EP3496194 - METHOD FOR PRODUCING A MEMBRANE ELECTRODE UNIT HAVING A PERIPHERAL SEAL, AND MEMBRANE ELECTRODE UNIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.03.2023 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 02.04.2022 | ||
Former | Grant of patent is intended Status updated on 18.11.2021 | ||
Former | Examination is in progress Status updated on 19.03.2021 | ||
Former | Request for examination was made Status updated on 13.12.2019 | ||
Former | The application has been published Status updated on 10.05.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Carl Freudenberg KG Höhnerweg 2-4 69469 Weinheim / DE | [2019/24] | Inventor(s) | 01 /
Bauer, Felix Willibaldstr. 26 80689 München / DE | 02 /
Wolz, Christian Zur Niedermühle 18 85435 Erding / DE | [2019/30] |
Former [2019/24] | 01 /
Bauer, Felix Willibaldstr. 26 80689 München / DE | ||
02 /
Wolz, Christian Josef-Wiesberger-Str. 3 85540 Haar / DE | Representative(s) | Grättinger Möhring von Poschinger Patentanwälte Partnerschaft mbB Wittelsbacherstrasse 2b 82319 Starnberg / DE | [2022/18] |
Former [2019/24] | Grättinger Möhring von Poschinger Patentanwälte Partnerschaft Wittelsbacherstrasse 2b 82319 Starnberg / DE | Application number, filing date | 19153415.5 | 23.08.2014 | [2019/24] | Priority number, date | DE20131014083 | 27.08.2013 Original published format: DE102013014083 | [2019/24] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3496194 | Date: | 12.06.2019 | Language: | DE | [2019/24] | Type: | B1 Patent specification | No.: | EP3496194 | Date: | 04.05.2022 | Language: | DE | [2022/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.03.2019 | Classification | IPC: | H01M8/02, H01M8/10, H01M8/0284, H01M8/0276, H01M8/1004, H01M8/086, H01M8/242, H01M4/86, H01M8/2483, H01M8/2484, H01M8/0273, H01M8/1018 | [2019/24] | CPC: |
H01M8/0276 (EP,KR);
H01M8/0273 (US);
H01M4/86 (US);
H01M8/0284 (EP,KR,US);
H01M8/086 (EP,KR,US);
H01M8/1004 (KR,US);
H01M8/242 (US);
H01M8/2483 (US);
H01M8/2484 (US);
H01M2004/8694 (US);
H01M2008/1095 (EP,US);
Y02E60/50 (EP,KR);
Y02P70/50 (KR,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/03] |
Former [2019/24] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR HERSTELLUNG EINER MEMBRAN-ELEKTRODEN-EINHEIT MIT UMLAUFENDER DICHTUNG SOWIE MEMBRAN-ELEKTRODEN-EINHEIT | [2019/24] | English: | METHOD FOR PRODUCING A MEMBRANE ELECTRODE UNIT HAVING A PERIPHERAL SEAL, AND MEMBRANE ELECTRODE UNIT | [2019/24] | French: | PROCÉDÉ DE FABRICATION D'UNE UNITÉ MEMBRANE-ÉLECTRODE POURVUE D'UN JOINT D'ÉTANCHÉITÉ PÉRIPHÉRIQUE ET UNITÉ MEMBRANE-ÉLECTRODE | [2019/24] | Examination procedure | 10.12.2019 | Amendment by applicant (claims and/or description) | 10.12.2019 | Examination requested [2020/03] | 10.12.2019 | Date on which the examining division has become responsible | 18.03.2021 | Despatch of a communication from the examining division (Time limit: M02) | 28.05.2021 | Reply to a communication from the examining division | 19.11.2021 | Communication of intention to grant the patent | 29.03.2022 | Fee for grant paid | 29.03.2022 | Fee for publishing/printing paid | 29.03.