| EP3514329 - AIRFOIL WITH DIRT SEPARATOR FOR A FILM COOLING HOLE [Right-click to bookmark this link] | |||
| Former [2019/30] | DIRT SEPARATOR FOR INTERNALLY COOLED COMPONENTS | ||
| [2021/51] | Status | No opposition filed within time limit Status updated on 19.05.2023 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 10.06.2022 | ||
| Former | Grant of patent is intended Status updated on 27.01.2022 | ||
| Former | Request for examination was made Status updated on 17.12.2021 | ||
| Former | Grant of patent is intended Status updated on 13.12.2021 | ||
| Former | Request for examination was made Status updated on 31.01.2020 | ||
| Former | The application has been published Status updated on 21.06.2019 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Raytheon Technologies Corporation 10 Farm Springs Road Farmington, CT 06032 / US | [2021/12] |
| Former [2019/30] | For all designated states United Technologies Corporation 10 Farm Springs Road Farmington, CT 06032 / US | Inventor(s) | 01 /
PROPHETER-HINCKLEY, Tracy A. 32 Windy Hill Lane Rocky Hill, CT Connecticut 06067 / US | 02 /
WAGNER, Joel H. 203 Clearfield Road Wethersfield, CT Connecticut 06109 / US | [2019/30] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
| Former [2019/30] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 19152334.9 | 17.01.2019 | [2019/30] | Priority number, date | US201815873475 | 17.01.2018 Original published format: US201815873475 | [2019/30] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3514329 | Date: | 24.07.2019 | Language: | EN | [2019/30] | Type: | B1 Patent specification | No.: | EP3514329 | Date: | 13.07.2022 | Language: | EN | [2022/28] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.04.2019 | Classification | IPC: | F01D5/18 | [2019/30] | CPC: |
F01D5/187 (EP,US);
F01D25/32 (US);
F01D5/186 (EP);
F05D2220/32 (US);
F05D2240/305 (US);
F05D2240/307 (US);
F05D2250/185 (US);
F05D2250/231 (US);
F05D2260/201 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/10] |
| Former [2019/30] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SCHAUFEL MIT SCHMUTZABSCHEIDER FÜR EIN FILMKÜHLLOCH | [2021/51] | English: | AIRFOIL WITH DIRT SEPARATOR FOR A FILM COOLING HOLE | [2021/51] | French: | PROFILE AÉRODYNAMIQUE AVEC SÉPARATEUR DE SALETÉS POUR UN TROU DE REFROIDISSEMENT PAR FILM | [2021/51] |
| Former [2019/30] | SCHMUTZABSCHEIDER FÜR INTERN GEKÜHLTE KOMPONENTEN | ||
| Former [2019/30] | DIRT SEPARATOR FOR INTERNALLY COOLED COMPONENTS | ||
| Former [2019/30] | SÉPARATEUR DE SALETÉS POUR DES COMPOSANTS À REFROIDISSEMENT INTERNE | Examination procedure | 24.01.2020 | Amendment by applicant (claims and/or description) | 24.01.2020 | Examination requested [2020/10] | 24.01.2020 | Date on which the examining division has become responsible | 14.12.2021 | Communication of intention to grant the patent | 16.12.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 28.01.2022 | Communication of intention to grant the patent | 06.06.2022 | Fee for grant paid | 06.06.2022 | Fee for publishing/printing paid | 06.06.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 14.04.2023 | No opposition filed within time limit [2023/25] | Fees paid | Renewal fee | 20.01.2021 | Renewal fee patent year 03 | 20.01.2022 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 17.01.2019 | HU | 17.01.2019 | AL | 13.07.2022 | AT | 13.07.2022 | BG | 13.07.2022 | CZ | 13.07.2022 | DK | 13.07.2022 | EE | 13.07.2022 | ES | 13.07.2022 | FI | 13.07.2022 | HR | 13.07.2022 | IT | 13.07.2022 | LT | 13.07.2022 | LV | 13.07.2022 | MC | 13.07.2022 | NL | 13.07.2022 | PL | 13.07.2022 | RO | 13.07.2022 | RS | 13.07.2022 | SE | 13.07.2022 | SI | 13.07.2022 | SK | 13.07.2022 | SM | 13.07.2022 | TR | 13.07.2022 | NO | 13.10.2022 | GR | 14.10.2022 | IS | 13.11.2022 | PT | 14.11.2022 | IE | 17.01.2023 | LU | 17.01.2023 | BE | 31.01.2023 | CH | 31.01.2023 | LI | 31.01.2023 | [2026/04] |
| Former [2025/39] | CY | 17.01.2019 | |
| HU | 17.01.2019 | ||
| AL | 13.07.2022 | ||
| AT | 13.07.2022 | ||
| BG | 13.07.2022 | ||
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| EE | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| IT | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| MC | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SI | 13.07.2022 | ||
| SK | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| IE | 17.01.2023 | ||
| LU | 17.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| Former [2025/36] | CY | 17.01.2019 | |
| AL | 13.07.2022 | ||
| AT | 13.07.2022 | ||
| BG | 13.07.2022 | ||
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| EE | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| IT | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| MC | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SI | 13.07.2022 | ||
| SK | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| IE | 17.01.2023 | ||
| LU | 17.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| Former [2024/51] | AL | 13.07.2022 | |
| AT | 13.07.2022 | ||
| BG | 13.07.2022 | ||
