EP3618217 - PHOTOVOLTAIC POWER PLANT AND SECONDARY CONTROL METHOD THEREFOR [Right-click to bookmark this link] | |||
Former [2020/10] | PHOTOVOLTAIC POWER PLANT AND SECONDARY FREQUENCY MODULATION CONTROL METHOD THEREFOR | ||
[2023/17] | Status | The patent has been granted Status updated on 08.09.2023 Database last updated on 04.06.2024 | |
Former | Grant of patent is intended Status updated on 24.05.2023 | ||
Former | Request for examination was made Status updated on 31.01.2020 | ||
Former | The international publication has been made Status updated on 06.07.2019 | Most recent event Tooltip | 17.05.2024 | Lapse of the patent in a contracting state New state(s): HR, NO, PL, RS | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states Beijing Goldwind Science & Creation Windpower Equipment Co., Ltd. No. 19 Kangding Road Beijing Economic & Technological Development Zone Daxing District Beijing 100176 / CN | [2020/10] | Inventor(s) | 01 /
BAO, Xianwen No. 8, Boxing 1st Road Beijing Economic & Technological Development Zone Daxing District Beijing 100176 / CN | 02 /
QIAO, Yuan No. 8, Boxing 1st Road Beijing Economic & Technological Development Zone Daxing District Beijing 100176 / CN | 03 /
ZHANG, Yi No. 8, Boxing 1st Road Beijing Economic & Technological Development Zone Daxing District Beijing 100176 / CN | [2020/10] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2020/10] | Application number, filing date | 18897136.0 | 10.05.2018 | [2020/10] | WO2018CN86351 | Priority number, date | CN201711497115 | 31.12.2017 Original published format: CN201711497115 | [2020/10] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019128037 | Date: | 04.07.2019 | Language: | ZH | [2019/27] | Type: | A1 Application with search report | No.: | EP3618217 | Date: | 04.03.2020 | Language: | EN | [2020/10] | Type: | B1 Patent specification | No.: | EP3618217 | Date: | 11.10.2023 | Language: | EN | [2023/41] | Search report(s) | International search report - published on: | CN | 04.07.2019 | (Supplementary) European search report - dispatched on: | EP | 26.05.2020 | Classification | IPC: | H02J3/48, H02J3/38, H02J3/46 | [2020/26] | CPC: |
H02J3/38 (EP,US);
H02J3/48 (EP,CN,US);
H02J3/381 (EP,CN,US);
H02J3/466 (EP,CN,US);
H02J2300/24 (EP,CN,US);
H02J2300/26 (US);
|
Former IPC [2020/10] | H02J3/48, H02J3/38 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | FOTOVOLTAIK-KRAFTWERK UND ZUGEHÖRIGES VERFAHREN ZUR SEKUNDÄRREGELUNG | [2023/17] | English: | PHOTOVOLTAIC POWER PLANT AND SECONDARY CONTROL METHOD THEREFOR | [2023/17] | French: | CENTRALE PHOTOVOLTAÏQUE ET SON PROCÉDÉ DE RÉGLAGE SECONDAIRE | [2023/17] |
Former [2020/10] | FOTOVOLTAIK-KRAFTWERK UND VERFAHREN ZUR STEUERUNG DER SEKUNDÄRFREQUENZMODULATION DAFÜR | ||
Former [2020/10] | PHOTOVOLTAIC POWER PLANT AND SECONDARY FREQUENCY MODULATION CONTROL METHOD THEREFOR | ||
Former [2020/10] | CENTRALE PHOTOVOLTAÏQUE ET SON PROCÉDÉ DE COMMANDE DE MODULATION DE FRÉQUENCE SECONDAIRE | Entry into regional phase | 29.11.2019 | Translation filed | 29.11.2019 | National basic fee paid | 29.11.2019 | Search fee paid | 29.11.2019 | Designation fee(s) paid | 29.11.2019 | Examination fee paid | Examination procedure | 29.11.2019 | Examination requested [2020/10] | 27.11.2020 | Amendment by applicant (claims and/or description) | 25.05.2023 | Communication of intention to grant the patent | 06.09.2023 | Fee for grant paid | 06.09.2023 | Fee for publishing/printing paid | 06.09.2023 | Receipt of the translation of the claim(s) | Fees paid | Renewal fee | 12.02.2020 | Renewal fee patent year 03 | 12.05.2021 | Renewal fee patent year 04 | 17.03.2022 | Renewal fee patent year 05 | 12.05.2023 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HR | 11.10.2023 | PL | 11.10.2023 | RS | 11.10.2023 | NO | 11.01.2024 | GR | 12.01.2024 | IS | 11.02.2024 | [2024/25] |
Former [2024/20] | GR | 12.01.2024 | |
IS | 11.02.2024 | Documents cited: | Search | [A]WO2016054412 (FIRST SOLAR INC [US]) [A] 1-15 * figure 1 ** paragraph [0054] *; | [XD]CN107026461 (NARI RELAYS ELECTRIC CO LTD , et al) [XD] 1-4,11,12 * figure 1 *; | WO2018205315 [ ] (NR ELECTRIC CO LTD [CN], et al) [ ] * paragraphs [0001] , [0002] , [0026] , [0027] , [0029] * * figure 1 * | International search | [A]EP1275822 (PETROBAS EN S A [AR]) [A] 1-20* entire document *; | [A]CN105449701 (NORTH CN ELEC POWER RES INST, et al) [A] 1-20 * entire document *; | [XA]CN107026461 (NARI RELAYS ELECTRIC CO LTD , et al) [X] 1-3, 12 * description, paragraphs [0020]-[0029], and figures 1-4 * * description, paragraphs [0020]-[0029], and figures 1-4 * [A] 4-11, 13-20 |