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14761949.8 / EP3039734 | Opposition(s) | 07.02.2023 | No opposition filed within time limit [2023/15] | Fees paid | Renewal fee | 24.01.2019 | Renewal fee patent year 03 | 24.01.2019 | Renewal fee patent year 04 | 24.01.2019 | Renewal fee patent year 05 | 30.08.2019 | Renewal fee patent year 06 | 31.08.2020 | Renewal fee patent year 07 | 31.08.2021 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.08.2014 | AL | 04.05.2022 | CY | 04.05.2022 | CZ | 04.05.2022 | EE | 04.05.2022 | ES | 04.05.2022 | FI | 04.05.2022 | HR | 04.05.2022 | LT | 04.05.2022 | LV | 04.05.2022 | MC | 04.05.2022 | MK | 04.05.2022 | PL | 04.05.2022 | RO | 04.05.2022 | RS | 04.05.2022 | SE | 04.05.2022 | SI | 04.05.2022 | SK | 04.05.2022 | SM | 04.05.2022 | TR | 04.05.2022 | BG | 04.08.2022 | NO | 04.08.2022 | GR | 05.08.2022 | IE | 23.08.2022 | LU | 23.08.2022 | IS | 04.09.2022 | PT | 05.09.2022 | [2024/29] |
Former [2024/27] | HU | 23.08.2014 | |
AL | 04.05.2022 | ||
CY | 04.05.2022 | ||
CZ | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
MK | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IE | 23.08.2022 | ||
LU | 23.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/21] | HU | 23.08.2014 | |
AL | 04.05.2022 | ||
CY | 04.05.2022 | ||
CZ | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IE | 23.08.2022 | ||
LU | 23.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/18] | HU | 23.08.2014 | |
AL | 04.05.2022 | ||
CZ | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IE | 23.08.2022 | ||
LU | 23.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/33] | AL | 04.05.2022 | |
CZ | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IE | 23.08.2022 | ||
LU | 23.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/25] | AL | 04.05.2022 | |
CZ | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
LU | 23.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/21] | AL | 04.05.2022 | |
CZ | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
LU | 23.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/17] | AL | 04.05.2022 | |
CZ | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/16] | CZ | 04.05.2022 | |
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/09] | CZ | 04.05.2022 | |
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/51] | ES | 04.05.2022 | |
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/50] | ES | 04.05.2022 | |
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/49] | ES | 04.05.2022 | |
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/47] | ES | 04.05.2022 | |
FI | 04.05.2022 | ||
LT | 04.05.2022 | ||
SE | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | Documents cited: | Search | [A]DE19703214 (MAGNET MOTOR GMBH [DE]) [A] 1-15 * claim 14 ** figure 1 *; | [A]WO9904446 (BALLARD POWER SYSTEMS [CA], et al) [A] 1-15 * the whole document *; | [A]WO0010216 (GORE ENTERPRISE HOLDINGS INC [US]) [A] 1-15 * page 1, line 11 - line 14 * * page 1, line 28 - page 2, line 10 * * page 4, line 11 - line 26 * * page 5, line 6 - page 6, line 15 *; | [A]EP1276164 (HONDA MOTOR CO LTD [JP]) [A] 1-15 * paragraph [0025] * * figure 2 *; | [A]WO2004047210 (PROTONEX TECHNOLOGY CORP [US], et al) [A] 1-15 * claim 39 *; | [XAI]EP1526593 (BALLARD POWER SYSTEMS [CA]) [X] 11,12 * paragraph [0003] * * paragraph [0026] * * paragraph [0021] * * paragraph [0024] * * paragraph [0025] * * paragraph [0028] * * paragraph [0029] * * paragraph [0032] - paragraph [0035] * * paragraph [0043] * * paragraph [0044] * * claims 15-20 * [A] 1-10 [I] 13-15; | [XAI]DE102006004748 (UMICORE AG & CO KG [DE]) [X] 11,12 * paragraph [0019] * * paragraph [0031] * [A] 1-10 [I] 13-15; | [A]US2009162732 (NOBLET MARC [FR], et al) [A] 1-15 * paragraph [0049] * * paragraph [0005] - paragraph [0006] * * paragraph [0048] * * paragraph [0006] * * paragraph [0049] - paragraph [0050] * * figure 2 * |