blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3510931

EP3510931 - METHOD FOR CALIBRATING A COLLIMATOR AND APPARATUS FOR X-RAY ANALYSIS CONFIGURED TO CARRY OUT THE METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.11.2023
Database last updated on 17.09.2024
FormerThe patent has been granted
Status updated on  02.12.2022
FormerGrant of patent is intended
Status updated on  03.07.2022
FormerRequest for examination was made
Status updated on  17.01.2020
FormerThe application has been published
Status updated on  14.06.2019
Most recent event   Tooltip09.02.2024Lapse of the patent in a contracting state
New state(s): SI
published on 13.03.2024  [2024/11]
Applicant(s)For all designated states
IMS Giotto S.p.A.
Via Sagittario 5 - Fraz. Pontecchio Marconi
40037 Sasso Marconi (Bologna) / IT
[2019/29]
Inventor(s)01 / VECCHIO, Sara
Via Galileo Galilei 18
40033 CASALECCHIO DI RENO (Bologna) / IT
02 / VIGNOLI, Paolo
Via Mascellaro 26C
40017 SAN GIOVANNI IN PERSICETO (Bologna) / IT
03 / SALOMONI, Valerio
Via De Ambris 25
40122 BOLOGNA / IT
 [2019/29]
Representative(s)Milli, Simone
Bugnion S.p.A.
Via di Corticella, 87
40128 Bologna / IT
[2023/01]
Former [2019/29]Falzoni, Davide Aldo
Bugnion S.p.A.
Via di Corticella, 87
40128 Bologna / IT
Application number, filing date19151336.511.01.2019
[2019/29]
Priority number, dateIT2018000086815.01.2018         Original published format: IT201800000868
[2019/29]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3510931
Date:17.07.2019
Language:EN
[2019/29]
Type: B1 Patent specification 
No.:EP3510931
Date:04.01.2023
Language:EN
[2023/01]
Search report(s)(Supplementary) European search report - dispatched on:EP15.03.2019
ClassificationIPC:A61B6/06, A61B6/00, A61B6/02
[2019/29]
CPC:
A61B6/06 (EP,US); G01T7/005 (US); A61B6/40 (CN);
A61B6/584 (US); A61B6/585 (EP,US); G21K1/02 (US);
A61B6/025 (EP,US); A61B6/4452 (EP,US); G06T2207/10116 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/08]
Former [2019/29]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR KALIBRIERUNG EINES KOLLIMATORS UND VORRICHTUNG ZUR RÖNTGENANALYSE MIT KONFIGURATION ZUR DURCHFÜHRUNG DES VERFAHRENS[2019/29]
English:METHOD FOR CALIBRATING A COLLIMATOR AND APPARATUS FOR X-RAY ANALYSIS CONFIGURED TO CARRY OUT THE METHOD[2019/29]
French:PROCÉDÉ D'ÉTALONNAGE D'UN COLLIMATEUR ET APPAREIL POUR ANALYSE AUX RAYONS X CONFIGURÉ POUR METTRE EN OEUVRE LE PROCÉDÉ[2023/01]
Former [2019/29]PROCÉDÉ D'ÉTALONNAGE D'UN COLLIMATEUR ET APPAREIL POUR ANALYSE AUX RAYONS X CONFIGURÉ POUR METTRE EN UVRE LE PROCÉDÉ
Examination procedure09.01.2020Amendment by applicant (claims and/or description)
09.01.2020Examination requested  [2020/08]
09.01.2020Date on which the examining division has become responsible
04.07.2022Communication of intention to grant the patent
26.10.2022Fee for grant paid
26.10.2022Fee for publishing/printing paid
26.10.2022Receipt of the translation of the claim(s)
Opposition(s)05.10.2023No opposition filed within time limit [2023/50]
Fees paidRenewal fee
20.11.2020Renewal fee patent year 03
28.01.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT04.01.2023
CZ04.01.2023
DK04.01.2023
EE04.01.2023
ES04.01.2023
FI04.01.2023
HR04.01.2023
LT04.01.2023
LV04.01.2023
MC04.01.2023
NL04.01.2023
PL04.01.2023
RO04.01.2023
RS04.01.2023
SE04.01.2023
SI04.01.2023
SK04.01.2023
SM04.01.2023
IE11.01.2023
LU11.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO04.04.2023
GR05.04.2023
IS04.05.2023
PT04.05.2023
[2024/11]
Former [2024/08]AT04.01.2023
