EP3521708 - STEAM CONTROL SYSTEM FOR MULTIZONE OVEN [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.02.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 12.03.2021 | ||
Former | Grant of patent is intended Status updated on 05.08.2020 | ||
Former | Request for examination was made Status updated on 14.02.2020 | ||
Former | The application has been published Status updated on 05.07.2019 | Most recent event Tooltip | 17.05.2024 | Lapse of the patent in a contracting state New state(s): HU | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states Alto-Shaam, Inc. W164 N9221 Water Street Menomonee Falls, WI 53051 / US | [2021/07] |
Former [2021/01] | For all designated states Appliance Innovation Inc. 10500 Metric Dr. Suite 128 Dallas, TX 75243 / US | ||
Former [2019/32] | For all designated states Appliance Innovations, Inc. 10500 Metric Drive, Suite 128 Dallas, TX 75243 / US | Inventor(s) | 01 /
MCKEE, Philip R. 6 Windsor Ridge Frisco, TX Texas 75034 / US | 02 /
VANLANEN, Lee Thomas 1820 Creekview Circle McKinney, TX Texas 75069 / US | 03 /
MADDOX, Jeff 4713 Vera Cruz Drive Garland, TX Texas 75043 / US | [2019/32] | Representative(s) | J A Kemp LLP 80 Turnmill Street London EC1M 5QU / GB | [N/P] |
Former [2021/15] | J A Kemp LLP 14 South Square Gray's Inn London WC1R 5JJ / GB | ||
Former [2019/32] | J A Kemp 14 South Square Gray's Inn London WC1R 5JJ / GB | Application number, filing date | 19155339.5 | 04.02.2019 | [2019/32] | Priority number, date | US201815888669 | 05.02.2018 Original published format: US201815888669 | [2019/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3521708 | Date: | 07.08.2019 | Language: | EN | [2019/32] | Type: | B1 Patent specification | No.: | EP3521708 | Date: | 14.04.2021 | Language: | EN | [2021/15] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.07.2019 | Classification | IPC: | F24C15/32 | [2019/32] | CPC: |
F24C15/327 (EP,US);
A21B3/04 (US);
A47J37/0641 (CN);
A47J37/0664 (CN);
F24C15/322 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/12] |
Former [2019/32] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DAMPFKONTROLLSYSTEM FÜR MEHRZONIGEN OFEN | [2019/32] | English: | STEAM CONTROL SYSTEM FOR MULTIZONE OVEN | [2019/32] | French: | SYSTÈME DE COMMANDE DE VAPEUR POUR FOUR MULTIZONE | [2019/32] | Examination procedure | 06.02.2020 | Amendment by applicant (claims and/or description) | 06.02.2020 | Examination requested [2020/12] | 06.02.2020 | Date on which the examining division has become responsible | 06.08.2020 | Communication of intention to grant the patent | 22.01.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 02.03.2021 | Fee for grant paid | 02.03.2021 | Fee for publishing/printing paid | 02.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 17.01.2022 | No opposition filed within time limit [2022/12] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 02.03.2021 | Request for further processing filed | 02.03.2021 | Full payment received (date of receipt of payment) Request granted | 11.03.2021 | Decision despatched | Fees paid | Renewal fee | 26.02.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.02.2019 | AL | 14.04.2021 | AT | 14.04.2021 | CY | 14.04.2021 | CZ | 14.04.2021 | DK | 14.04.2021 | EE | 14.04.2021 | FI | 14.04.2021 | HR | 14.04.2021 | LT | 14.04.2021 | LV | 14.04.2021 | MC | 14.04.2021 | MK | 14.04.2021 | NL | 14.04.2021 | PL | 14.04.2021 | RO | 14.04.2021 | RS | 14.04.2021 | SE | 14.04.2021 | SI | 14.04.2021 | SK | 14.04.2021 | SM | 14.04.2021 | BG | 14.07.2021 | NO | 14.07.2021 | GR | 15.07.2021 | IS | 14.08.2021 | PT | 16.08.2021 | [2024/25] |
Former [2024/23] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CY | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
MK | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2024/20] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CY | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/44] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/29] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/26] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/23] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/10] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/08] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/07] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/52] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/51] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/50] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
Former [2021/49] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
Former [2021/47] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
LT | 14.04.2021 | ||
NL | 14.04.2021 | ||
BG | 14.07.2021 | ||
Former [2021/46] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
LT | 14.04.2021 | Documents cited: | Search | [A]FR2699650 (SOREMEM [FR]) [A] 1-15* figure 5; claim 3 *; | [A]US6773738 (BERGER UWE [DE], et al) [A] 1-15 * claims 6,7 *; | [A]EP1715251 (MATSUSHITA ELECTRIC IND CO LTD [JP]) [A] 1-15 * claims 1,2 *; | [A]US2014083309 (REESE ROBERT J [US], et al) [A] 1-15 * paragraphs [0135] , [0152]; figures 3,31 * | by applicant | US6188045 | US7307244 | US8997730 | US2016356506 | US2016356504 | US9677774 | US2017211819 |