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| EE | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| IT | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| MC | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SI | 13.07.2022 | ||
| SK | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| IE | 17.01.2023 | ||
| LU | 17.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| Former [2024/29] | AL | 13.07.2022 | |
| AT | 13.07.2022 | ||
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| EE | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| IT | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| MC | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SI | 13.07.2022 | ||
| SK | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| IE | 17.01.2023 | ||
| LU | 17.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| Former [2024/11] | AL | 13.07.2022 | |
| AT | 13.07.2022 | ||
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| EE | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| IT | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SI | 13.07.2022 | ||
| SK | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| IE | 17.01.2023 | ||
| LU | 17.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| Former [2024/08] | AL | 13.07.2022 | |
| AT | 13.07.2022 | ||
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| EE | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SI | 13.07.2022 | ||
| SK | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| IE | 17.01.2023 | ||
| LU | 17.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| Former [2023/49] | AL | 13.07.2022 | |
| AT | 13.07.2022 | ||
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| EE | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SI | 13.07.2022 | ||
| SK | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| LU | 17.01.2023 | ||
| BE | 31.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| Former [2023/47] | AL | 13.07.2022 | |
| AT | 13.07.2022 | ||
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| EE | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SI | 13.07.2022 | ||
| SK | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| LU | 17.01.2023 | ||
| CH | 31.01.2023 | ||
| LI | 31.01.2023 | ||
| Former [2023/43] | AL | 13.07.2022 | |
| AT | 13.07.2022 | ||
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| EE | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SI | 13.07.2022 | ||
| SK | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| LU | 17.01.2023 | ||
| Former [2023/37] | AL | 13.07.2022 | |
| AT | 13.07.2022 | ||
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| EE | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SI | 13.07.2022 | ||
| SK | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| Former [2023/29] | AL | 13.07.2022 | |
| AT | 13.07.2022 | ||
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| EE | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SK | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| Former [2023/23] | AT | 13.07.2022 | |
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| EE | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SK | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| Former [2023/22] | AT | 13.07.2022 | |
| CZ | 13.07.2022 | ||
| DK | 13.07.2022 | ||
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RO | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| Former [2023/21] | DK | 13.07.2022 | |
| ES | 13.07.2022 | ||
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| Former [2023/20] | ES | 13.07.2022 | |
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| SM | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| Former [2023/12] | ES | 13.07.2022 | |
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| IS | 13.11.2022 | ||
| PT | 14.11.2022 | ||
| Former [2023/11] | ES | 13.07.2022 | |
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| PL | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| PT | 14.11.2022 | ||
| Former [2023/10] | ES | 13.07.2022 | |
| FI | 13.07.2022 | ||
| HR | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| GR | 14.10.2022 | ||
| PT | 14.11.2022 | ||
| Former [2023/09] | ES | 13.07.2022 | |
| FI | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| LV | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| PT | 14.11.2022 | ||
| Former [2023/08] | ES | 13.07.2022 | |
| FI | 13.07.2022 | ||
| LT | 13.07.2022 | ||
| NL | 13.07.2022 | ||
| RS | 13.07.2022 | ||
| SE | 13.07.2022 | ||
| NO | 13.10.2022 | ||
| Former [2023/06] | NL | 13.07.2022 | Documents cited: | Search | [XYI] GB2262314 (ROLLS ROYCE PLC et al.) [X] 1-4,6-8,10-14 * figure 3 * * page 5, line 16 - page 6, line 25 *[Y] 5 [I] 9,15 | [XYI] EP1262631 (UNITED TECHNOLOGIES CORP et al.) [X] 1-3,6,10,11,13,14 * figure 4 * * paragraph [0025] *[Y] 4,5,7,8,12 [I] 9,15 | [Y] EP2993304 (UNITED TECHNOLOGIES CORP et al.) [Y] 5 * figure 6 * * paragraph [0044] * | [Y] US2016375610 (VOLLEBREGT MATTHIEU JEAN LUC et al.) [Y] 4,7,8,12 * figure 8 * * paragraph [0047] - paragraph [0050] * |