CZ04.01.2023
DK04.01.2023
EE04.01.2023
ES04.01.2023
FI04.01.2023
HR04.01.2023
LT04.01.2023
LV04.01.2023
MC04.01.2023
NL04.01.2023
PL04.01.2023
RO04.01.2023
RS04.01.2023
SE04.01.2023
SK04.01.2023
SM04.01.2023
IE11.01.2023
LU11.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO04.04.2023
GR05.04.2023
IS04.05.2023
PT04.05.2023
Former [2023/50]AT04.01.2023
CZ04.01.2023
DK04.01.2023
EE04.01.2023
ES04.01.2023
FI04.01.2023
HR04.01.2023
LT04.01.2023
LV04.01.2023
MC04.01.2023
NL04.01.2023
PL04.01.2023
RO04.01.2023
RS04.01.2023
SE04.01.2023
SK04.01.2023
SM04.01.2023
LU11.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO04.04.2023
GR05.04.2023
IS04.05.2023
PT04.05.2023
Former [2023/49]AT04.01.2023
CZ04.01.2023
DK04.01.2023
EE04.01.2023
ES04.01.2023
FI04.01.2023
HR04.01.2023
LT04.01.2023
LV04.01.2023
MC04.01.2023
NL04.01.2023
PL04.01.2023
RO04.01.2023
RS04.01.2023
SE04.01.2023
SM04.01.2023
LU11.01.2023
BE31.01.2023
CH31.01.2023
LI31.01.2023
NO04.04.2023
GR05.04.2023
IS04.05.2023
PT04.05.2023
Former [2023/48]AT04.01.2023
DK04.01.2023
EE04.01.2023
ES04.01.2023
FI04.01.2023
HR04.01.2023
LT04.01.2023
LV04.01.2023
MC04.01.2023
NL04.01.2023
PL04.01.2023
RS04.01.2023
SE04.01.2023
SM04.01.2023
LU11.01.2023
CH31.01.2023
LI31.01.2023
NO04.04.2023
GR05.04.2023
IS04.05.2023
PT04.05.2023
Former [2023/47]AT04.01.2023
DK04.01.2023
ES04.01.2023
FI04.01.2023
HR04.01.2023
LT04.01.2023
LV04.01.2023
NL04.01.2023
PL04.01.2023
RS04.01.2023
SE04.01.2023
SM04.01.2023
LU11.01.2023
CH31.01.2023
LI31.01.2023
NO04.04.2023
GR05.04.2023
IS04.05.2023
PT04.05.2023
Former [2023/46]AT04.01.2023
DK04.01.2023
ES04.01.2023
FI04.01.2023
HR04.01.2023
LT04.01.2023
LV04.01.2023
NL04.01.2023
PL04.01.2023
RS04.01.2023
SE04.01.2023
SM04.01.2023
LU11.01.2023
NO04.04.2023
GR05.04.2023
IS04.05.2023
PT04.05.2023
Former [2023/43]AT04.01.2023
ES04.01.2023
FI04.01.2023
HR04.01.2023
LT04.01.2023
LV04.01.2023
NL04.01.2023
PL04.01.2023
RS04.01.2023
SE04.01.2023
LU11.01.2023
NO04.04.2023
GR05.04.2023
IS04.05.2023
PT04.05.2023
Former [2023/39]AT04.01.2023
ES04.01.2023
FI04.01.2023
HR04.01.2023
LT04.01.2023
LV04.01.2023
NL04.01.2023
PL04.01.2023
RS04.01.2023
SE04.01.2023
NO04.04.2023
GR05.04.2023
IS04.05.2023
PT04.05.2023
Former [2023/38]AT04.01.2023
ES04.01.2023
FI04.01.2023
HR04.01.2023
LT04.01.2023
LV04.01.2023
NL04.01.2023
PL04.01.2023
RS04.01.2023
SE04.01.2023
NO04.04.2023
GR05.04.2023
PT04.05.2023
Former [2023/37]AT04.01.2023
ES04.01.2023
FI04.01.2023
HR04.01.2023
LT04.01.2023
LV04.01.2023
NL04.01.2023
RS04.01.2023
SE04.01.2023
NO04.04.2023
GR05.04.2023
PT04.05.2023
Former [2023/36]AT04.01.2023
ES04.01.2023
FI04.01.2023
HR04.01.2023
LT04.01.2023
LV04.01.2023
NL04.01.2023
RS04.01.2023
SE04.01.2023
NO04.04.2023
PT04.05.2023
Former [2023/35]AT04.01.2023
ES04.01.2023
HR04.01.2023
LT04.01.2023
NL04.01.2023
RS04.01.2023
NO04.04.2023
PT04.05.2023
Former [2023/34]ES04.01.2023
LT04.01.2023
NL04.01.2023
RS04.01.2023
PT04.05.2023
Former [2023/33]ES04.01.2023
LT04.01.2023
NL04.01.2023
Former [2023/31]NL04.01.2023
Documents cited:Search[X]US2002122534  (POLKUS VINCENT S [US], et al) [X] 1-12 * abstract * * figures 1-10 * * paragraph [0021] - paragraph [0056] *;
 [A]US2005169432  (GROH BURKHARD [US], et al) [A] 1-12 * abstract * * figures 1-4 ** paragraph [0004] - paragraph [0032] *;
 [X]DE102012205261  (SIEMENS AG [DE]) [X] 1,7,11 * abstract * * figures 1-7 * * paragraph [0029] - paragraph [0028] *
by applicantUS2002122534
 DE102012205261
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.