EP3678437 - METHOD FOR CONFLICT RESOLUTION AND TERMINAL DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.01.2023 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 28.01.2022 | ||
Former | Grant of patent is intended Status updated on 22.11.2021 | ||
Former | Examination is in progress Status updated on 06.08.2021 | ||
Former | Request for examination was made Status updated on 05.06.2020 | ||
Former | The international publication has been made Status updated on 06.07.2019 | Most recent event Tooltip | 17.05.2024 | Lapse of the patent in a contracting state New state(s): HU | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan Guangdong 523860 / CN | [2022/09] |
Former [2020/28] | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan Guangdong 523860 / CN | Inventor(s) | 01 /
TANG, Hai No. 18 Haibin Road Wusha, Chang'an Dongguan Guangdong 523860 / CN | 02 /
LIN, Huei-Ming 52 Tyrone Street South Yarra, Victoria 3141 / AU | [2022/09] |
Former [2020/28] | 01 /
TANG, Hai No.18 Haibin Road, Wusha Chang'an Dongguan, Guangdong 523860 / CN | ||
02 /
LIN, Huei-Ming 52 Tyrone Street South Yarra, Victoria 3141 / AU | Representative(s) | Taor, Simon Edward William Venner Shipley LLP 200 Aldersgate London EC1A 4HD / GB | [2022/09] |
Former [2020/28] | Penza, Giancarlo Bugnion S.p.A. Viale Lancetti, 17 20158 Milano / IT | Application number, filing date | 18895692.4 | 03.04.2018 | [2020/28] | WO2018CN81783 | Priority number, date | WO2017CN119594 | 28.12.2017 Original published format: PCT/CN2017/119594 | WO2018CN75693 | 07.02.2018 Original published format: PCT/CN2018/075693 | [2020/28] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019127968 | Date: | 04.07.2019 | Language: | ZH | [2019/27] | Type: | A1 Application with search report | No.: | EP3678437 | Date: | 08.07.2020 | Language: | EN | [2020/28] | Type: | B1 Patent specification | No.: | EP3678437 | Date: | 02.03.2022 | Language: | EN | [2022/09] | Search report(s) | International search report - published on: | CN | 04.07.2019 | (Supplementary) European search report - dispatched on: | EP | 19.11.2020 | Classification | IPC: | H04W72/10, // H04W52/38 | [2020/52] | CPC: |
H04W4/70 (EP);
H04W72/569 (EP,KR);
H04W72/56 (CN,KR,US);
H04W76/14 (EP,KR,US);
H04B7/12 (EP,CN);
H04B7/2621 (CN);
H04L69/14 (EP);
H04W28/0278 (US);
H04W4/40 (EP,KR);
H04W40/22 (EP);
H04W52/30 (KR);
H04W72/0453 (EP,CN,KR);
H04W72/1263 (EP,KR);
H04W72/21 (US);
H04W72/23 (US);
H04W72/535 (KR);
H04W92/10 (KR);
H04W92/18 (EP,KR);
H04B7/26 (EP);
H04W52/367 (EP);
H04W52/383 (EP);
|
Former IPC [2020/28] | H04W72/10, H04L29/08, H04W28/08, H04W52/42, H04W52/30, H04B7/26, H04B7/12 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/28] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR KONFLIKTAUFLÖSUNG UND ENDGERÄT | [2020/28] | English: | METHOD FOR CONFLICT RESOLUTION AND TERMINAL DEVICE | [2020/28] | French: | PROCÉDÉ DE RÉSOLUTION DE CONFLIT ET DISPOSITIF TERMINAL | [2020/28] | Entry into regional phase | 06.03.2020 | Translation filed | 06.03.2020 | National basic fee paid | 06.03.2020 | Search fee paid | 06.03.2020 | Designation fee(s) paid | 06.03.2020 | Examination fee paid | Examination procedure | 06.03.2020 | Examination requested [2020/28] | 09.06.2021 | Amendment by applicant (claims and/or description) | 09.08.2021 | Despatch of a communication from the examining division (Time limit: M02) | 14.10.2021 | Reply to a communication from the examining division | 23.11.2021 | Communication of intention to grant the patent | 21.01.2022 | Fee for grant paid | 21.01.2022 | Fee for publishing/printing paid | 21.