022/08] | Search report(s) | International search report - published on: | CN | 20.06.2019 | (Supplementary) European search report - dispatched on: | EP | 17.04.2020 | Classification | IPC: | D06F37/04, G06F30/23, // D06F37/22 | [2020/20] | CPC: |
D06F37/04 (EP,US);
D06F37/22 (EP,CN,US);
G06F30/23 (EP,CN)
|
Former IPC [2020/16] | D06F37/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | WASCHMASCHINENSTÜTZE, WASCHMASCHINE MIT VERWENDUNG DER STÜTZE UND STRUKTUROPTIMIERUNGSVERFAHREN | [2020/16] | English: | WASHING MACHINE SUPPORT, WASHING MACHINE USING SUPPORT, AND STRUCTURAL OPTIMIZATION METHOD | [2020/16] | French: | SUPPORT POUR LAVE-LINGE, LAVE-LINGE UTILISANT LE SUPPORT ET PROCÉDÉ D'OPTIMISATION STRUCTURALE | [2020/16] | Entry into regional phase | 09.01.2020 | Translation filed | 09.01.2020 | National basic fee paid | 09.01.2020 | Search fee paid | 09.01.2020 | Designation fee(s) paid | 09.01.2020 | Examination fee paid | Examination procedure | 09.01.2020 | Examination requested [2020/16] | 28.07.2020 | Amendment by applicant (claims and/or description) | 17.09.2021 | Communication of intention to grant the patent | 12.01.2022 | Fee for grant paid | 12.01.2022 | Fee for publishing/printing paid | 12.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 24.11.2022 | No opposition filed within time limit [2023/05] | Fees paid | Renewal fee | 20.08.2020 | Renewal fee patent year 03 | 24.08.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.08.2018 | AL | 23.02.2022 | AT | 23.02.2022 | CY | 23.02.2022 | CZ | 23.02.2022 | DK | 23.02.2022 | EE | 23.02.2022 | ES | 23.02.2022 | FI | 23.02.2022 | HR | 23.02.2022 | IT | 23.02.2022 | LT | 23.02.2022 | LV | 23.02.2022 | MC | 23.02.2022 | MK | 23.02.2022 | MT | 23.02.2022 | NL | 23.02.2022 | PL | 23.02.2022 | RO | 23.02.2022 | RS | 23.02.2022 | SE | 23.02.2022 | SI | 23.02.2022 | SK | 23.02.2022 | SM | 23.02.2022 | BG | 23.05.2022 | NO | 23.05.2022 | GR | 24.05.2022 | IS | 23.06.2022 | PT | 23.06.2022 | IE | 16.08.2022 | LU | 16.08.2022 | BE | 31.08.2022 | CH | 31.08.2022 | LI | 31.08.2022 | [2024/44] |
Former [2024/27] | HU | 16.08.2018 | |
AL | 23.02.2022 | ||
AT | 23.02.2022 | ||
CY | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
MK | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 16.08.2022 | ||
LU | 16.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2024/21] | HU | 16.08.2018 | |
AL | 23.02.2022 | ||
AT | 23.02.2022 | ||
CY | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 16.08.2022 | ||
LU | 16.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2024/18] | HU | 16.08.2018 | |
AL | 23.02.2022 | ||
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 16.08.2022 | ||
LU | 16.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/42] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 16.08.2022 | ||
LU | 16.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/35] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 16.08.2022 | ||
LU | 16.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/33] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 16.08.2022 | ||
LU | 16.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/21] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
LU | 16.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/16] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/10] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/01] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/49] | AT | 23.02.2022 | |
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/48] | AT | 23.02.2022 | |
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/47] | AT | 23.02.2022 | |
DK | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/46] | AT | 23.02.2022 | |
DK | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/42] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/39] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/36] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/35] | ES | 23.02.2022 | |
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
NL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/34] | ES | 23.02.2022 | |
LT | 23.02.2022 | ||
NL | 23.02.2022 | ||
NO | 23.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/33] | LT | 23.02.2022 | |
NO | 23.05.2022 | Documents cited: | Search | [XAY]KR20090038185 (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1,14 * paragraph [0019] - paragraph [0022]; figure 2 * * paragraph [0023] - paragraph [0028]; figures 3, 4 * * see machine translation * [A] 4-10,12,13 [Y] 2,3,11; | [XA]DE4326496 (BOSCH SIEMENS HAUSGERAETE [DE]) [X] 1,14 * column 2, line 49 - column 3, line 45; figures 1-5 * [A] 2-13,15; | [XAY]EP2436823 (STORMA S R L [IT]) [X] 1,14 * paragraph [0013] - paragraph [0017]; figures 1, 2 * [A] 4-10,12,13 [Y] 2,3,11 |