EP3570598 - POWER CONTROL METHOD, TERMINAL DEVICE AND NETWORK DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.02.2022 Database last updated on 02.08.2024 | |
Former | The patent has been granted Status updated on 05.03.2021 | ||
Former | Grant of patent is intended Status updated on 04.11.2020 | ||
Former | Request for examination was made Status updated on 18.10.2019 | ||
Former | The international publication has been made Status updated on 27.07.2019 | Most recent event Tooltip | 17.05.2024 | Lapse of the patent in a contracting state New state(s): HU | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan Guangdong 523860 / CN | [2021/14] |
Former [2019/50] | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan Guangdong 523860 / CN | ||
Former [2019/47] | For all designated states Guangdong OPPO Mobile Telecommunications Corp., Ltd. No. 18, Haibin Road Wusha Chang'an Dongguan Guangdong 523860 / CN | Inventor(s) | 01 /
CHEN, Wenhong No.18 Haibin Road, Wusha, Chang'an Dongguan, Guangdong 523860 / CN | 02 /
SHI, Zhihua No.18 Haibin Road, Wusha, Chang'an Dongguan, Guangdong 523860 / CN | [2019/47] | Representative(s) | Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB Martin-Greif-Strasse 1 80336 München / DE | [2019/47] | Application number, filing date | 18901012.7 | 19.01.2018 | [2019/47] | WO2018CN73518 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019140665 | Date: | 25.07.2019 | Language: | ZH | [2019/30] | Type: | A1 Application with search report | No.: | EP3570598 | Date: | 20.11.2019 | Language: | EN | [2019/47] | Type: | B1 Patent specification | No.: | EP3570598 | Date: | 07.04.2021 | Language: | EN | [2021/14] | Search report(s) | International search report - published on: | CN | 25.07.2019 | (Supplementary) European search report - dispatched on: | EP | 11.02.2020 | Classification | IPC: | H04W52/08 | [2019/47] | CPC: |
H04W52/146 (EP,CN,IL,KR,RU);
H04W52/08 (EP,CN,IL,KR,RU,US);
H04L27/0014 (IL,US);
H04W52/10 (EP,CN,IL,KR,US);
H04W52/242 (EP,CN,IL,KR,RU,US);
H04W52/325 (EP,CN,IL,KR,RU);
H04L2027/0053 (IL,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | LEISTUNGSSTEUERUNGSVERFAHREN, ENDGERÄTEVORRICHTUNG UND NETZWERKVORRICHTUNG | [2019/47] | English: | POWER CONTROL METHOD, TERMINAL DEVICE AND NETWORK DEVICE | [2019/47] | French: | PROCÉDÉ DE COMMANDE DE PUISSANCE, DISPOSITIF TERMINAL ET DISPOSITIF DE RÉSEAU | [2019/47] | Entry into regional phase | 12.08.2019 | Translation filed | 12.08.2019 | National basic fee paid | 12.08.2019 | Search fee paid | 12.08.2019 | Designation fee(s) paid | 12.08.2019 | Examination fee paid | Examination procedure | 12.08.2019 | Examination requested [2019/47] | 18.08.2020 | Amendment by applicant (claims and/or description) | 05.11.2020 | Communication of intention to grant the patent | 23.02.2021 | Fee for grant paid | 23.02.2021 | Fee for publishing/printing paid | 23.02.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21150290.1 / EP3826374 | Opposition(s) | 10.01.2022 | No opposition filed within time limit [2022/11] | Fees paid | Renewal fee | 12.08.2019 | Renewal fee patent year 03 | 27.01.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.01.2018 | AL | 07.04.2021 | CY | 07.04.2021 | CZ | 07.04.2021 | EE | 07.04.2021 | HR | 07.04.2021 | LT | 07.04.2021 | LV | 07.04.2021 | MC | 07.04.2021 | MK | 07.04.2021 | PL | 07.04.2021 | RO | 07.04.2021 | RS | 07.04.2021 | SI | 07.04.2021 | SK | 07.04.2021 | SM | 07.04.2021 | BG | 07.07.2021 | NO | 07.07.2021 | GR | 08.07.2021 | IS | 07.08.2021 | PT | 09.08.2021 | [2024/25] |
Former [2024/23] | AL | 07.04.2021 | |
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
EE | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
MK | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2024/20] | AL | 07.04.2021 | |
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
EE | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/39] | AL | 07.04.2021 | |
CZ | 07.04.2021 | ||
EE | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/29] | AL | 07.04.2021 | |
CZ | 07.04.2021 | ||
EE | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/26] | AL | 07.04.2021 | |
CZ | 07.04.2021 | ||
EE | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/23] | CZ | 07.04.2021 | |
EE | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/10] | CZ | 07.04.2021 | |
EE | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | CZ | 07.04.2021 | |
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/07] | HR | 07.04.2021 | |
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/52] | HR | 07.04.2021 | |
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/51] | HR | 07.04.2021 | |
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
RS | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/50] | HR | 07.04.2021 | |
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
Former [2021/49] | HR | 07.04.2021 | |
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
Former [2021/47] | LT | 07.04.2021 | |
BG | 07.07.2021 | ||
Former [2021/46] | LT | 07.04.2021 | Documents cited: | Search | [A]EP3247163 (LG ELECTRONICS INC [KR]) [A] 1,8* paragraphs [0059] - [0060] - [ 131] * | International search | US2012329503 [a] (JOENGREN GEORGE [SE], et al) [a] 1-38 * the whole document *; | CN105307254 [a] (NAT UNIV DEFENSE TECHNOLOGY) [a] 1-38; | CN105309017 [a] (LG ELECTRONICS INC) [a] 1-38; | CN108134659 [e] (ZTE CORP)[e] 1,2,5-7,9,10,11,12,15-19; | US10004043 [a] (LEE SEUNGMIN [KR], et al) [a] 1-38 * the whole document * |