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 05.12.2022 | No opposition filed within time limit [2023/06] | Fees paid | Renewal fee | 06.03.2020 | Renewal fee patent year 03 | 17.03.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.04.2018 | AL | 02.03.2022 | AT | 02.03.2022 | CY | 02.03.2022 | CZ | 02.03.2022 | DK | 02.03.2022 | EE | 02.03.2022 | ES | 02.03.2022 | FI | 02.03.2022 | HR | 02.03.2022 | IT | 02.03.2022 | LT | 02.03.2022 | LV | 02.03.2022 | MC | 02.03.2022 | MK | 02.03.2022 | NL | 02.03.2022 | PL | 02.03.2022 | RO | 02.03.2022 | RS | 02.03.2022 | SE | 02.03.2022 | SI | 02.03.2022 | SK | 02.03.2022 | SM | 02.03.2022 | IE | 03.04.2022 | LU | 03.04.2022 | BE | 30.04.2022 | CH | 30.04.2022 | LI | 30.04.2022 | BG | 02.06.2022 | NO | 02.06.2022 | GR | 03.06.2022 | IS | 02.07.2022 | PT | 04.07.2022 | [2024/25] |
Former [2024/23] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CY | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
MK | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
IE | 03.04.2022 | ||
LU | 03.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2024/20] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CY | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
IE | 03.04.2022 | ||
LU | 03.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/35] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
IE | 03.04.2022 | ||
LU | 03.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/20] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
IE | 03.04.2022 | ||
LU | 03.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/10] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
LU | 03.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/09] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
LU | 03.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/08] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
LU | 03.04.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/07] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/06] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/01] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2022/51] | AT | 02.03.2022 | |
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2022/49] | AT | 02.03.2022 | |
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
PT | 04.07.2022 | ||
Former [2022/48] | AT | 02.03.2022 | |
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
PT | 04.07.2022 | ||
Former [2022/47] | AT | 02.03.2022 | |
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
PT | 04.07.2022 | ||
Former [2022/44] | ES | 02.03.2022 | |
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
Former [2022/39] | ES | 02.03.2022 | |
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
PL | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
Former [2022/36] | ES | 02.03.2022 | |
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
PL | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
Former [2022/35] | ES | 02.03.2022 | |
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
Former [2022/34] | ES | 02.03.2022 | |
LT | 02.03.2022 | ||
NO | 02.06.2022 | ||
Former [2022/33] | LT | 02.03.2022 | |
