blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3509163

EP3509163 - CABLE CONNECTION TERMINAL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  14.01.2022
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  05.02.2021
FormerGrant of patent is intended
Status updated on  18.10.2020
FormerRequest for examination was made
Status updated on  10.01.2020
FormerThe application has been published
Status updated on  07.06.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Wago Verwaltungsgesellschaft mbH
Hansastrasse 27
32423 Minden / DE
[2019/28]
Inventor(s)01 / Mickmann, Viktor
Küsterstraße 2
31515 Wunstorf / DE
 [2019/28]
Representative(s)Gramm, Lins & Partner Patent- und Rechtsanwälte PartGmbB
Freundallee 13a
30173 Hannover / DE
[2019/28]
Application number, filing date19150508.007.01.2019
[2019/28]
Priority number, dateDE20181010026108.01.2018         Original published format: DE102018100261
[2019/28]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3509163
Date:10.07.2019
Language:DE
[2019/28]
Type: B1 Patent specification 
No.:EP3509163
Date:10.03.2021
Language:DE
[2021/10]
Search report(s)(Supplementary) European search report - dispatched on:EP09.05.2019
ClassificationIPC:H01R4/48
[2019/28]
CPC:
H01R4/4821 (EP,US); H01R4/4833 (EP,US); H01R4/485 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/07]
Former [2019/28]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:LEITERANSCHLUSSKLEMME[2019/28]
English:CABLE CONNECTION TERMINAL[2019/28]
French:BORNE DE CONNEXION CONDUCTRICE[2019/28]
Examination procedure08.01.2020Amendment by applicant (claims and/or description)
08.01.2020Examination requested  [2020/07]
08.01.2020Date on which the examining division has become responsible
19.10.2020Communication of intention to grant the patent
28.01.2021Fee for grant paid
28.01.2021Fee for publishing/printing paid
28.01.2021Receipt of the translation of the claim(s)
Opposition(s)13.12.2021No opposition filed within time limit [2022/07]
Fees paidRenewal fee
27.01.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.01.2019
AL10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
MK10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
[2024/23]
Former [2024/20]HU07.01.2019
AL10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2024/18]HU07.01.2019
AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/39]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/23]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
IT10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/13]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2022/10]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2022/08]AL10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/07]AL10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/52]CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/51]CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/50]CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2021/48]CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RS10.03.2021
SE10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/46]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RS10.03.2021
SE10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/43]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RS10.03.2021
SE10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/38]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
SE10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/37]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/36]FI10.03.2021
HR10.03.2021
LT10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/35]FI10.03.2021
HR10.03.2021
LT10.03.2021
NO10.06.2021
Former [2021/33]FI10.03.2021
LT10.03.2021
NO10.06.2021
Documents cited:Search[A]JPH09274952  (WATANABE SEISAKUSHO KK, et al);
 [A]EP1429418  (TYCO ELECTRONICS CORP [US]);
 [A]EP1641079  (LEGRAND SA [FR], et al);
 [A]US2007238303  (WALTER FRANK [DE], et al);
 [A]US2009035998  (SCHRADER ANDREAS [DE]);
 [XA]DE202016008409U  (HARTING ELECTRIC GMBH & CO KG [DE])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.