EP3511112 - MACHINE TOOL WITH ACTIVE DAMPING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.08.2021 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 28.08.2020 | ||
Former | Grant of patent is intended Status updated on 21.06.2020 | ||
Former | Request for examination was made Status updated on 24.01.2020 | ||
Former | The application has been published Status updated on 14.06.2019 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Soraluce, S.Coop. Osintxu Auzoa 20570 Bergara (Guipuzcoa) / ES | [2019/29] | Inventor(s) | 01 /
PEREZ PERLADO, Jon Osintxu Auzoa 20570 BERGARA (GUIPUZCOA) / ES | 02 /
MANCISIDOR AIZPURUA, Iker Pol. Industrial de Arriaga, 2 20870 ELGOIBAR (GUIPUZCOA) / ES | [2019/29] | Representative(s) | Cabinet Beau de Loménie 158, rue de l'Université 75340 Paris Cedex 07 / FR | [2019/29] | Application number, filing date | 19151875.2 | 15.01.2019 | [2019/29] | Priority number, date | ES20180030040 | 15.01.2018 Original published format: ES 201830040 | [2019/29] | Filing language | ES | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3511112 | Date: | 17.07.2019 | Language: | EN | [2019/29] | Type: | B1 Patent specification | No.: | EP3511112 | Date: | 30.09.2020 | Language: | EN | [2020/40] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.05.2019 | Classification | IPC: | B23Q1/01, B23Q11/00 | [2019/29] | CPC: |
B23Q1/01 (EP,US);
B23Q11/0032 (CN,ES);
B23Q11/0035 (US);
B23Q1/25 (CN);
B23Q1/50 (US);
B23Q11/0039 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/09] |
Former [2019/29] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | WERKZEUGMASCHINE MIT AKTIVER DÄMPFUNG | [2019/29] | English: | MACHINE TOOL WITH ACTIVE DAMPING | [2019/29] | French: | MACHINE-OUTIL À AMORTISSEMENT ACTIF | [2019/29] | Examination procedure | 17.01.2020 | Examination requested [2020/09] | 17.01.2020 | Date on which the examining division has become responsible | 03.03.2020 | Observations by third parties | 22.06.2020 | Communication of intention to grant the patent | 25.08.2020 | Fee for grant paid | 25.08.2020 | Fee for publishing/printing paid | 25.08.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.07.2021 | No opposition filed within time limit [2021/36] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.01.2019 | AL | 30.09.2020 | AT | 30.09.2020 | CY | 30.09.2020 | DK | 30.09.2020 | EE | 30.09.2020 | FI | 30.09.2020 | HR | 30.09.2020 | LT | 30.09.2020 | LV | 30.09.2020 | MC | 30.09.2020 | MK | 30.09.2020 | NL | 30.09.2020 | PL | 30.09.2020 | RO | 30.09.2020 | RS | 30.09.2020 | SE | 30.09.2020 | SI | 30.09.2020 | SK | 30.09.2020 | SM | 30.09.2020 | BG | 30.12.2020 | NO | 30.12.2020 | GR | 31.12.2020 | IE | 15.01.2021 | LU | 15.01.2021 | IS | 30.01.2021 | BE | 31.01.2021 | FR | 31.01.2021 | PT | 01.02.2021 | [2024/23] |
Former [2023/33] | HU | 15.01.2019 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
BE | 31.01.2021 | ||
FR | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2023/30] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
BE | 31.01.2021 | ||
FR | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/34] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
BE | 31.01.2021 | ||
FR | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/23] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
FR | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/10] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
FR | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/07] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
FR | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/50] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
FR | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/48] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
FR | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/43] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/40] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/37] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/30] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/28] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/25] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/22] | EE | 30.09.2020 | |
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/21] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/20] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/10] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/08] | FI | 30.09.2020 | |
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
Former [2021/07] | FI | 30.09.2020 | |
NO | 30.12.2020 | Documents cited: | Search | [AD]ES2425994 (SORALUCE S COOP [ES]) [AD] 1-6* abstract *; | [A]WO2016023239 (INST PROCESS ENG CAS [CN], et al) [A] 1-6 * abstract *; | [A]EP3241647 (SORALUCE S COOP [ES]) [A] 1-6 * abstract * | other | US5913955 | EP1001184 | US2002083805 | EP2708316 | EP3017911 | EP3241647 | - URL: https://issuu.com/soraluce/docs/soraluce-te-a-universal-bett-fras-u | - BILBAO-GUILLERNA et al., "Low Frequency Chatter Suppression using an Inertial Actuator", Proceedings of 9th International Conference on High Speed Machining, (20140410), XP055648718 | - J MUNOA et al, "Chatter suppression in ram type travelling column milling machines using a biaxial inertial actuator", CIRP Annals - Manufacturing Technology, (2013), vol. 62, pages 407 - 410, XP028565700 DOI: http://dx.doi.org/10.1016/j.cirp.2013.03.143 | - IKER MANCISIDOR et al, "Mechatronic Spindle Head for Chatter Suppression in Heavy Duty Operations", UMTIK 2014 - The 16th International Conference on Machine Design and Production, (20140630), XP055648709 |