NO | 02.06.2022 | Documents cited: | Search | [XY] - HUAWEI HISILICON, "Discussion on Prioritization between UL TX and V2X SL TX", vol. RAN WG2, no. Reno, USA; 20161114 - 20161118, (20161113), 3GPP DRAFT; R2-167929 DISCUSSION ON PRIORITIZATION BETWEEN UL TRANSMISSION AND V2X SL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-AN, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20161113), XP051177664 [X] 1-4,7-9,11-15,19-23 * the whole document * [Y] 5,6,10,16-18 | [IA] - SAMSUNG, "Power allocation for simultaneous UL and SL TX in different carriers", vol. RAN WG1, no. Reno, USA; 20161114 - 20161118, (20161113), 3GPP DRAFT; R1-1612393, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20161113), XP051176341 [I] 1,11,20 * the whole document * [A] 2-10,12-19,21-23 | [YA] - ERICSSON ET AL, "Clarify relation of PPPP, PDB & priority", vol. SA WG2, no. Spokane, Washington, USA; 20170116 - 20170120, (20170304), 3GPP DRAFT; 23285_CR0023R1_V2XARC_(REL-14)_S2-170371_0130_PDBMAPPING_23285_JAN19_FINAL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-A, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/SA/Docs/, (20170304), XP051235023 [Y] 5,10,16,17 * the whole document * [A] 1-4,6-9,11-15,18-23 | [YA] - LG ELECTRONICS ET AL, "Pseudo-CR on mapping between PPPP to PDB for V2X communication over PC5 in the V2X services MO", vol. CT WG1, no. Reno, NV (USA); 20161114 - 20161118, (20161121), 3GPP DRAFT; C1-165329_WAS C1-165105_MAPPING THE PPPP TO PDB_TS 24.385 V2X MO_V3, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLI, URL: http://www.3gpp.org/ftp/tsg_ct/WG1_mm-cc-sm_ex-CN1/TSGC1_101_Reno/docs/, (20161121), XP051188167 [Y] 5,10,16,17 * the whole document * [A] 1-4,6-9,11-15,18-23 | [YA] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Proximity-based services (ProSe); Stage 2 (Release 15)", 3GPP STANDARD ; TECHNICAL SPECIFICATION ; 3GPP TS 23.303, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20170612), vol. SA WG2, no. V15.0.0, pages 1 - 131, XP051298388 [Y] 6,18 * paragraph [5.4.1] * * paragraph [5.1.2.1] * [A] 1-5,7-17,19-23 | [T] - HUAWEI (RAPPORTEUR), "Summary of [96#59][LTE/V2X] on Uu/SL prioritization", vol. RAN WG2, no. Athens, Greece; 20170213 - 20170217, (20170212), 3GPP DRAFT; R2-1701375 SUMMARY OF 96#59LTEV2X ON UU AND SL PRIORITIZATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170212), XP051212036 [T] * paragraph [0001] * * paragraph [02.1] - paragraph [02.3] * | International search | [A]WO2017111316 (LG ELECTRONICS INC [KR]) [A] 1-40* , entire document *; | [Y]CN107211377 (LG ELECTRONICS INC) [Y] 4-8, 24-28 * , description, paragraphs [0011]-[0026] *; | [X] - LG ELECTRONICS, "Discussion on Power Control for Simultaneous SL TX and WAN TX in Different Carriers", 3GPP TSG RAN WG1 Meeting #87 Rl-1611743, (20161118), XP051175712 [X] 1-3, 5-12, 21-23, 25-32 * , chapter 1, paragraph 2 to chapter 2, the last paragraph * | [X] - HUAWEI et al., "Discussion on Prioritization between UL TX and V2X SL TX", 3GPP TSG RAN WG2 Meeting #96 R2-167929, (20161118), XP051177664 [X] 1-3, 5-12, 21-23, 25-32 * , chapter 1, paragraph 1 to chapter 2, the last paragraph * | [X] - SAMSUNG, "Power Allocation for Simultaneous UL and SL TX in Different Carriers", 3GPP TSGRANWG1 Meeting #87 Rl-1612393, (20161118), XP051176341 [X] 1-3, 5-12, 21-23, 25-32 * , chapter 1, paragraph 1 to chapter 2, the last paragraph * | [X] - AD-HOC CHAIR (LGE), "Chairman's Notes of AI 6.2. 1 on LTE-based V2X Services", 3GPP TSG RAN WG1 Meeting #87 Rl-1613698, (20161118), XP051191517 [X] 1-3, 5-12, 21-23, 25-32 * , section 6.2.1.5, paragraph 1 to the last paragraph * | [X] - RAN WG1, "LS on RANI Agreements Potentially Related to RAN2/4 in LTE-based V2X Services", 3GPPTSG Meeting #87 R1-1613807, (20161118), XP051202203 [X] 1-3, 5-12, 21-23, 25-32 * , chapter 1, paragraph 3 to the last paragraph * | [Y] - LG ELECTRONICS, "Discussion on Power Control for Simultaneous SL TX and WAN TX in Different Carrier s", 3GPP TSG RAN WG1 Meeting #87 Rl-1611743, (20161118), XP051175712 [Y] 4-8, 24-28 * , chapter 1, paragraph 2 to chapter 2, the last paragraph * | by applicant | WO2018CN75693 |