blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3570598

EP3570598 - POWER CONTROL METHOD, TERMINAL DEVICE AND NETWORK DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.02.2022
Database last updated on 02.08.2024
FormerThe patent has been granted
Status updated on  05.03.2021
FormerGrant of patent is intended
Status updated on  04.11.2020
FormerRequest for examination was made
Status updated on  18.10.2019
FormerThe international publication has been made
Status updated on  27.07.2019
Most recent event   Tooltip17.05.2024Lapse of the patent in a contracting state
New state(s): HU
published on 19.06.2024  [2024/25]
Applicant(s)For all designated states
GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD.
No. 18 Haibin Road
Wusha, Chang'an
Dongguan
Guangdong 523860 / CN
[2021/14]
Former [2019/50]For all designated states
GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD.
No. 18 Haibin Road
Wusha, Chang'an
Dongguan
Guangdong 523860 / CN
Former [2019/47]For all designated states
Guangdong OPPO Mobile Telecommunications Corp., Ltd.
No. 18, Haibin Road
Wusha
Chang'an
Dongguan
Guangdong 523860 / CN
Inventor(s)01 / CHEN, Wenhong
No.18 Haibin Road, Wusha, Chang'an
Dongguan, Guangdong 523860 / CN
02 / SHI, Zhihua
No.18 Haibin Road, Wusha, Chang'an
Dongguan, Guangdong 523860 / CN
 [2019/47]
Representative(s)Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB
Martin-Greif-Strasse 1
80336 München / DE
[2019/47]
Application number, filing date18901012.719.01.2018
[2019/47]
WO2018CN73518
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019140665
Date:25.07.2019
Language:ZH
[2019/30]
Type: A1 Application with search report 
No.:EP3570598
Date:20.11.2019
Language:EN
[2019/47]
Type: B1 Patent specification 
No.:EP3570598
Date:07.04.2021
Language:EN
[2021/14]
Search report(s)International search report - published on:CN25.07.2019
(Supplementary) European search report - dispatched on:EP11.02.2020
ClassificationIPC:H04W52/08
[2019/47]
CPC:
H04W52/146 (EP,CN,IL,KR,RU); H04W52/08 (EP,CN,IL,KR,RU,US); H04L27/0014 (IL,US);
H04W52/10 (EP,CN,IL,KR,US); H04W52/242 (EP,CN,IL,KR,RU,US); H04W52/325 (EP,CN,IL,KR,RU);
H04L2027/0053 (IL,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/47]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:LEISTUNGSSTEUERUNGSVERFAHREN, ENDGERÄTEVORRICHTUNG UND NETZWERKVORRICHTUNG[2019/47]
English:POWER CONTROL METHOD, TERMINAL DEVICE AND NETWORK DEVICE[2019/47]
French:PROCÉDÉ DE COMMANDE DE PUISSANCE, DISPOSITIF TERMINAL ET DISPOSITIF DE RÉSEAU[2019/47]
Entry into regional phase12.08.2019Translation filed 
12.08.2019National basic fee paid 
12.08.2019Search fee paid 
12.08.2019Designation fee(s) paid 
12.08.2019Examination fee paid 
Examination procedure12.08.2019Examination requested  [2019/47]
18.08.2020Amendment by applicant (claims and/or description)
05.11.2020Communication of intention to grant the patent
23.02.2021Fee for grant paid
23.02.2021Fee for publishing/printing paid
23.02.2021Receipt of the translation of the claim(s)
Divisional application(s)EP21150290.1  / EP3826374
Opposition(s)10.01.2022No opposition filed within time limit [2022/11]
Fees paidRenewal fee
12.08.2019Renewal fee patent year 03
27.01.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.01.2018
AL07.04.2021
CY07.04.2021
CZ07.04.2021
EE07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
MK07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
[2024/25]
Former [2024/23]AL07.04.2021
CY07.04.2021
CZ07.04.2021
EE07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
MK07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2024/20]AL07.04.2021
CY07.04.2021
CZ07.04.2021
EE07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/39]AL07.04.2021
CZ07.04.2021
EE07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/29]AL07.04.2021
CZ07.04.2021
EE07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/26]AL07.04.2021
CZ07.04.2021
EE07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/23]CZ07.04.2021
EE07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/10]CZ07.04.2021
EE07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
IS22.12.2021
Former [2022/09]CZ07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/07]HR07.04.2021
LT07.04.2021
LV07.04.2021
PL07.04.2021
RS07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/52]HR07.04.2021
LT07.04.2021
LV07.04.2021
PL07.04.2021
RS07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/51]HR07.04.2021
LT07.04.2021
LV07.04.2021
RS07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/50]HR07.04.2021
LT07.04.2021
LV07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
Former [2021/49]HR07.04.2021
LT07.04.2021
LV07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
Former [2021/47]LT07.04.2021
BG07.07.2021
Former [2021/46]LT07.04.2021
Documents cited:Search[A]EP3247163  (LG ELECTRONICS INC [KR]) [A] 1,8* paragraphs [0059] - [0060] - [ 131] *
International searchUS2012329503  [a] (JOENGREN GEORGE [SE], et al) [a] 1-38 * the whole document *;
 CN105307254  [a] (NAT UNIV DEFENSE TECHNOLOGY) [a] 1-38;
 CN105309017  [a] (LG ELECTRONICS INC) [a] 1-38;
 CN108134659  [e] (ZTE CORP)[e] 1,2,5-7,9,10,11,12,15-19;
 US10004043  [a] (LEE SEUNGMIN [KR], et al) [a] 1-38 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.