blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3689758

EP3689758 - A FLUID TRANSFER SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  14.01.2022
Database last updated on 02.08.2024
FormerThe patent has been granted
Status updated on  05.02.2021
FormerGrant of patent is intended
Status updated on  11.10.2020
FormerExamination is in progress
Status updated on  04.12.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Airbus Defence and Space Limited
Gunnels Wood Road
Stevenage
Hertfordshire SG1 2AS / GB
[2020/32]
Inventor(s)01 / Gregory, Juliet
Airburs Defence and Space Limited
Gunnels Wood Road
Stevenage, Hertfordshire SG1 2AS / GB
02 / Sadler, James
Airburs Defence and Space Limited
Gunnels Wood Road
Stevenage, Hertfordshire SG1 2AS / GB
03 / Bentall, William
Airburs Defence and Space Limited
Gunnels Wood Road
Stevenage, Hertfordshire SG1 2AS / GB
 [2020/32]
Representative(s)Newcombe, Christopher David
Venner Shipley LLP
200 Aldersgate
London EC1A 4HD / GB
[2020/32]
Application number, filing date19154848.631.01.2019
[2020/32]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3689758
Date:05.08.2020
Language:EN
[2020/32]
Type: B1 Patent specification 
No.:EP3689758
Date:10.03.2021
Language:EN
[2021/10]
Search report(s)(Supplementary) European search report - dispatched on:EP12.07.2019
ClassificationIPC:B64G1/40, B64G1/64, B64D39/00, B64D39/06
[2020/32]
CPC:
B64D39/00 (EP); B64G1/402 (US); B64D39/06 (EP);
B64G1/4024 (EP); B64G1/64 (EP); B64G1/646 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/32]
TitleGerman:FLUIDTRANSFERSYSTEM[2020/32]
English:A FLUID TRANSFER SYSTEM[2020/32]
French:SYSTÈME DE TRANSFERT DE FLUIDE[2020/32]
Examination procedure13.09.2019Amendment by applicant (claims and/or description)
13.09.2019Examination requested  [2020/32]
13.09.2019Date on which the examining division has become responsible
09.12.2019Despatch of a communication from the examining division (Time limit: M04)
23.01.2020Reply to a communication from the examining division
12.10.2020Communication of intention to grant the patent
26.01.2021Fee for grant paid
26.01.2021Fee for publishing/printing paid
26.01.2021Receipt of the translation of the claim(s)
Opposition(s)13.12.2021No opposition filed within time limit [2022/07]
Fees paidRenewal fee
25.01.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.01.2019
AL10.03.2021
AT10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
MK10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
TR10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
[2024/29]
Former [2024/25]HU31.01.2019
AL10.03.2021
AT10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
MK10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2024/23]AL10.03.2021
AT10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
MK10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2024/20]AL10.03.2021
AT10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/39]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/23]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/10]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2022/08]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/07]AL10.03.2021
AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/52]AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/51]AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/50]AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2021/48]AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RS10.03.2021
SE10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/46]AT10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RS10.03.2021
SE10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/43]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RS10.03.2021
SE10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/38]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
SE10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/37]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/36]FI10.03.2021
HR10.03.2021
LT10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/35]FI10.03.2021
HR10.03.2021
LT10.03.2021
NO10.06.2021
Former [2021/33]FI10.03.2021
LT10.03.2021
NO10.06.2021
Documents cited:Search[A]US2001023710  (TUNG KONG CARL CHEUNG [US], et al) [A] 1-15 * page 1, paragraph 5 * * page 6, paragraph 30 - paragraph 33; figure 6 *;
 [Y]US7257940  (KNIGHT ANDREW F [US]) [Y] 1-15 * column 5, line 50 - column 6, line 19 * * column 15, line 63 - column 16, line 38; figures 1-3,14 *;
 [A]US2012000575  (YANDLE TOM [US], et al) [A] 1-15* the whole document *;
 [Y]US2012325972  (GRYNIEWSKI LAWRENCE [CA], et al) [Y] 1-15 * page 3, paragraph 46 - paragraph 52 * * page 6, paragraph 81 - paragraph 82; figures 1,1a,11 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.